MLEM and IP Data Fuel Confidence for November Drill Testing
Released
Released
Announcement PDF
ASX Announcement | 11th November, 2024
New Ground MLEM and IP Data Fuel Confidence for November Drill
Testing at, Patmungula, and Mount Irene & Dumunzi.
Highlights
• Litchfield Minerals is excited to launch our second drilling campaign this year, with
plans to drill up to 2,000 metres across three high-impact target areas.
• A recentMLEM (MovingLoopElectromagnetic)surveyhasrevealeda stronglate-time
conductor at our Patmungula Pb site.
• Additional IP (Induced Polarisation) data has further validated the significant
chargeability anomaly at Mount Irene, located 500m west of the known outcrop.
• Our upcoming drilling program includes testing Dumunzi’s compelling magnetic and
gravity targets, along with Patmungula Pb Late time EM conductor and Mount Irene’s
IP anomaly.
• Due to the weather, earth-moving equipment will be deployed in approximately 10
days to build access tracks and drill pads.
• Drilling to commence as soon as preparations are complete.
Litchfield Minerals Limited (“Litchfield” or the “Company”) (ASX:LMS), a company with a
strategic emphasis on critical minerals, is pleased to announce the completion of Ground EM
and Pole-Dipole IP surveys at the Mt Doreen project.
Managing Director and CEO, Matthew Pustahya, commented:
We are entering an exciting phase at Litchfield Minerals as we kick off our second major
drilling campaign this year. The results from recent ground MLEM and IP surveys have
illuminated some truly compelling targets at Patmungula Pb, Mount Irene, and Dumunzi,
positioning us well to uncover the mineral potential in these areas.
With up to 2,000 metres planned across some promising targets, this campaign underscores
our commitment to ambitious, data-driven exploration in Northern Territory’s mineral-rich
terrain. As we approach year-end, we look forward to delivering results that could redefine
the scope and value of our projects.
Drill targets & plan
Patmungula MLEM target
The Patmungala Pb conductor is the second strongest anomaly identified from the VTEM
survey (after Silver King). Three lines of moving loop EM (MLEM) surveys have been
completed to confirm the basement source for the conductor and to inform modelling its
geometry to aid drillhole planning (Figure 1). The anomaly sits in a prominent structural
position where the strike changes from northwest to easterly trend. The MLEM survey has
detected a strong, late-time conductor and modelling has defined a series of 400m long
conductor plates with a gentle westerly plunge starting from about 70m below surface. The
top cluster of plates dip moderately to the south and the bottom series of plates dip gently
to the north. Two RC drillholes have been planned to test the basement conductor for base
metal sulphide mineralisation.
Figure 1. Patmungala Pb Google satellite image with 20z Ground EM conductivity image, modelled basement
conductor plates and planned RC drillholes.
Mount Irene PDIP target
Three lines of Pole-Dipole IP (PDIP) surveys have been completed at the Mt Irene prospect to
follow-upastrongchargeabilityanomalydefinedintheMarch2024PDIPsurvey. Thesurveys
have confirmed the presence of a steeply-dipping, moderately strong chargeability anomaly
(15mV/V)onthecentralline(7562375N)withadepthtotopof150m (Figure2). Theanomaly
extends 200m to the southwest onto line 7562175N where it forms a broader, 10mV/V
anomalyanddecreasestoashallow,low-levelconductorontheline200mnorth(7562575N).
A single 250m RC hole has been planned to test the main chargeability anomaly on Line
7562375N.
Figure 2. Dumunzi 2024 ground gravity survey (BA267_Res500m_H_NEsun) over 2024 airborne magnetics
(RTP_SunN_Lin) showing the location of the proposed holes relative to the main gravity anomaly and positive
magnetic highs.
Dumunzi Gravity + Mag targets
The Dumunzi target comprises a series of gravity and magnetic anomalies aligned within an
east-northeast trending gravity corridor (Figure 3). Magnetic modelling indicates the
presenceofbothhighmagneticandreverselymagnetisedbodiesthatarespatiallyoffsetfrom
gravity anomalies within this corridor. The 3D modelling indicates vertical pipe-like
geometries for gravity and magnetic anomalies. Dumunzi potentially hosts a multi-phase
carbonatite intrusive complex and four RC drillholes have been planned to test for possible
associated REE mineralisation.
Figure 3. Dumunzi 2024 ground gravity survey (BA267_Res500m_H_NEsun) over 2024 airborne magnetics
(RTP_SunN_Lin) showing the location of the proposed holes relative to the main gravity anomaly and positive
magnetic highs.
Cautionary Statement
Conductive VTEM targets presented in this announcement have been interpreted to
represent basement conductors relating to semi-massive or massive sulphides, however, it is
unclear if base metal sulphides are present. Ground EM is required to confirm the basement
source and conductor geometry ahead of RC drilling.
Forward looking statement
This announcement may include forward-looking statements, which are subject to risks and
uncertainties. Actual results could differ significantly due to factors beyond LMS’s control,
including market conditions and industry-specific risks. These forward-looking statements
are based on the Company’s expectations and beliefs concerningfuture events. No warranty
is given regardingthe completeness of the information provided. Pleaseavoid placing undue
reliance on forward-looking statements, as they reflect views only as of the announcement
date.
About Litchfield Minerals
Litchfield Minerals is a critical mineral explorer, primarily searching for base metals and
uranium out of the Northern Territory of Australia. Our mission is to be a pioneering copper
exploration company committed to delivering cost-effective, innovative and sustainable
exploration solutions. We aim to unlock the full potential of copper and other mineral
resources while minimising environmental impact, ensuring the longevity and affordability of
this essential metal for future generations. We are dedicated to involving cutting-edge
technology, responsible practices and stakeholder collaboration drives us to continuously
redefinetheindustrystandardsanddelivervaluetoourinvestors,communitiesandtheworld.
The announcement has been approved by the Board of Directors.
For further information please contact:
Matthew Pustahya
Matthew@litchfieldminerals.com.au
Follow us on:
www.litchfieldminerals.com.au
https://twitter.com/Litchfield_LMS
https://www.linkedin.com/company/litchfield-minerals-limited/
Competent Person’s Statement
The information in this Presentation that relates to Exploration Results is based on, and fairly
represents, information and supporting documentation compiled by Mr Russell Dow (MSc,
BScHonsGeology),aCompetent PersonwhoisaMemberoftheAustralian InstituteofMining
and Metallurgy (AUSIMM) and is a full-time employee of Litchfield Minerals Limited. Mr Dow
has sufficient experience that is relevant to the style of mineralisation and types of deposits
under consideration and to the activity beingundertaken to qualify as a Competent Person as
defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves” (JORC Code). Mr Dow consents to the inclusion in the
report of the matters based on his information in the form and context in which it appears.
With regard to the Company’s ASX Announcements referenced in the above Announcement,
the Company is not aware of any new information or data that materially affects the
information included in the Announcements.
Edition – Table 1 report
JORC Code, 2012 Edition – Table 1 report
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Natureandquality of sampling(e.g.cutchannels,randomchips,
or specific specialised industry standard measurement tools
appropriate to the minerals under investigation, such as down
hole gamma sondes, or handheld XRF instruments, etc). These
examples should not be taken as limiting the broad meaning of
sampling.
• Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determinationof mineralisation thatare Material
to the Public Report.
• In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other cases more
explanation may be required, such as where there is coarse gold
that has inherent sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules) may warrant
disclosure of detailed information.
The instruments and parameters used for the VTEM survey are as
follow:
HAITEM MLEM (Ground EM)
• Data was collected by Planetary Geophysics Pty. Ltd. In
Oct/Nov 2024
• Survey type: Moving Loop EM
• Configuration: Outerloop/Slingram
• Loop Size: 100m
• Coil Offset: 100m
• Along line station spacing: 50m
• Tx Loop Conductor: 10mm²
• Current in Tx Loop: 25A - 80A
• Timing: 20/80ms
• Transmitter: Technical Images HAITEM Tx HPX 100A
Criteria JORC Code explanation Commentary
• Receiver: Technical Images HAITEM Rx Gen 4
• Coil: Technical Images HAITEM 3 Component Coil
• Data was processed with TI Ground EM Viewer Maxwell
Pole-Dipole IP Survey
• Pole-dipole IP/Resistivity time series data was acquired
with V-Full Waver IP/Resistivity Receivers in a distributed
pole-dipole array read in both senses C>P & C<P and with
the I-Full Waver Current Recorder recording full wave form
transmission data.
• All Receivers and the full wave form Current Recorder are
manufactured by Iris Instruments of Orleans, France
(www.iris-instruments.com).
• Pole-dipole current in injection was via one (1x) GDD TX4
5000W/20A transmitter manufactured by GDD
instrumentation of Quebec Canada
(www.gddintrumentation.com).
• Transmitters were powered by one (1x) Kubota 9000W
Diesel Generator.
Criteria JORC Code explanation Commentary
Pole-Dipole Data Acquisition
• Tx Electrode Type: Aluminium foil lined pit (Remote CA) &
10mm welded mesh (Forward CB)
• Rx Electrode Type: CuSO4 Non-polarising porous pot
• Tx wire Type: 2.5mm Cu conductor
• Rx wire Type: 1.5mm Cu conductor
• Rx Line spacing: 100m
• Rx Dipole spacing: 50m.
• Time Base: 2s ON/2s OFF
• Windows: 20
• Timing Windows (ms):
20/20/20/20/40/40/40/40/80/80/80/80/
120/120/120/120/180/180/180/180
• mDelay (ms): 70
Intrument technical specifications
• Tx Receivers:
• Iris V-Fullwaver Receiver
• Channels: 2
• Input voltage: Max. input voltage: 15 V, Protection: up to
1000V
Criteria JORC Code explanation Commentary
• Voltage measurement: Accuracy: 0.2 %, typical Resolution:
1 µV, Minimum value: 1 µV
• Input impedance: 100 MΩ
• Signal waveform: All IP measurements were made in the
time-domain using a two second half-duty cycle (2s ON/2s
OFF). An integration window of 0.5 to 1.1 seconds has
been used for the final chargeability calculation.
• GPS input for coordinates and synchronisation
• Computation of apparent resistivity, average chargeability,
and standard deviation
• Noise reduction: Read duration manually selected in
relation to apparent injection point current (mA) and
power line rejection, SP linear drift correction.
• Iris I-Fullwaver Current Recorder
• Input current: +/- 25000mA (optional 6, 15 or 50A)
• Resolution / Accuracy: 0.1mA / 0.1%
• GPS: GPS input for coordinates and time synchronisation.
Time stamps record within an absolute accuracy of 250us.
• Readings: Current value
• Typically three (3x), 300 second (~75x cycle stacks) reads
at each injection point.
• GDD TX IV 5000 Transmitter
Criteria JORC Code explanation Commentary
• Output Power: 0 to 5000 W
• Input voltage: Standard 240V 50hz
• Output Voltage Range: 150V to 2400V
• Output Current: 30mA to 20000mA
• Transmission Cycle: ON+, OFF, ON-, OFF:
• Timing: 1s, 2s, 4s, or 8s
• Data processed by FW Viewer Prosys III TQIP WinDisp
Res2D
Drilling
techniques
• Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is oriented and if so, by
what method, etc).
• Not applicable as no drilling is reported.
Drill sample
recovery
• Method of recording and assessing core and chip sample
recoveries and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
• Not applicable as no drilling is reported.
Logging • Whether core and chip samples have been geologically and • Not applicable as no drilling is reported.
Criteria JORC Code explanation Commentary
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
• Whetherloggingis qualitative orquantitative innature.Core(or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections
logged.
Sub-
sampling
techniques
and sample
preparation
• Ifcore,whethercutorsawnandwhetherquarter,halforallcore
taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of
the sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages
to maximise representivity of samples.
• Measures taken to ensure that the sampling is representative of
the in situ material collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the
material being sampled.
• Not applicable as no drilling is reported.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
• Forgeophysicaltools,spectrometers,handheldXRFinstruments,
etc, the parameters used in determining the analysis including
Geophysical details
• See loop configuration and system specifications above.
Criteria JORC Code explanation Commentary
instrument make and model, reading times, calibrations factors
applied and their derivation, etc.
• Nature of quality control procedures adopted (e.g. standards,
blanks, duplicates, external laboratory checks) and whether
acceptablelevelsofaccuracy(i.e.lackofbias)andprecisionhave
been established.
Verification
of sampling
and
assaying
• Theverificationofsignificantintersectionsbyeitherindependent
or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Data detailed in this report has been reviewed and
processed by Russell Mortimer at Southern Geoscience
Consultants.
Location of
data points
• Accuracy and quality of surveys used to locate drill holes (collar
and down-hole surveys), trenches, mine workings and other
locations used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Lines were gridded byPlanetary Geophysics using a Garmin
Map 65 series GPS.
• Waypoints were recorded at every station using
GDA94/UTM.
Data
spacing and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• Ground EM was done at 200m line-spacing on north-south
oriented lines.
• PDIP was done on three, 200m spaced east-west lines.
Criteria JORC Code explanation Commentary
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introducedasamplingbias,thisshouldbeassessedandreported
if material.
• Survey lines were oriented perpendicular to known
structure and stratigraphic controls.
Sample
security
• The measures taken to ensure sample security. • All data was collected under strict data security measures
by Planetary Geophysics Pty Ltd.
Audits or
reviews
• The results of any audits or reviews of sampling techniques and
data.
• Data checks and processing reviews were undertaken daily
and at the completion of the program by the contractor.
• Review of the data was undertaken by an independent
consultant Russell Mortimer at Southern Geoscience
Consultants.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral
tenement
and land
tenure
status
• Type,referencename/number,locationandownershipincluding
agreements or material issues with third parties such as joint
ventures,partnerships,overridingroyalties,nativetitleinterests,
historical sites, wilderness or national park and environmental
settings.
• Refer to Section 4 in Independent Geologists Report (IGR)
by Ross et al., 2023 for further detail. In summary, the
Mount Doreen project is secured by EL 31305 for total of
approximately 388.35 square kilometres.
Criteria JORC Code explanation Commentary
• The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to operate
in the area.
• All tenements within the Mt Doreen are 100% owned by
Litchfield Minerals Ltd.
• The Mt Doreen Project is located 325km northwest of Alice
Springs pastoral lease. The tenements are in good standing
and there are no known impediments.
Exploration
done by
other
parties
• Acknowledgment and appraisal of exploration by other parties. • Refer to Section 6 and 7 in Independent Geologists Report
(IGR) by Ross et al,, 2023 for further detail. A summary of
previous exploration and mining is presented below:
• 1930- 1956: Minor amounts of copper and tungsten
extracted from Silver King, Clark, Mount Irene and Wolfram
Hill.
• 1969: NT Mines & Water Resources diamond drilling at
Clark workings.
• 1987 – 2006: White Industries/Mareeba Mining, Bruce and
Mules, MIM Exploration/Roebuck Resources, Track
Minerals, Poseidon Gold/Yuendumu Mining, BHP,
Homestake Gold, Rio Tinto Exploration and Tanami Gold
completed geological mapping, geochemical sampling,
airborne and ground geophysical surveys, and drilling
programs.
Criteria JORC Code explanation Commentary
Geology • Deposit type, geological setting and style of mineralisation. • Refer to Section 5 in Independent Geologists Report (IGR)
by Ross et al., 2023 for further detail. In summary:
• Mount Doreen is located in the southern portion of the
Paleoproterozoic Aileron Province of the Arunta Region.
• The oldest rocks at Mount Doreen are the multiply
deformedandmetamorphosedsiliciclasticsedimentsofthe
Lander Rock Formation. The younger volcano sedimentary
Patmungala Bedslie inthe south of the tenement,andboth
are intruded by the Yarunganyi Granite. Numerous major
faults strike close to east-west and often contain veins or
vein swarms of quartz, forming ridges. Neoproterozoic to
PalaeozoicsedimentaryrocksoftheNgaliaBasinoverliethe
Aileron basement in the southwest of the tenement and
along the southern boundary.
• Mineralisation is considered to be epigenetic intrusion-
related breccia and vein mineralisation with polymetallic
copper-lead-zinc-silver-molybdenite and tungsten.
Mineralisation is interpreted to be from varied sources and
associations as evidenced from mineralisation dating.
• The most prominent mineralisation is supergene copper at
Silver King with varying lead-zinc-silver in quartz veins and
shear zones.
Criteria JORC Code explanation Commentary
Drill hole
Information
• A summary of all information material to the understanding of
the exploration results including a tabulation of the following
information for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that
the information is not Material and this exclusion does not
detract from the understanding of the report, the Competent
Person should clearly explain why this is the case.
• No drilling or assaying is reported in this report.
Data
aggregation
methods
• In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations (e.g.
cutting of high grades) and cut-off grades are usually Material
and should be stated.
• Where aggregate intercepts incorporate short lengths of high
grade results and longer lengths of low grade results, the
procedure used for such aggregation should be stated and some
typicalexamples of suchaggregations shouldbe shownindetail.
• The assumptions used for any reporting of metal equivalent
values should be clearly stated.
• No drilling or assaying is reported in this report.
Relationship
between
• These relationships are particularly important in the reporting of
Exploration Results.
• No drilling or assaying is reported in this report.
Criteria JORC Code explanation Commentary
mineralisati
on widths
and
intercept
lengths
• Ifthegeometryofthemineralisationwithrespecttothedrillhole
angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are reported,
there should be a clear statement to this effect (e.g. ‘down hole
length, true width not known’).
Diagrams • Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view
of drill hole collar locations and appropriate sectional views.
• Projectlocationmapandplanmapofthedrillholelocations
with respect to each other and with respect to other
available data are included in the text.
• Drill hole locations have been determined with hand-held
GPS drill hole collar location (Garmin GPS 78s) +/- 5m in
X/Y/Z dimensions.
• Refer to Section 6 and 7 of the Independent Geologists
Report (IGR) by Ross et al., 2023.
Balanced
reporting
• Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high
grades and/or widths should be practiced to avoid misleading
reporting of Exploration Results.
• Individual gravity readings have not been reported, plans
within this report provide an adequate overview of the
ground gravity data.
Other
substantive
exploration
data
• Other exploration data, if meaningful and material, should be
reported including (but not limited to): geological observations;
geophysical survey results; geochemical survey results; bulk
samples – size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
• See the main body of this report for all pertinent
observations and interpretations.
Criteria JORC Code explanation Commentary
substances.
Further
work
• The nature and scale of planned further work (e.g. tests for
lateral extensions or depth extensions or large-scale step-out
drilling).
• Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling
areas, provided this information is not commercially sensitive.
Future planned exploration includes:
• Final fully processed VTEM and interpretation
• Ground-based moving loop EM (“MLEM”)
• Geological mapping and geochemical surveys/ sampling
• RAB/RC/DD drill testing.
Share your feedback