Gossanous Copper Identified Above Priority Conductor
Released
Released
Announcement PDF
ASX Announcement 1st
September 2025
Gossanous Copper Iden�fied Above Priority Conductor; Scale and
Confidence Build
Key Highlights
• VTEM Conductor 1: In-situ gossanous material iden�fied, returning up to 8%Cu (XRF1
), directly
above the centre of the large VTEM conductor.
• VTEM Conductor 2: Field mapping shows presence of a dis�nc�ve plant species thattodatehas
only been observed in associa�on with the Oonagalabi Forma�on and copper-zinc
mineralisa�on, strengthening confidence in a sulphide source below.
• BombDiggity Cluster: Ground truthing reveals newexposuresofcopper mineralisa�on within
outcropping Oonagalabi Forma�on, extending poten�al strike length by afurther1km.
• Final VTEM data received: Mul�ple new targets extend north and south of Oonagalabi,
indica�ng the mineralised system has the poten�al to be a lot larger and more laterally
extensive than previously recognised.
• Access has been de-risked: LMS expect to have ground prepara�on machinery into VTEM 1,
VTEM2 and the Bomb Diggity clusterearly September, enabling a mul�-target RC program.
Litchfield Minerals Limited (ASX: LMS, “Litchfield” or “the Company”) is pleased to report highly
encouraging results from ground-truthing ac�vi�es at its Oonagalabi Project, following the recently
announced VTEM survey2
, which defined 14 Priority 1 conductors (LMS ASX Announcement 21 August
2025).
General Commentary
The VTEM program, announced August 21st
, 2025, had materially expanded the prospec�ve footprint
at Oonagalabi. The previously drilled outcrop sits within a mildly conduc�ve corridor that remains
mineralised, while stronger conductors north and south offer mul�ple, higher-priority sulphide targets
(Figure 1).
Several high-priority anomalies display responses consistent with sulphides. Three of the four priority
conductors that were ground-truthed, display mineralisa�on indicators, including both physical copper
mineralisa�on and geobotanical (plant) indicators known in this area.
These new data points strengthen our working view that the previously drilled exposed Oonagalabi
outcrop may be the distal ‘smoke’ rather than the core of the system. Reconnaissance mapping during
1
Disclaimer: XRF results are indicative only and are not a substitute for laboratory assays.
2
ASX Announcement 21/08/2025 - VTEM Survey Uncovers Multiple High Priority Sulphide Targets
VTEM ground-truthing has extended the outcropping mineralised Oonagalabi Forma�on by a further
1km.
Stronger altera�on above a weaker VTEM conductor at Bomb Diggity indicates that there is poten�ally
a mineral system which is larger than historically recognised and not constrained by earlier fault
interpreta�ons. We are poten�ally moving towards the core with the Phase 2 RC drilling program.
Given the scale and complexity of Oonagalabi, a systema�c drilling program is required to test the
poten�al of the full system. To test these targets properly, we’ll need strong Shareholder support for
the SPP as that will enable us to drill comprehensively and give this system the explora�on aten�on it
deserves.
Figure 1. Oonagalabi VTEM BFz30 conductivity image showing the Priority 1 conductors, preliminary anomaly
picks, interpreted prospective horizon, historic drillholes and proposed Phase 2 RC holes.
Managing Director, Mat Pustahya, commented:
“Ground-truthing and final VTEM data materially lift our conviction in Oonagalabi as a potentially
large, significant mineralised system. We’ve now confirmed gossanous copper directly above the VTEM
1high-priority conductor, mapped fresh exposures of the mineralised Oonagalabi Formation with
stronger alteration at theBomb Diggity conductive cluster, and logged multiple Priority 1 conductors
with clear indicators that fit a sulphide model. The only way to prove this is to drill, and that’s
exactly what we’re preparing to do.
Thisisabig,complexsystemanditdeservesapropermethodicaltestacrossseveralhigh-prioritytargets.
Our Share Purchase Plan was deliberately structured as a ‘thank you’ to shareholders who’ve backed us
through the past 18 months; this support is crucial and will help to directly fund a more comprehensive
program than our current cash balance alone would allow. With successful execution of the plan we’ve
mapped out, the next quarter has the potential to be genuinely company-defining.”
Conductor VT1 – Gossanous Copper Directly Above VTEM Anomaly
At the 500m long, highly conduc�ve VT1 target, gossanous copper occurs directly above the conductor
plate, with handheld XRF up to 8% Cu* (assays expected within 4 – 6 weeks). Gossan forms from the
oxida�on of fresh sulphides and this strong surface expression is consistent with sulphides at depth.
Figure 2. Gossan outcrop (482389E, 7438704N) showing classic ex-sulphide boxwork texture identified at VT1
immediately along strike from outcropping Oonagalabi Formation marble with oxidised copper mineralisation
present.
Based on visual es�mates, the gossan comprises massive iron oxide (90%), quartz (8%), disseminated
copper silicate (2% chrysocolla) and trace disseminated fresh chalcopyrite.
Mapping also iden�fied marble, calc-silicate and massive garnet-amphibole-quartz typical of the
mineralised Oonagalabi Forma�on. This area located 8km beyond previous work along the prospec�ve
horizon, points to a much larger system (Figure 2).
Conductor VT2 – Deep Sulphide Target Strengthened
VT2 comprises a large, high-conductance VTEM plate modelled at approximately 150m depth and
extending ~500m along strike. While no surface copper was observed, two independent vectors li�
confidence: (1) the “Zinc Bush” termed by Litchfield Minerals, a geobotanical indicator, seen by our
team onlyoverCu–Znmineralisa�onat theOonagalabiprospect, and(2) confirma�on that thearea sits
within the mineralised horizon. The scale and conductance of the plate, together with these vectors,
elevate VT2 as a high-priority blind sulphide target.
Bomb Diggity Cluster – Scale Expansion
At the Bomb Diggity cluster of VTEM conductors, ground truthing has confirmed the presence of
exposed Oonagalabi Forma�on that has not been previously iden�fied or mapped (Figure 3). This
observa�on has added a further 1km of strike to the Oonagalabi system. We es�mate the outcropping
mineralisa�on comprises massive anthophyllite (98%), malachite and disseminated chalcopyrite (2%).
This points to a system much larger than historically recognised and not constrained by earlier fault
interpreta�ons. Stronger altera�on than the previously drilled main outcrop and surface copper
support this corridor as a poten�al major structural and mineralising control, coincident with high
magne�c and gravity features.
Figure 3. Outcropping anthophyllite – malachite mineralised Oonagalabi Formation found at one of the weaker
VTEM anomalies at the Bomb Diggity cluster (486646E, 7442849N).
VTEM Conductor 6
The VTEM Conductor VT6 appears to be a blind target. Importantly, we also noted the ‘Zinc Bush’ over
the conductor, however, this area is on top of the steepest, highest terrain in the area (1,130m RL), so
we are unlikely to drill test this site un l we first have success lower down at the newly iden fied
targets men oned above.
Access /Drill-readiness
Key to any drilling program is logis�cs and access tracks, which the recent field work focussed on
dr-risking. We now expect to get earth moving machinery into VTEM 1, VTEM 2 and the Bomb
Diggity cluster in early September, enabling a mul�-targetRCprogram, subject to funding.
ProjectRefresher-LeaseEL32279
Oonagalabi is a large, mineralised outcrop (+3km) which has drilled significant copper, zinc intercepts,
and sits in a highly prospec�ve structural se�ng, northeast of Alice Springs where deep crustal
architecture and con�nental-scale gravity lineaments intersect, features commonly associated
with Tier-1systems (Figure 4).
Geoscience Australia’s IOCG prospec�vity mapping classifies the broader Oonagalabi area as having
moderate IOCG poten�al, reflec�ng favourable metal sources, fluid pathways and deposi�onal
traps near the Irindina–Aileron Province boundary (Clou�er et al 2025., Iron oxide copper–gold
poten�al of Australia using a hybrid data- and knowledge-driven approach and its implica�ons for the
forma�on of IOCG mineral systems, Ore Geology Reviews Volume 185, October 2025, 106802). This
combina�on of architecture and posi�on is a key reason we’re inves�ng explora�on dollars heree.
Within this corridor, mineralisa�on at Oonagalabi is focused in the Oonagalabi Forma�on (marble,
calc-silicates, garnet–quartzite). Our recent geophysics and mapping highlight
mul�ple conduc�ve/chargeable targets along this prospec�ve horizon, consistent with a large,
mineralised footprint where high-grade lenses may be focused by structures and intrusive-related
altera�on.
Figure 4. Overlay of the CSIRO IOCG prospectivity map and Continental scale gravity lineaments, highlighting
Oonagalabi’s location in this structural framework
BombDiggitytargetExplained
Bomb Diggity is the nickname for a large +1km long and deep, ‘blind’, pipe-like magne�c body located
~900m northeast of the main Oonagalabi outcrop, posi�oned on the Irindina–Aileron tectonic
contact (Figure5).
Ground gravity has defined three coincident density anomalies adjacent to this magne�c feature,
together indica�ng a poten�ally significant intrusive/altera�on centre that could act as a
heat/metal/fluid source for Oonagalabi (or represent a younger, related event).
This thesis is supported by recent drilling at Oonagalabi of a modelled magne�c structure we interpret
as related to Bomb Diggity. This hole intersected magne�te–Bi–Au–Ag mineralisa�on consistent with a
proximal intrusive-related overprint, appearing different to other mineralisa�on drilled in the
Oonagalabi forma�on.
OGRC002 returned 15 m @0.45 g/t Au,0.17% Bi,1.09g/t Ag, including 1 m @ 2.86 g/t Au, 0.84% Bi
and 1 m @1.62 g/tAu,0.58%Bi, which we interpret as vectors toward the Bomb Diggity source.
The presence of VTEM conductors beside the Bomb Diggity magne�c body strengthens the
interpreta�on that this structure could host sulphide mineralisa�on; if confirmed by drilling, it
would indicate meaningful tonnage poten�al.
Figure5.Showsthe“BombDiggitymagneticanomaly”inredpolygons(+>0.022mesh),OGRC002highlightswhere
thecompanyinterceptedthegoldandbismuthinamagnetic finger,whichisinterpretedasbeingpartof,anddistal
to, the Bomb Diggity magnetic anomaly. The blue line indicates the interpreted fluid flow direction from Bomb
Diggity into Oonagalabi.
Next Steps
• Mobilisa�on of earthmoving equipment in early September to prepare drill pads and access
tracks.
• RCdrillingprogramtocommencemid-September,star�ngattheBombDiggity cluster,thenthe
selected Priority 1 conductors followed by tes�ng of poten�al Au-Bi-Ag zones at Oonagalabi.
• Case all VTEM RC holes for down-hole EM to refine conductor geometry and vectors to
sulphides.
• Ongoing updates as results from drilling and assays become available.
Cautionary Statement
This announcement contains forward-looking statements that involve known and unknown risks,
uncertainties, and other factors that may cause actual results, performance, or achievements to differ
materially from those expressed or implied. Such statements include but are not limited to,
interpretations of geophysical data, planned exploration activities, and potential mineralisation
outcomes. Visual es�mates of mineral abundance should never be considered a proxy orsubs�tute for
laboratoryanalyseswhereconcentra�onsofgradesarethefactorsofprincipaleconomicinterest.Visual
es�matesalsopoten�allyprovidenoinforma�onregardingimpuri�esordeleteriousphysicalproper�es
relevant to valua�on. Forward-looking statements are based on Litchfield Minerals Limited’s current
expectations, beliefs, and assumptions, which are subject to change in light of new information, future
events, and market conditions. While the Company believes that such expectations and assumptions
are reasonable, they are inherently subject to business, geological, regulatory, and operational risks.
Further work, including drilling, is required to determine the economic significance of any anomalies
identified. Investors should not place undue reliance on forward-looking statements. Litchfield
MineralsLimited disclaimsany obligation to update orrevise any forward-lookingstatements toreflect
events or circumstances after the date of this announcement, except as required by law.
About Litchfield Minerals
Litchfield Minerals is a cri�cal mineral explorer, primarily searching for base metals and uranium out of
the Northern Territory of Australia. Our mission is to be a pioneering copper explora�on company
commited to delivering cost-effec�ve, innova�ve and sustainable explora�on solu�ons. We aim to
unlock thefullpoten�alofcopperandothermineralresources whileminimisingenvironmentalimpact,
ensuring the longevity andaffordability of this essen�al metalforfuture genera�ons. We are dedicated
to involving cu�ng-edge technology, responsible prac�ces and stakeholder collabora�on drives us to
con�nuously redefine the industry standards and deliver value to our investors, communi�es and the
world.
The announcement has been approved by the Board of Directors.
For further informa�on please contact:
Mathew Pustahya
Mathew@litchfieldminerals.com.au
Follow us on:
www.litchfieldminerals.com.au
htps://twiter.com/Litchfield_LMS
htps://www.linkedin.com/company/litchfield-minerals-limited/
Competent Person’s Statement
The informa�on in this announcement relates to Explora�on Results and is based on, and fairly
represents, informa�on and suppor�ng documenta�on compiled by Mr Russell Dow (MSc, BSc Hons
Geology), a Competent Person who is a Member of the Australian Ins�tute of Mining and Metallurgy
(AUSIMM) and is a full-�me employee of Litchfield Minerals Limited. Mr Dow has sufficient sampling
experience that is relevant to the style of mineralisa�on and types of deposits under considera�on and
to the ac�vity being undertaken to qualify as a Competent Person as defined in the 2012 Edi�on of the
“Australasian Code for Repor�ng of Explora�on Results, Mineral Resources and Ore Reserves” (JORC
Code). MrDowconsentstothe inclusioninthePublic Report ofthematersbasedon theirinforma�on
in the form and context in which it appears. With regard to the Company’s ASX Announcements
referenced in the aboveAnnouncement, the Companyis notaware of any new informa�on or datathat
materially affects the informa�on included in the Announcements.
JORC Code, 2012 Edi�on – Table 1 report
Sec�on 1 Sampling Techniques and Data
(Criteria in this sec�on apply to all succeeding sec�ons.)
Criteria JORC Code explana�on Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard measurement
tools appropriate to the minerals under investigation, such
as down hole gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as limiting the
broad meaning of sampling.
• Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of mineralisation that are
Material to the Public Report.
• In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as where
The instruments and parameters used for the VTEM survey are as
follow:
• The VTEM survey was flown by UTS Geophysics Pty. Ltd.
• Heliborne electromagne�c data was acquired with VTEMTM
Max transmiter frequency of 25Hz, loop diameter 35m and
mean terrain clearance height of 35m.
• Line spacing was 200m across the full survey area with the
central 40% of the survey also flown at 100m.
• Three-dimensional plate modelling of VTEM preliminary
data was Kate Hine at Mitre Geophysics.
• VTEM anomalies were modelled with industry standard
Maxwell EM so�ware – u�lizing thin conductor plate
scenarios for various, most relevant EM channel windows.
VTEM final data was imported into Maxwell EM so�ware
using Geoso�/oasis database files. Resultant model
scenarios for each of the five areas were exported to both
Criteria JORC Code explana�on Commentary
there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of detailed
information.
3D DFX and GIS plan view formats to aid follow-up ground
EM op�miza�on and considera�on.
• Rockchipsampleswerecollectedbyselec�ngmul�plesmall
chips from each outcrop to produce a representa�ve
sample.
• The pXRF was used to assess mul�ple data points on each
rock chip sample.
Drilling
techniques
• Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (e.g.
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc).
• No new drilling is reported.
Drill sample
recovery
• Method of recording and assessing core and chip sample
recoveries and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
• No new drilling is reported.
Logging • Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
• No new drilling is reported.
• Detailed field notes were collected for each rock chip
sample.
Criteria JORC Code explana�on Commentary
• Whether logging isqualitativeorquantitativeinnature.Core
(or costean, channel, etc) photography.
• The total length and percentage of the relevant intersections
logged.
Sub-
sampling
techniques
and sample
prepara�on
• If core, whether cut or sawn and whether quarter, half or all
core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc
and whether sampled wet or dry.
• Forallsampletypes,thenature,qualityandappropriateness
of the sample preparation technique.
• Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
• Measurestakentoensurethatthesamplingisrepresentative
of thein situ material collected, including for instance results
for field duplicate/second-half sampling.
• Whether samplesizes areappropriatetothegrainsizeof the
material being sampled.
• No new drilling is reported.
• No rock chip sub-sampling was conducted.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.
• Transmiter loop diameter: 35m
• Peak dipole moment – 700,000 NIA
• Transmiter Pulse Width – 7ms
• VTEM Max Receiver – Z, X coils (Y op�onal)
• pXRF machine is calibrated regularly and field standards are
used at the beginning and end of each sample run. XRF
Criteria JORC Code explana�on Commentary
• Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (i.e. lack of bias)
and precision have been established.
results are indica�ve only and are not a subs�tute for
laboratory assays.
Verifica�on
of sampling
and assaying
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primarydata,data entryprocedures,data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Data detailed in this report has been reviewed and
processed by Mitre Geophysics.
Loca�on of
data points
• Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings and
other locations used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• The naviga�on system used was a UTS PC104 based
naviga�on system u�lizing a NovAtel WAAS (Wide Area
Augmenta�on System) enabled GPS receiver, UTS navigate
so�ware, a full screen display with controls in front of the
pilot to direct the flight and a NovAtel GPS antenna
mounted on the helicopter tail. As many as 11 GPS and
two WAAS satellites may be monitored at any one �me.
The posi�onal accuracy or circular error probability (CEP) is
1.8m, with WAAS ac�ve, it is 1.0m. The co-ordinates of the
block were set-up prior to the survey and the informa�on
was fed into the airborne naviga�on system.
• Al�tudecontrolusedtheFreeFlightSystemsTRA-3000radar
al�meter with al�tude range (40 to 2500�), al�tude
Criteria JORC Code explana�on Commentary
accuracy(40to100 �.±5�.,100 to500 �.±5%,500 to2500
�. ±7%) and sample rate of 10Hz.
• Co-ordinates are in GDA94 datum, Zone 53.
• AhandheldGPSwasusedrockchipsampleloca�ons withan
accuracy of ±3m.
Data spacing
and
distribu�on
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• The full EL 32279 was flown at 200m line-spacing with a
central 40% of the survey flown at 100m infill line-spacing.
Orienta�on
of data in
rela�on to
geological
structure
• Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this
is known, considering the deposit type.
• If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
haveintroducedasamplingbias,thisshouldbeassessedand
reported if material.
• Flight lines were orientated northwest - southeast to run
perpendicular to most of the structures and geology of the
area.
Sample
security
• The measures taken to ensure sample security. • All data was collected under strict security measure by UTS
Geophysics Pty Ltd.
Audits or
reviews
• The results of any audits or reviews of sampling techniques
and data.
• Data checks and processing reviews were undertaken daily
and at the comple�on of the program by the contractor.
Criteria JORC Code explana�on Commentary
• Review of the data was undertaken by an independent
consultant Mitre Geophysics.
JORC Code, 2012 Edi�on – Table 1 report
Sec�on 2 Repor�ng of Explora�on Results
(Criteria listed in the preceding
sec�on also apply to this sec�on.)
Criteria JORC Code explana�on Commentary
Mineral
tenement
and land
tenurestatus
• Type, reference name/number, location and ownership
including agreements or material issues with third parties
such as joint ventures, partnerships, overriding royalties,
native title interests, historical sites, wilderness or national
park and environmental settings.
• The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to
operate in the area.
• Tenement includes Oonagalabi (EL32279) for a total of
145.3km2 and 46 sub-blocks.
• EL32279 is owned by Kalk Explora�on Pty. Ltd., a 100%
owneden�tyof LitchfieldMinerals Limited. Thetenement is
located approximately 125km northeast of Alice Springs on
pastoral leases.
• The tenement is in good standing and there are no known
impediments.
Explora�on
done by
other par�es
• Acknowledgment and appraisal of exploration by other
parties.
• A summary of previous EL32279 explora�on and mining is
presented below:
• Oonagalabi was discovered in the 1930’s.
• In 1970, Russgar Minerals completed regional mag-rad
survey, VLF_EM survey, ground magne�c survey, single line
resis�vity traverse and 14 drillholes.
• In 1971, Geopeko completed limited IP.
• 1979, Amoco completed photo-interpreta�on, rock chip
sampling and drilling (8 holes).
• 1981 D’Dor Mining NL completed limited dipole-dipole IP.
• Between 1990 – 1996 on EL 6940 Clarence River Finance
Group explored for garnet in the Florence and Maud Creeks,
collec�ng 15 samples that averaged 4.4% garnet
Criteria JORC Code explana�on Commentary
• Between 1997 – 2000 on EL 9420 Clarence River Finance
Group completed garnet explora�on north of Oonagalabi
EL32279. In 2007, ML 22624 was applied for to cover the
centralOonagalabidepositandsurroundingproximalalluvial
systems (outside 2025 bulk sampling area). No work was
completed and the ML was relinquished in 2019.
• Silex 2009 completed pole-dipole IP 1 x diamond hole.
Geology • Deposit type, geological setting and style of mineralisation. • The Oonagalabi-type mineralisa�on is considered to be
either skarn-related, sediment-hosted or carbonate
replacement with poten�al for high-grade remobilised
breccia zones similar to the Jervois deposit. EL32279 falls
within one of Geoscience Australia’s IOCG high poten�al
zones.
• The project lies within the Harts Range that represents a
package of mul�ply deformed and metamorphosed
sedimentary and igneous intrusive rock.
Drill hole
Informa�on
• A summary of all information material to the understanding
of the exploration results including a tabulation of the
following information for all Material drill holes:
o easting and northing of the drill hole collar
• No new drilling reported.
Criteria JORC Code explana�on Commentary
o elevation or RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• Iftheexclusionofthisinformationisjustifiedonthebasisthat
the information is not Material and this exclusion does not
detract fromtheunderstandingof thereport,theCompetent
Person should clearly explain why this is the case.
Data
aggrega�on
methods
• In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations
(e.g. cutting of high grades) and cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts incorporate short lengths of
high grade results and longer lengths of low grade results,
the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be
shown in detail.
• The assumptions used for any reporting of metal equivalent
values should be clearly stated.
• No aggrega�on methods were used.
Rela�onship
between
mineralisa�o
n widths and
• These relationships are particularly important in the
reporting of Exploration Results.
• If the geometry of the mineralisation with respect to the drill
hole angle is known, its nature should be reported.
• No drilling results reported. .
Criteria JORC Code explana�on Commentary
intercept
lengths
• If it is not known and only the down hole lengths are
reported,thereshouldbeaclearstatementtothiseffect(e.g.
‘down hole length, true width not known’).
Diagrams • Appropriate maps and sections (with scales) and tabulations
of intercepts should be included for any significant discovery
being reported These should include, but not be limited to a
plan view of drill hole collar locations and appropriate
sectional views.
• See figures within the main body of the announcement.
Balanced
repor�ng
• Where comprehensive reporting of all Exploration Results is
not practicable, representative reporting of both low and
high grades and/or widths should be practiced to avoid
misleading reporting of Exploration Results.
• All available relevant informa�on is presented.
Other
substan�ve
explora�on
data
• Otherexplorationdata,ifmeaningfulandmaterial,shouldbe
reported including (but not limited to): geological
observations;geophysicalsurveyresults;geochemicalsurvey
results; bulk samples – size and method of treatment;
metallurgical test results; bulk density, groundwater,
geotechnical and rock characteristics; potential deleterious
or contaminating substances.
• See the main body of this report for all per�nent
observa�ons and interpreta�ons.
• The occurrence of the so-called “Zinc Bush” plants, so
termed by Litchfield Minerals, appears to act as
geobotanical indicator in this area. Before VTEM ground-
truthing, the ‘zinc bush’ had only been observed on
mineralised outcropping Oonagalabi Forma�on.
Further work • The nature and scale of planned further work (e.g. tests for
lateral extensions or depth extensions or large-scale step-out
drilling).
Future planned explora�on includes:
• Field valida�on of Priority 1 conductors
• Earthworks for drillhole pads and tracks
Criteria JORC Code explana�on Commentary
• Diagrams clearly highlighting the areas of possible
extensions,including themain geologicalinterpretationsand
future drilling areas, provided this information is not
commercially sensitive.
• RC drilling of priority conductors, gold targets and the Bomb
Diggity magne�c anomaly.
Share your feedback