Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX Announcement | 28thth April 2025
QUARTERLY ACTIVITIES REPORT.
Highlights
• Oonagalabi Sentinel Hyperspectral analysis: Gas anomalies (CO₂, CH₄, O₂) correlate with
known mineralised zones and support target generation in structurally complex zones to the
northeast.
• Oonagalabi 50m Mag Drone survey: Mag survey confirmed an area of high magnetism within
the Oonagalabi deposit, highlighting possible links to an interpreted intrusion 900m to the
northeast.
• Oonagalabi Soil & Rock chip Survey: The December 2024 surface sampling revealed strong
copper-zinc anomalies extending the system to over 3km long and 1km wide.
• OonagalabiIPSurvey:InducedPolarisation(IP)surveysconfirmedtwolarge,high-chargeability
anomalies over 1km in length and 500m in depth, highlighting potential for significant high-
grade sulphide mineralisation.
• StrategicDrillforEquityAgreement:Partnership established withBullion Drilling at favourable
equity terms, facilitating aggressive exploration with reduced capital expenditure.
• OonagalabiDrilling:Allsixdrillholesintersectedvisiblesulphidemineralisation,withdownhole
intervals ranging from 20m to 150m, confirming the continuity of mineralisation over a 1.5km
strike length.
During the March 2025 quarter, Litchfield Minerals Limited ("Litchfield" or "the Company") advanced
explorationatitsflagshipOonagalabiProjectintheNorthernTerritory,achievinganumberofsignificant
technical and operational milestones. These activities confirmed the presence of a potentially large,
polymetallic sulphide system with considerable scale (announced 11th
April 2025). Further work is
needed within the planned phase two drilling to identify potential feeder structures to the system,
interpretation of the northeast intrusion and what the economic significance is of any of the anomalies
that have been identified.
Managing Director and CEO, Matthew Pustahya, commented:
“I am extremely proud of the Litchfield team’s performance over the last quarter. We have
demonstrated to both ourselves and the market that we can deliver on our company’s strategy —
identifyingundervaluedassets,applyingrapidexploration,anddeliveringimpactfuldrillcampaigns. The
acquisition of Oonagalabi exemplifies our strategic approach as we took on a historically complex asset,
swiftly advanced the exploration model with minimal capital expenditure and significantly enhanced its
value.
We are excited by the results of our maiden drill program at Oonagalabi. Intersecting mineralisation in
every drill hole, including previously untested zones, confirming the scale and fertility of the system.
Our integrated targeting approach has been technically validated, and we're just beginning to unlock
the potential of what we believe could become a significant polymetallic system in Australia.
We look forward to delivering a robust Phase Two exploration programme in the coming months. This
next phase aims to identify feeder structures within the Oonagalabi deposit and thoroughly evaluate
and test the intrusive unit situated northeast of the main mineralised system.”
Project Updates
Sentinel Hyperspectral Analysis, 50m Aeromagnetic survey and 3D reinterpretation of historical IP
In January, the reprocessing of historical 2008 IP data alongside new drone magnetic surveys and
Sentinel-2 hyperspectral analysis provided substantial improvements in geological understanding of
Oonagalabi. This integrated approach confirmed the presence of a significant, steeply plunging, east-
oriented pipe-like structure, potentially associated with a large intrusive source to the northeast.
Sentinel-2 hyperspectral analysis identified gas anomalies correlated with mineralised outcrops,
providing further sophisticated targeting vectors for exploration (Figure 1). Collectively, these
techniques havesubstantially refined the geological model, enhancing the targeting accuracy for future
exploration phases.
• Historical IP data reprocessing confirmed significant structures.
• Drone magnetics identified potential intrusive sources.
• Hyperspectral data refined targeting vectors.
Figure 1 - Combined gas targets identified from spectral analysis of Sentinel-2 data, showing multiple
targets to the northeast and southeast of the Oonagalabi Prospect (OBMP = Oonagalabi)
GeochemistrySignificantlyExpandsKnownOonagalabiMineralisation(announced29January2025)
Surface geochemical sampling completed in December 2024 significantly extended the known
mineralised footprint at Oonagalabi, now exceeding 3km in length and potentially 1km in width. High-
grade soil and rock chip assays were returned from previously untested areas such as Silverado and
newly identified zones to the southeast, highlighting significant zinc and copper mineralisation, along
withnotablesilverandgoldanomalies(Figure2). Additionally,thesamplingidentifiedcriticalpathfinder
elementsincludingBi,Cd,In,Sn,W,Co,Li,Mo,andV,whichprovidedcrucialdatatorefineandenhance
futuretargetingefforts. Theseresultsreinforcedtheconsiderablescaleandexplorationpotentialofthe
Oonagalabi system.
• Geochemical footprint extended beyond 3km strike.
• High-grade assays from new exploration areas.
• Enhanced pathfinder geochemical targeting
Figure 2 - Oonagalabi with highlighting both new and old copper, zinc soils and rock sample grades.
Discovery of High-Chargeability Targets at Oonagalabi (announced 5 March 2025)
This quarter marked a pivotal moment for the Oonagalabi Project, with significant discoveries resulting
from advanced Induced Polarisation (IP) geophysical surveys (Figure 3). These surveys identified two
substantialandpreviouslyuntestedchargeabilityanomalies,eachextendingmorethan1kmalongstrike
and reaching depths exceeding 500m. Chargeability values peaked notably high, up to 60mV/V,
indicating strong potential for substantial sulphide mineralisation. Additionally, these geophysical
anomalies correlate with a significant 3km-long soil geochemical anomaly. Geological interpretations
suggest the system is part of a potentially large skarn deposit driven by a newly identified intrusive
source northeast of the known mineralisation. To rapidly test these findings, Litchfield entered into a
strategic drill-for-equity partnership with Bullion Drilling, minimising financial dilution while maximising
exploration capability.
• IP identified two large anomalies up to 60mV/V.
• 3km soil geochemical anomaly correlation.
• Potential large skarn system identified.
• Strategic partnership with Bullion Drilling secured.
Figure 3 -Pole-Dipole IP chargeable anomaly: double stacked, +1km strike, +500m deep, +20mV/V
Drill for Equity agreement executed with Bullion Drilling
To fast-track exploration while minimising shareholder dilution, Litchfield secured a drilling-for-equity
partnership with Bullion Drilling, one of Australia’s leading RC drillers. Under this agreement:
• Bullion Drilling would complete up to 2,000m of RC drilling for 50% equity.
• Litchfield will pay 50% of drilling costs in fully paid shares, preserving cash for further
exploration.
• Equity of up to$300,000 at12c per share, representinga 26% premium to the day4th
of March
closing price. This agreement reflects strong industry confidence in Oonagalabi potential and
allows Litchfield to rapidly advance the project with minimal financial outlay.
Commencement of Oonagalabi Drilling Programme (announced 27 March 2025)
In late March, Litchfield Minerals successfully commenced its drilling programme after securing all
necessary regulatory approvals from Northern Territory authorities. The programme was specifically
designed to test the highest priority geophysical targets identified by earlier surveys, comprising six
strategically positioned RC drill holes (Figure 4). Five of these holes targeted the substantial western
high-chargeability anomaly, while one hole tested a newly defined eastern anomaly. Drill spacing was
carefully set at 150m to thoroughly evaluate and demonstrate the scale and mineralisation potential of
the targeted zones, particularly focusing on the previously undrilled core chargeability zones.
• All regulatory approvals secured with no objections or queries.
• Six-hole RC drilling programme initiated.
• Drilling targeted high-chargeability zones with strategic 150m spacing.
Figure 4 – Hole 5, View looking northeast.
Oonagalabi Drilling Confirms Extensive Sulphide Mineralisation (announced 11 April 2025)
The Phase 1 RC drilling program successfully concluded in early April, drilling a total of 1,646m across
six holes (Table 1). Impressively, visual sulphide mineralisation was intersected in every drill hole,
validating the accuracy and effectiveness of Litchfield’s exploration model and targeting strategy.
Detailedgeologicalloggingconfirmedthepresenceofarobustpolymetallicsulphidesystem,comprising
chalcopyrite, sphalerite, galena, pyrrhotite, and pyrite. Importantly, the drilling significantly expanded
the known mineralisation footprint on both the eastern and western flanks of the Oonagalabi system,
with mineralised intervals ranging from 20m to 150m. Preliminary portable XRF analysis has indicated
elevated cobalt and bismuth levels, hinting at the possibility of multiple mineralisation events and
reinforcing the need for additional geophysical surveys (VTEM and ground gravity) to define potential
high-grade feeder structures.
• 1,646m drilled with 100% mineralisation intersection success for each hole.
• Confirmed presence of a polymetallic sulphide system.
• Expanded known mineralisation envelope significantly.
• Preliminary data suggests potential multiple mineralisation events.
Table 1. Completed Phase 1 RC drillholes.
Upcoming planned 2025 Activities:
• VTEM, Gravity and second phase of drilling for the Oonagalabi Project.
• Mount Doreen Drilling – Mount Irene, Patmungula and Dumunzi.
• Lucy Creek exploration – Mapping, geochemistry and sampling.
Ongoing Exploration Funding
Litchfield Minerals will require additional funding to support a successful 2025 exploration campaign.
The Board is currently evaluating the most suitable financing options for both shareholders and the
company, with a decision expected in the coming weeks.
CORPORATE
Cash Position
As at 31 March 2025, the Company held $1.1 million cash at bank (unaudited).
Capital Structure
Asat31Marach2025,theCompanyhas35,403,845sharesonissue,ofwhich7,192,500shares
are escrowed till 13/03/2026.
There are 7,000,000 performance rights on issue, 1,750,000 performance rights each to the
directors and the CFO/Company Secretary.
There are 9,200,000 unlisted options on issue, of which 8,200,000 are subject to escrowed for
24 months from official quotation.
ASX Listing Rule 5.3.1 Disclosure
$0.389 million exploration spend during the quarter can be summarised as:
● $0.330 million exploration activities on Oonagalabi;
Hole_ID Easting Northing RL Dip AZI_TN AZI_MAG Depth
OGRC001 485069 7442172 813 -60 148 142 200
OGRC002 485143 7442333 803 -55 148 142 246
OGRC003 485351 7442314 819 -55 310 304 300
OGRC004 485552 7442532 848 -70 148 142 300
OGRC005 485402 7442483 851 -80 148 142 300
OGRC006 485513 7442419 835 -60 148 142 300
● $0.035 million tenement management activities; and
● $0.025 million on general exploration activities.
ASX Listing Rule 5.3.2
The Company confirms that there was no mine production and development activities for the
Quarter.
ASX Listing Rule 5.3.4
The Company provides a comparison of its actual spend against the estimated expenditure on
“use of funds” items set out in the Company’s Prospectus dated 24 January 2024.
ASX Listing Rule 5.3.5
$78,000 was paid during the quarter to Related Parties, as reported in clause 6 of the ASX
Appendix 5B (Cash Flow Report), comprised director fees.
TENEMENT INTERESTS
As at 31 March 2025, the Company had interest in the following tenements (as required by
Listing Rule 5.3.3). During this quarter, no additional tenement has been acquired nor any
tenement removed from the company’s portfolio.
Country Location Project Tenement Status Current
Interest (%)
Australia Northern Territory Mount Doreen EL31305 Granted 100%
Australia Northern Territory Lucy Creek EL33568 Granted 100%
Australia Northern Territory Oonagalabi EL32279 Granted 100%
Australia Northern Territory Paradise Well EL32190 Granted 100%
Australia Northern Territory Silver Valley EL32241 Granted 100%
Australia Northern Territory Lucy Creek 2 ELA 33888 Application 100%
Australia Northern Territory Yambah ELA 33889 Application 100%
Funds Allocated Actualto date
$'000 $'000
ExplorationDrilling 2,424 1,632
Geophysics, Mapping, Sample Analysis, Vehicles and Tenement
Cost
689 1,097
Operational Labour - Exploration 324 210
WorkingCapital andAdministration 1,563 963
Use of Funds
Cautionary Statement
The information in this announcement relating to mineral exploration results, sampling, geophysical
data, drilling results, and Exploration Targets is preliminary and conceptual in nature. Interpretations,
estimates, and conclusions are based on current data and geological understanding, which may change
as additional information becomes available. There is no certainty that further exploration will lead to
the identification of a mineral deposit or to any commercial development.
All statements, other than statements of historical fact, included in this announcement — including
statementsregardingfutureexplorationactivities,targets,andcompanystrategy—areforward-looking
statements. These forward-looking statements involve known and unknown risks, uncertainties, and
other factors that may cause actual results, performance, or achievements to differ materially from
thoseanticipated. Suchfactorsmayincludechangesinexplorationresults,projectpriorities,regulatory
conditions and other risks inherent to mineral exploration.
Readers are cautioned not to place undue reliance on forward-looking statements or Exploration
Targets. The Company is under no obligation to update any forward-looking statements or information
in this announcement, except as required by applicable laws or the ASX Listing Rules. All technical
information contained in this release is based on information compiled by qualified and competent
professionals as defined under the JORC Code (2012 Edition).
Forward looking statement
This announcement may include forward-looking statements, which are subject to risks and
uncertainties. Actual results could differ significantly due to factors beyond our control,
including market conditions and industry-specific risks. These forward-looking statements are
based on the Company’s expectations and beliefs concerning future events. No warranty is
given regarding the completeness of the information provided. Please avoid placing undue
reliance on forward-looking statements, as they reflect views only as of the announcement
date.
About Litchfield Minerals
LitchfieldMineralsisacriticalmineralexplorer,primarilysearchingforbasemetalsanduranium
out of theNorthernTerritoryofAustralia. Our missionis tobeapioneeringcopperexploration
company committed to delivering cost-effective, innovative and sustainable exploration
solutions. We aim to unlock the full potential of copper and other mineral resources while
minimising environmental impact, ensuring the longevity and affordability of this essential
metal for future generations. We are dedicated to involving cutting-edge technology,
responsible practices and stakeholder collaboration drives us to continuously redefine the
industry standards and deliver value to our investors, communities and the world.
The announcement has been approved by the Board of Directors.
For further information please contact:
Matthew Pustahya
Matthew@litchfieldminerals.com.au
Follow us on:
www.litchfieldminerals.com.au
https://twitter.com/Litchfield_LMS
https://www.linkedin.com/company/litchfield-minerals-limited/
Competent Person’s Statement
The information in this Presentation that relates to Exploration Results is based on, and fairly
represents, information and supporting documentation compiled by Mr Russell Dow (MSc,
BScHons Geology), a Competent Person who is a Member of the Australian Institute of Mining
and Metallurgy (AUSIMM) and is a full-time employee of Litchfield Minerals Limited. Mr Dow
has sufficient experience that is relevant to the style of mineralisation and types of deposits
under consideration and to the activity being undertaken to qualify as a Competent Person as
defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves” (JORC Code). Mr Dow consents to the inclusion in the
report of the matters based on his information in the form and context in which it appears.
With regard to the Company’s ASX Announcements referenced in the above Announcement,
the Company is not aware of any new information or data that materially affects the
information included in the Announcements.
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Litchfield Minerals Limited
ABN Quarter ended (“current quarter”)
33 612 660 429 March 2025
Consolidated statement of cash flows Current quarter
$A’000
Year to date (9
months)
$A’000
1. Cash flows from operating activities
1.1 Receipts from customers
1.2 Payments for
(a) exploration & evaluation
(b) development
(c) production
(d) staff costs
(e) administration and corporate costs (92) (266)
1.3 Dividends received (see note 3)
1.4 Interest received
1.5 Interest and other costs of finance paid (1) (1)
1.6 Income taxes paid
1.7 Government grants and tax incentives 41 82
1.8 Other (provide details if material)
1.9 Net cash from / (used in) operating
activities
(52) (184)
2. Cash flows from investing activities
2.1 Payments to acquire or for:
(a) entities
(b) tenements
(c) property, plant and equipment (22) (23)
(d) exploration & evaluation (389) (2,503)
(e) investments
(f) other non-current assets (21) (14)
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (9
months)
$A’000
2.2 Proceeds from the disposal of:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) investments
(e) other non-current assets
2.3 Cash flows from loans to other entities
2.4 Dividends received (see note 3)
2.5 Other (provide details if material)
2.6 Net cash from / (used in) investing
activities
(432) (2,539)
3. Cash flows from financing activities
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
3.3 Proceeds from exercise of options
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
3.5 Proceeds from borrowings
3.6 Repayment of borrowings
3.7 Transaction costs related to loans and
borrowings
3.8 Dividends paid
3.9 Other (provide details if material)
3.10 Net cash from / (used in) financing
activities
- -
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
1,584 3,824
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(52) (184)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(432) (2,539)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
- -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (9
months)
$A’000
4.5 Effect of movement in exchange rates on
cash held
- -
4.6 Cash and cash equivalents at end of
period
1,101 1,101
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 1,101 1,584
5.2 Call deposits
5.3 Bank overdrafts
5.4 Other (provide details)
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,101 1,584
6. Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
78
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 4
+ See chapter 19 of the ASX Listing Rules for defined terms.
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities
7.2 Credit standby arrangements
7.3 Other (please specify)
7.4 Total financing facilities
7.5 Unused financing facilities available at quarter end
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.9) (52)
8.2 (Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(389)
8.3 Total relevant outgoings (item 8.1 + item 8.2) (441)
8.4 Cash and cash equivalents at quarter end (item 4.6) 1,101
8.5 Unused finance facilities available at quarter end (item 7.5) -
8.6 Total available funding (item 8.4 + item 8.5) 1,101
8.7 Estimated quarters of funding available (item 8.6 divided by
item 8.3)
2.5
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A.
8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 5
+ See chapter 19 of the ASX Listing Rules for defined terms.
8.8.3 Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1 This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2 This statement gives a true and fair view of the matters disclosed.
Date: ................28 April 2025...................................................................
Authorised by: ................By the Board...................................................................
(Name of body or officer authorising release – see note 4)
Notes
1. This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2. If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4. If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5. If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.
Share your feedback
Discover