Drilling confirms massive base metal sulphides, West Arunta
Released
Released
Announcement PDF
1 | P a g e
ASX Announcement| 15th
August, 2024
DRILLINGCONFIRMSMASSIVEBASEMETALSULPHIDES AT THEMT DOREEN PROJECT,
WEST ARUNTA
Highlights
• Massive base metal sulphides intersected in LMRD004 from our Silver King project area
with interceptsof:
o 17m @ 2.47% Pb, 1.06% Zn, 15.7 g/t Ag from 49m, including 3m @ 11.84% Pb,
5.62% Zn, 0.1%Cu, 57.1g/tAgfrom 51m (refertoFigure1).
o 33m@0.57%Zn,0.28%Pb,1.9g/tAgfrom0m,including7m@1.48%Zn,0.6%
Pb, 3.0g/t Agfrom 25m.
• The widespread distribution of sulphides throughout all four of the diamond holes
at Silver King shows that this and other areas within the Mount Doreen tenement are
fertile withpotential todemonstrate scale andhigher-grade mineralisation.
• The discovery of massive sulphides in several of the Silver King drill holes is a
highly encouragingsignaswepreparefortheupcomingtenement-wideVTEMsurveyin
August.This advanced electromagnetic technique is specifically designed to detect
massive sulphides,making these initialfindingsparticularlypromising.
• Ten additional holes are reported in this announcement following on from the previous
reporting ofthe initialtwoholeson8th of July2024.
Litchfield Minerals Limited (“Litchfield” or the “Company”) (ASX:LMS), a company with a
strategicemphasison criticalminerals, ispleased to announce the final drilling results from the
Company’s inaugural drilling campaign at the Mt Doreen project, located in the West Arunta,
NorthernTerritory.
2 | P a g e
Figure 1. A. Diamond Drill core of LMRD004 50.4 – 53.7m, showing zones of massive sulphide
withinsilica-sericite-alteredandfoldedLanderRockFormation. B.Close-upofcutcorefromred
box in A showing massive pyrrhotite-sphalerite-chalcopyrite cut by galena-sphalerite within
strong silica-sericite-altered LanderRock Formation.
ManagingDirectorandCEO,MatthewPustahya, commented:
“The team is thrilled with the results from LMRD004 at Silver King, West Arunta, Mount Doreen.
These findings confirm our long-held belief that the Mount Doreen project is fertile, with the
potentialtogenerate high-grade polymetallicsystems.
Our current priority is to identify broader areas of sulphide distribution and potential trap sites
within both the Silver King area and Mount Doreen tenement package. To accelerate ground
validation, we have partnered with PGN Geosciences to deliver a lithostructural interpretation,
whichwillprovidecriticalinsightsintothelitho-structuralarchitectureacrosstheMountDoreen
tenement, helping uspinpointspecific explorationtargets.
In addition, we have recently completed ground gravity surveys over Patmungula and Dumunzi
(August 2024), with results expected shortly. We are also gearing up for a tenement-wide VTEM
survey starting around August 23rd, and have engaged Dr. Neil Pendock, a leading expert, to
conduct a sentinel data review. Sentinel data has historically been invaluable in mineral
exploration,offering key informationaboutsurface and subsurface conditions.
3 | P a g e
Ourteamismakingsignificantprogress,andweremaindedicatedtoexplorationexcellence.Our
strategy of continuously acquiring more data issignificantly enhancing our understanding of the
area, guiding us toward the discovery ofapotentially much largermineralizedsystem.
DrillingCampaign Summary
Litchfield's inaugural drilling campaign targeted three prospects within the Mt Doreen project
(SilverKing,MtIrene,CopperFlats,refertoFigure2)withtwelveholesforatotal1,769m(1,006m
RC, 763m DD,Table1).
Figure 2. Satellite image of the Mt Doreen project (EL31305) showing the location of the key
historicprospects, including currentdrillcollar locations.
4 | P a g e
Table1. Drillholecollar informationfrom Litchfield’s inaugural 2024drilling campaign.
Silver King
At Silver King (Figure 3), six holes were drilled (1,061.37m) comprising four RC holes with
diamond tails, a single diamond hole and a single RC hole (296.6m RC / 764.7m DD), Table 1.
Holes were designed to test the extension and geometry of base metal mineralisation beneath
exposedhistorical workings. Results for the first two Silver King holes (LMD001, LMRD002) were
previouslyreportedon 8th
of July2024.
5 | P a g e
Figure 3. SilverKing prospectshowing gradientarray IPchargeability plan,drillholelocations,
semi-coincidentmagnetic anomaly andbestmineralised intercepts.
LMRD003 was drilled to the northeast to intersect both the targets identified by the Induced
Polarisation (IP) chargeability and magnetic models (Figures 3 and 4). Drilling intersected an
identical host sequence to LMD001/LMRD002, comprising metasandstone and metasiltstones
oftheLanderRockFormation,punctuated bynarrow,coarse-grainedquartz-feldspar-muscovite
pegmatites(<1m).
Base metal sulphide mineralisation was intersected almost continuously from surface to 64.3m
(57m @ 0.32% combined Cu-Pb-Zn), comprising zones of disseminated pyrite-chalcopyrite-
sphalerite(0.5–5%totalsulphides,24–35m),pyrrhotite-sphalerite-chalcopyriteveinletcrackle
breccia (0.5 – 5% total sulphides), with associated weak to moderate pervasive wallrock
silicificationallcutby1%,late, brittle chlorite ± pyrite veins.
WithLMRD003,two coherent mineralised intervalswere intersected including:
• 5.2m@ 0.14% Cu, 0.18% Pb, 0.21% Zn,14.1g/tAgfrom 22.8m.
• 7.2m@ 0.15% Cu, 0.39% Zn, 2.4 g/tAg from 49.8m.
6 | P a g e
Figure 4. Schematic cross-section of LMRD003 (looking northwest), showing a broad interval of
combined +0.1% Cu-Pb-Zn with severalnarrowzones of elevated mineralisation.
LMRD004 was drilled through Lander Rock Formation to the south to test the coincident IP-
magneticmodels(Figures5)andintersectedthestrongestmineralisationfromthesixSilverKing
holes, including:
• 33m @0.57%Zn,0.28%Pb,1.9g/tAgfrom 0m, including:
7m @1.48%ZN, 0.6% Pb, 3.0g/tAgfrom 25m.
• 17m @2.47%Pb, 1.06%Zn, 15.9 g/tAgfrom 49mincluding:
3m @11.84%Pb, 5.62%Zn, 0.1% Cu,57.1g/tAgfrom 51mand
1m @4.5%Pb, 0.35% Zn, 0.1%Cu,90.6g/tAg from 64m.
The upper mineralised zones are associated with disseminated, veinlet and crackle breccia
sphalerite-pyrite-galena-chalcopyrite±pyrrhotite mineralisation, with weak- to moderate silica-
sericite wallrock alteration. Sulphide content varies throughout the interval but ranges from 1 –
15%sphalerite,1–4%pyriteandminortotracegalena,chalcopyrite,pyrrhotiteover1mintervals.
7 | P a g e
The lower mineralised zone is characterised by generally weak disseminated and veinlet
sulphides (<2%), with weak to moderate silica-sericite wallrock alteration, punctuated by two
narrow zones of semi-massive and massive sphalerite-galena-pyrrhotite-pyrite±chalcopyrite at
51m and 64m (Figure 1a). Mineralisation shows a complex, multi-phase paragenesis with early
massivepyrrhotite-sphalerite chalcopyrite cut by later massivegalena-sphalerite (Figure1b).
Figure 5. Schematic cross-section of LMRD004 (looking west), showing two mineralised
intervals,bothabove andbelowthe redoxzone.
In general, there is a broad correlation between observed sulphides in core and modelled
chargeability / magnetic susceptibility, indicating that these two geophysical techniques are
suitable for detecting and modelling Silver King-type mineralisation. The Pole-Dipole IP
chargeability sections, particularly at 72500mE, shows a shallow-rooted, weakly concave
geometry thatshowsa good correlation withobserved sulphidesindrill core.
Identification of massive sulphides in LMRD004 indicates that electromagnetic techniques may
also be capable of delineating Silver King-type mineralisation as was the case for the main
discovery phase attheMtHardy deposit.
8 | P a g e
Mount Hardy is located 37km east of Silver King on the eastern periphery of the Yarunganyi
Granite (1565Ma). The current Mt Hardy area hosts significant zones of semi- and massive
sulphide (e.g.; 35.54m at 14.7% Zn, 2.92% Pb, 0.91% Cu and 59 g/t Ag from 431.54m in
MHDD0043 and MHDD0031A, with 25.15m at 4.0% Zn, 3.1% Pb and 2.4% Cu from 184m,
including 9.15m at 8.8% Zn, 7.6% Pb and 4.5% Cu from 200m) and it is possible that similar
mineralisation exists on the western periphery of the Yarunganyi Granite within Litchfield’s Mt
Doreen tenement.
LMRC007 and LMRD008
LMRC007 (181m) was drilled east away from the main Silver King prospect into the interpreted
eastern extension of the main IP chargeablity anomaly and intercepted unmineralised Lander
Rock Formation. LMRD008 (261.2m) was collared 470m north of Silver King and drilled to the
south into a peripheral, low-magnitude IP chargeability anomaly. The hole was partly funded by
the Northern Territory government. This hole also drilled unmineralised Lander Rock Formation
throughout and together with LMRC007 effectively sterilised the low chargeability anomalies
surrounding the main target of the SilverKing prospect. Assay resultsforbothof these holescan
be found intheAppendixbelow.
MountIrene - LMRC009,LMRC010,LMRC011, LMRC012
At Mt Irene,four RC holeswere drilled (408m, Table 1) with, twodrilled underneath the historical
Mt Irene copper prospect (LMRC009/010). LMRC011 was drilled to target the northern Gradient
Array IP chargeability anomaly and LMRC012 was drilled to test the westerly Pole-Dipole IP
chargeability anomaly.
LMRC009 and LMRC010 (Figures 6 and 7) were both drilled to target the down-dip extension of
outcropping mineralisation at the Mt Irene prospect. Both holes intersected narrow (1 – 5m)
quartz-malachite / gossanous mineralisation in the interpreted down-dip position below small-
scale historic mining pits. Mineralisation is hosted within schistose Lander Rock Formation
within a structurally-controlled quartz vein lode. The presence of malachite and minor
gossanouszones is indicative of supergene leaching andcoppermobility.
9 | P a g e
Figure 6. Schematic cross-section of LMRC009 (looking northwest), showing the mineralised
quartz-coppercarbonatestructurebelowthehistoric MtIrenepit.
Figure 7. Schematic cross-section of LMRC010 (looking northwest), showing a broader zone of
low-level Cu-Pb-Zn anomalism surrounding a narrow, mineralised quartz-copper carbonate
structure.
10 | P a g e
LMRC011wasdrilled to test agradientarrayIPchargeabilityanomalyapproximately 450malong
strike to the northwest of the historic Mt Irene mining pits. Drilling intersected Lander Rock
Formationthroughoutwithseveralunmineralisedmilkyquartzveinsandnarrowpegmatites. The
hole was terminated before the target depth (220m) due to excessive water and limited sample
return.
LMRC012wasdrilledtotargetastrongchargeabilityanomaly(peak25mV/V,almostdoubleSilver
King,Figure8)inthesinglePole-Dipoleline. Additionallineswereplanned,however,unseasonal
heavy rainsforced the early completionoftheprogram.
The drillhole intersected Lander Rock Formation throughout that is oxidized to end of hole,
indicating a very deep weathering profile, most likely relating to a well-developed NNE-trending
structure. Unfortunately, the hole was terminated early at 162m (250m planned depth) due to
excessive water and inadequate sample return. Trace limonite and rare disseminated
chalcopyrite was observedbelow 100m,however, no +0.1%Cu-Pb-Znassayswere returned.
AdditionalPole-Dipolelinesarerequiredtorefinethegeometryofthischargeabilityanomaly. The
cause of the chargeability anomaly is still unclear, and more work is required to further
understand it.Theteamremainshighly enthusiasticaboutthisanomaly,andweareeagertosee
theresults ofthe upcoming surveys inthis area.
Figure 8. Pole-Dipole IP chargeability section 7562375mN (looking north) showing a strong
chargeabilityanomaly that wastargetedwithLMRC012.
CopperFlats
GradientarrayandPole-DipoleIPdataatWolframHillrevealedchargeabilityanomaliesthatalign
with historic workings and identified several linear trends to the east of the main mineralised
outcrops in an area with shallow alluvial and colluvial cover (Figure 9). Modelling of the Pole-
Dipole datadefined a moderately chargeable zonebeneath this cover, which also corresponded
11 | P a g e
withmagneticRTP(ReducetothePole)data. LMRC005andLMRC006weredesignedtointersect
an interpretedreef structure,however, nosignificant mineralisation wasintersected.
Figure9. Copper Flats/Wolfram HillGradientArray IPchargeability imageshowing the location
of the two Copper FlatsRC drillholes,targeting aprominentchargeabilityanomaly tothenorth
of the Wolfram HillCu-Wdeposit(Mt Doreen).
Upcoming Exploration–What’s Next
Currently, Litchfield is partnering with PGN Geoscience to develop a detailed lithostructural
interpretation for the Mount Dorrentenement (EL31305). This initiative willintegrate Litchfield’s
newly acquired aeromagnetic data (100m line-spacing, Q1 2024) with all open source
geophysical and historical exploration data to develop a fully integrated structural and
metallogenicmodelfortheproject. Thismodelwillhelpdefinevariousmineraltargetsunderthe
extensive shallow cover and willprovide aframework forLitchfield’sexplorationstrategy.
Additionally, Litchfield Minerals have contracted UTS Geophysics to complete a tenement-wide
VTEM survey in mid-August (200m line-spacing, 2,254 line km) to assess this potential of the
projecttohostsemi-tomassive-basemetalsulphidesystems. VTEMdatawillbeintegratedwith
the Mt Doreen lithostructural interpretation, which is currently being completed by PGN
12 | P a g e
Geoscience(expected lateAugustcompletion)toproducearangeofcompelling targetsthatwill
bethefocusofanaggressiveexplorationprogramthatisplannedtobecompletedbeforetheend
ofthe 2024field season.
ThisQuarter’s focus
• Lithostructural review with the intent of identifying and ranking exploration targets for
groundworkfollow-up.
• Geological mapping and geochemical sampling of the three Clark prospects with the
viewtodefining potentialdrillhole targets.
• Exploration,mapping andgeochemistry acrossthe Mount Doreen tenementpackage.
• Ground gravity workovervariousareasof Patmungala &Dumunzi.
• Review of Sentineldata.
• 200m line-spacedVTEMsurvey overEL31305.
Cautionary Note –VisualEstimatesofMineralisation
Any references tovisual results above, are based on observations only. These visual estimates,
which identify mineralisation, are derived from logged observations. However, no visual
estimates of the percentage of mineralisation are provided, The Accurate and representative
estimatesofthe base metals contentcanbefoundintheassay tablesintheappendixbelow
About LitchfieldMinerals
LitchfieldMineralsisacriticalmineralexplorer,primarilysearching for basemetals anduranium
out of the Northern Territory of Australia. Our mission is to be a pioneering copper exploration
company committed to delivering cost-effective, innovative and sustainable exploration
solutions.
We aim to unlock the full potential of copper and other mineral resources while minimising
environmental impact, ensuring the longevity and affordability of these essential metals for
future generations.
We are dedicated to involving cutting-edge technology, responsible practices and stakeholder
collaboration drives us to continuously redefine the industry standards and deliver value to our
investors, communities andthe world.”
The announcementhasbeen approvedby the Board of Directors.
13 | P a g e
For further informationplease contact:
Matthew Pustahya
Matthew@litchfieldminerals.com.au
Followus on:
www.litchfieldminerals.com.au
https://twitter.com/Litchfield_LMS
https://www.linkedin.com/company/litchfield-minerals-limited/
CompetentPerson’s Statement
The information in this Presentation that relates to Exploration Results is based on, and fairly
represents, information and supporting documentation compiled by Mr Russell Dow (MSc,
BScHons Geology), a Competent Person who is a Member of the Australian Institute of Mining
andMetallurgy (AUSIMM) and is a full-time employee of Litchfield Minerals Limited. Mr Dow has
sufficient experience that is relevant to the style of mineralisation and types of deposits under
consideration and to the activity being undertaken to qualify as a Competent Person as defined
in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral
ResourcesandOreReserves”(JORCCode). MrDowconsentstotheinclusioninthereportofthe
matters based on his information in the form and context in which it appears. Withregard to the
Company’s ASX Announcements referenced in the above Announcement, the Company is not
aware of any new information or data that materially affects the information included in the
Announcements.
Forward-Looking Statements and ImportantNotice
Statements regarding plans withrespect to Litchfield’sprojectare forward-looking statements.
There canbe noassurance that the Company’splansforthe developmentofitsprojects will
proceedascurrentlyexpected. These forward-looking statementsare basedonthe Company’s
expectations and beliefsconcerning future events. Forward-looking statementsare necessarily
subjecttorisks, uncertainties, andotherfactors,manyofwhich are outside the control of the
Company, which could cause actualresultstodiffermateriallyfrom suchstatements.
14 | P a g e
JORCCode,2012Edition– Table 1report
Section 1Sampling Techniques andData
(Criteriainthis sectionapply toall succeeding sections.)
Criteria JORCCodeexplanation Commentary
Sampling
techniques
• Natureand qualityof sampling (eg cut channels,randomchips,
orspecificspecialisedindustry standard measurementtools
appropriatetotheminerals underinvestigation, suchas down
holegammasondes,orhandheldXRFinstruments,etc). These
examplesshouldnotbetakenaslimiting the broadmeaning of
sampling.
• Include referencetomeasurestakentoensuresample
representivity and theappropriate calibrationof any
measurementtoolsorsystemsused.
• Aspects of thedetermination of mineralisationthatareMaterial
to thePublicReport.
• In cases where‘industry standard’work hasbeendonethis
wouldberelatively simple(eg ‘reversecirculationdrilling was
usedtoobtain1m samplesfrom which 3kg waspulverisedto
producea 30g chargeforfireassay’). Inothercasesmore
explanationmayberequired,such as where thereiscoarsegold
thathas inherentsampling problems. Unusualcommoditiesor
mineralisation types(eg submarinenodules)may warrant
disclosureof detailed information.
• ReverseCirculation (RC)andDiamond Drilling (DD) was
used toobtainone metreindividuallybaggedchip samples
frompre-collarsanddedicatedRCholes.
• Each RCbag wasspearsampled toprovidea 4-metre
representative compositesample foranalyses. In
mineralised oranomalous zones, individual 1-metre spear
sampleswere used.
• Diamonddrilling core was cut inhalfwithhalfretained and
the otherhalfsubmittedfor analysis. Sampleintervalswere
determinedfromgeological logging andare onthemetre in
unmineralised core andon the geological/mineralization
contact witha minimum0.2m andmaximum 1.2msample
length.
• QAQC standards (blank &reference) andduplicatesamples
were includedroutinely with 1per50samplesbeing a
standardorduplicate.
• Samples weresent to an independent commercialassay
laboratory Bureau Veritas.
15 | P a g e
Criteria JORCCodeexplanation Commentary
• All assay samplepreparation comprisedovendrying,
pulverising and splitting to arepresentativeassay charge
pulp.
• Samples wereanalysedfor amultielementsuite (59
elements) by a combinationofICP-OES
(Al,Ba,Ca,Cr,Cu,Fe,K,Li,Mg,Mn,Na,Ni,P,S,Sc,Ti,V,Zn,Zr) and
ICP_MS(Ag,As,Be,Bi,Cd,Ce,Co,Cs,Dy,Er,Eu,Ga,Gd,Hf,Ho,In,
La,Lu,Mo,Nb,Nd,Pb,Pr,Rb,Re,Sb,Se,Sm,Sn,Sr,Ta,Tb,Te,Th,
Tl,Tm,U,W,Y,Yb)following a multi-acid digest. Assaysfor Au
were completedby 40gram Fire Assaywith an AASfinish. The
assay methodsusedareconsideredappropriate.
• QAQC standards (blank &reference) andduplicatesamples
were includedroutinely with 1per50samplesbeing a
standardorduplicate.
• Sampleshave beensent to an independent BureauVeritas.
Drilling
techniques
• Drill type (eg core,reversecirculation, open-holehammer,rotary
air blast,auger, Bangka,sonic,etc)and details (egcorediameter,
triple orstandard tube,depthof diamond tails,face-sampling bit
orothertype, whether core isorientedand if so,by whatmethod,
etc).
• RCdrilling was undertaken by SilverCityDrilling using a 5.5“
face sampling drillbit.
• DD drilling wasundertaken by SilverCityDrilling using a
Hydco 1000rig andHQ3diameter core.
• All RC andDDholes weresurveyedduring drilling using a
GyroMasternorth seeking gyrotool.
Drillsample
recovery
• Methodof recording andassessing core andchipsample
recoveries and results assessed.
• RCsample recoveriesarevisually estimatedfor each metre
withpoororwet samplesrecorded indrilland sample log
16 | P a g e
Criteria JORCCodeexplanation Commentary
• Measures taken tomaximisesample recovery andensure
representativenatureof thesamples.
• Whether arelationshipexistsbetweensamplerecovery and
gradeand whethersample biasmayhaveoccurreddue to
preferentialloss/gainof fine/coarsematerial.
sheets. Thesample cyclone wasroutinely cleanedat the
endof each 6mrod andwhendeemed necessary.
• DD recoveries wereassessedbycomparing run
length/drilledlengthon core blocks to lengthofcore in trays.
Data wasrecordedingeologicallogs.
• No relationship hasbeendeterminedbetweensample
recoveriesandgradeandthere is insufficientdatato
determine if there is asample bias.
Logging • Whethercore andchipsampleshavebeengeologicallyand
geotechnically loggedtoa levelof detail to supportappropriate
MineralResourceestimation,mining studies and metallurgical
studies.
• Whether logging isqualitativeorquantitative innature. Core(or
costean,channel,etc)photography.
• Thetotal lengthand percentageof therelevantintersections
logged.
• Geological logging ofRC/DD drillholes wasdoneon avisual
basis withlogging including lithology, alteration,
mineralization,structure,RQD/Recovery, weathering,
oxidationetc.
• Logging ofRC/DDdrillsamples isqualitative and based on
the presentationofrepresentativedrillchipsretained forall
1m sampleintervals inthe chiptraysandwhat ispresented
in the coresamples.
• All drillholeswere loggedin their entirety.
Sub-
sampling
techniques
andsample
preparation
• If core, whethercutorsawn and whether quarter,half or all core
taken.
• If non-core,whetherriffled, tubesampled,rotary split,etcand
whethersampled wetordry.
• Forallsampletypes, thenature, quality and appropriateness of
thesamplepreparationtechnique.
• Qualitycontrolprocedures adoptedfor allsub-sampling stages
• All RC assays reportedare from 1mconesplitsamples.
• 1m conesplitsamples were collectedforallmetres at the
time ofdrilling from the drill rig mountedconesplitter.
• Selected 1m cone splitsamples forintervalsdeemed of
interest by thegeologistsupervising thedrillrig were
submittedforpriorityassay.
17 | P a g e
Criteria JORCCodeexplanation Commentary
tomaximise representivity of samples.
• Measures taken to ensurethat thesampling isrepresentativeof
theinsitumaterialcollected,including forinstanceresultsfor
fieldduplicate/second-half sampling.
• Whethersample sizesareappropriatetothegrainsize of the
materialbeing sampled.
• The sample size is considered appropriate forthe
mineralisationstyle, application andanalyticaltechniques
used.
• All DD core was cutinhalf with one halfbeing retained and
the otherhalfbeing submittedtothe lab foranalysis. In
areasofvisual mineralizationormetalanomalismsample
intervalswere determined fromdetailedgeologicallogging
contactswhereasgeologically uninteresting zoneswere
sampled onthe metre. Half core satisfiessample
representivityandsample size criteria.
• QAQC referencesamplesand duplicatesare routinely
submitted with eachbatch.
• QAQC standards (blank &reference) andduplicatesamples
were includedroutinely with 1per50samplesbeing a
standardorduplicate.
• Samples weresent toBureau Veritas in Adelaide, an
independent commercialassay laboratorywhere the
samplesareweighed tothe nearestgram.
• The samplesaredried, crushedtonominal10um and
pulverisedtonominal85% passing 75umbeforeanalyses.
Qualityof
assay data
and
• Thenature, qualityandappropriatenessof theassaying and
laboratory proceduresusedand whether thetechnique is
consideredpartialortotal.
• Forgeophysical tools,spectrometers,handheld XRF instruments,
• RCChip anddiamondcore samples are analysedfor a
multielement suite (59elements)bya combination of ICP-
OES (Al,Ba,Ca,Cr,Cu,Fe,K,Li,Mg,Mn,Na,Ni,P,S,Sc,Ti,V,Zn,Zr)
18 | P a g e
Criteria JORCCodeexplanation Commentary
laboratory
tests
etc,theparametersusedin determining theanalysis including
instrumentmake andmodel,reading times, calibrationsfactors
appliedand theirderivation,etc.
• Natureof quality controlprocedures adopted(eg standards,
blanks,duplicates,external laboratory checks) andwhether
acceptable levelsof accuracy (ielackof bias)andprecisionhave
beenestablished.
and
ICP_MS(Ag,As,Be,Bi,Cd,Ce,Co,Cs,Dy,Er,Eu,Ga,Gd,Hf,Ho,In,
La,Lu,Mo,Nb,Nd,Pb,Pr,Rb,Re,Sb,Se,Sm,Sn,Sr,Ta,Tb,Te,Th,
Tl,Tm,U,W,Y,Yb)following a multi-acid digest. Assaysfor Au
were completedby 40gram Fire Assaywith an AASfinish. The
assay methodsusedareconsideredappropriate.
• QAQC standards andduplicatesare routinely includedata
rateof 1per50samples.
• Further internallaboratory QAQCproceduresincluded
internalbatchstandardsandblanks.
• SamplepreparationwascompletedatBureauVeritas
Laboratory (Adelaide).
• A Nitonportablehandheld XRF (pXRF) hasbeen used only to
assistfieldlogging and asaguideforsampleselection. No
pXRFvalues are reported.
Verification
of sampling
andassaying
• Theverificationof significant intersectionsby eitherindependent
oralternativecompanypersonnel.
• Theuse of twinnedholes.
• Documentationof primary data,dataentry procedures,data
verification,datastorage(physical andelectronic)protocols.
• Discussanyadjustmentto assay data.
• Field dataiscollected onsite using astandardsetof logging
templatesentereddirectly intoa laptop computer.Datais
thensentto the LitchfieldMineralsdatabase manager for
validationanduploadinto the database.
• Assaysareasreportedfrom the laboratory and stored inthe
Company database andhave notbeenadjustedinanyway.
19 | P a g e
Criteria JORCCodeexplanation Commentary
Locationof
datapoints
• Accuracy and quality of surveysusedtolocatedrillholes(collar
anddown-holesurveys), trenches,mine workings andother
locations used inMineralResource estimation.
• Specificationof thegridsystem used.
• Quality and adequacy of topographiccontrol.
• Drillhole collarsaresurveyed with ahandheld GPS withan
accuracy of+/- 5m whichis consideredsufficientfor drill
hole locationaccuracy.
• Co-ordinates are inGDA94 datum, Zone 52.
• Downholedepthsare inmetres measureddownhole from
the collarlocation onsurface.
• Topographic controlhasan accuracy of2m basedon
detailed satellite imagery derived DTMoronlaser altimeter
data collected fromaeromagneticsurveys.
Dataspacing
and
distribution
• Dataspacing forreporting of ExplorationResults.
• Whether thedataspacing anddistribution issufficientto
establishthedegreeof geologicaland grade continuity
appropriatefortheMineral Resourceand OreReserveestimation
procedure(s)andclassificationsapplied.
• Whethersample compositing hasbeenapplied.
• Drillholespacing wasdesigned totargetpotential
mineralisationasindicated by previousdrilling and
geologicalinterpretation.
• Thisspacing has beendeemed adequate forfirstpass
explorationlevelassessment onlyandisnot considered
sufficient todetermineInferredMineralResources.
• RCdrillholeswere sampled from surfaceona 4m
compositebasisoras1m, 2m, or 3msamplesas
determinedby the end ofholedepthor underinstruction
fromthegeologistsupervising the program.
• 1m conesplitRCsamples were collected throughzonesof
geologicalinterest.
• DD coresamples wereselected basedongeological
contactsunderinstruction fromthesupervising geologist.
20 | P a g e
Criteria JORCCodeexplanation Commentary
Orientation
of data in
relationto
geological
structure
• Whether theorientation of sampling achievesunbiased sampling
of possiblestructuresand theextent to whichthis is known,
considering thedeposittype.
• If therelationshipbetween thedrilling orientation andthe
orientationof key mineralised structures is considered tohave
introduceda sampling bias, thisshouldbe assessed and
reported if material.
• It isunknown whethertheorientationof sampling achieves
unbiased sampling as interpretation ofquantitative
measurementsof mineralised zones/structures hasnotyet
been completed.
• The drilling isorientedeither perpendicularto the lithological
strike and dip ofthetarget rock.
Sample
security
• Themeasurestakentoensuresamplesecurity. • Each sample wasputintoa tiedoff calico bag andthen
severalplaced in largeplastic“polyweave”bags which were
zip tied closed.
• Samples weredriventoAlice Springsbycompany
representativesand thencouriered totheBureauVeritas
labsinAdelaide.
Audits or
reviews
• Theresultsof anyauditsor reviewsof sampling techniquesand
data.
• Continuous improvementinternalreviewsof sampling
techniques andprocedures areongoing.Noexternal audits
havebeenperformed.
Section 2Reporting of Exploration Results
(Criterialisted inthepreceding section alsoapply to thissection.)
Criteria JORCCodeexplanation Commentary
Mineral
tenement
andland
tenurestatus
• Type,referencename/number,locationand ownership including
agreementsormaterialissues with thirdpartiessuchas joint
ventures,partnerships,overriding royalties, nativetitle interests,
historical sites, wilderness ornationalparkandenvironmental
settings.
• Refer to Section4 in Independent GeologistsReport (IGR)by
Ross etal, 2023forfurther detail. Insummary,theMount
Doreenproject issecuredbyEL31305 fortotalof
approximately 388.35square kilometres.
21 | P a g e
Criteria JORCCodeexplanation Commentary
• Thesecurity of thetenureheld at thetime of reporting along with
anyknownimpediments to obtaining alicenceto operateinthe
area.
• All tenements withintheMt Doreenare 100%owned by
LitchfieldMineralsLtd.
• The Mt Doreen Project is located325kmnorthwestof Alice
Springspastoral lease. The tenementsare ingoodstanding
andthere arenoknownimpediments.
Exploration
doneby
otherparties
• Acknowledgmentand appraisalof explorationby other parties. • Refer to Section 6 and 7 in Independent Geologists Report
(IGR) by Ross et al, 2023 for further detail. A summary of
previous exploration andmining ispresentedbelow.
• 1930-1956: Minoramountsofcopperandtungs
Share your feedback
Discover