Major Discovery 1km plus High Chargeability Target Found
Released
Released
Announcement PDF
ASX Announcement | 5th March 2025
Major Discovery, +1km-Long High-Chargeability Target at
Oonagalabi
HIGHLIGHTS:
• Majorchargeabilityanomaliesidentified–Twolarge,high-intensitysulphide-bearing
targets extend over 1km in strike and +500m depth (+20mV/V).
• Significant mineral system emerging – large, high chargeability cores (+40mV/V, up
to 60mV/V) point to a potentially higher-grade core to the system.
• Untested, high-priority drill targets – Historic drilling tested the peripheral alteration
zones, leaving the strongest chargeability anomalies untested.
• Chargeability following on from 3km long Soil Strike - Strong chargeability response
open to NE & SW correlating with a 3km soil geochemical anomaly strike (As
announced 29th January 2025).
• Drill-for-equity partnership secured – Bullion Drilling to complete Phase 1 drilling
under a 50% drill-for-equity arrangement at an equity premium of 0.12c, ensuring
rapid advancement while preserving cash.
• Potential Source intrusion identified – New structural interpretation suggests a
possible intrusive source 900m northeast of Oonagalabi, adding further exploration
scale potential.
• Environmental Mining Licence approved for public exhibition – Litchfield’s
Environmental Mining Licence has met government criteria and entered a 15-day
public exhibition period.
Litchfield Minerals Limited (“Litchfield” or the “Company”) (ASX: LMS) is pleased to
announce that its latest Induced Polarisation (IP) survey at the Oonagalabi Project (NT)
has returned exceptional results, confirming the presence of a large, high-chargeability
system that remains completely untested by historical drilling.
IP Survey Confirms Large Untested Sulphide System
The Pole-Dipole Induced Polarisation (PDIP) survey, completed by Planetary Geophysics Ltd.,
covered 13.1 line-km across the Oonagalabi prospect (Figures 1 – 2). The survey successfully
defined:
• Twomajor,sub-parallelchargeabilityanomalies,extending1kmalongstrikeandfrom
surface to over 500m depth.
• A higher-grade core of +40mV/V, extending over 500m and reaching peak values of
60mV/V, correlating with stronger sulphide mineralisation potential.
• Chargeable zones that remain entirely untested by historical drilling, presenting a
compelling opportunity for a major discovery.
• Chargeable zones still open to the Northeast and Southwest.
Figure 1. Oonagalabi 2025 PDIP chargeability 150m depth slice showing the location of two parallel
chargeable bodies. The western anomaly is coincident with outcropping Oonagalabi Formation while
the eastern anomaly is not exposed, has no surface expression and represents a new discovery.
Figure 2. Oonagalabi 2025 PDIP resistivity (left) and chargeability (right) 2D inverted stacked 150m
spaced sections equalling 1.2kms in length and each line 1.6kms long and anomalies extending to
500m below surface.
Managing Director & CEO, Matthew Pustahya, commented:
“The results from this latest IP survey have exceeded our expectations and have provided a
significant breakthrough in our understanding of the Oonagalabi system. We now have clear
evidence of a large, continuous chargeable body extending over 1km in strike length and
more than 500m in depth which appears to be open to the northeast and southwest, with a
high-chargeability core that remains completely untested by drilling.
Importantly, the few historical drill holes that did intersect the +20mV/V chargeability shell
contain the best mineralisation recorded to date, reinforcing the strong correlation between
chargeability and sulphide mineralisation. However, no previous drilling has ever tested the
highly chargeable +40mV/V to 60mV/V core, which presents a compelling opportunity to
define a higher-grade zone within the system.
Our geological model continues to evolve, and we now believe that Oonagalabi may be part
of a large skarn system. This interpretation is further supported by the identification of a
potential intrusive source 900m to the northeast, which appears structurally linked to the
mineralised body. If this intrusion is confirmed as the primary driver of the system, it could
significantly expand the exploration potential beyond the known mineralised footprint.
With these outstanding results in hand, we are pleased to have secured a strategic drilling-
for-equity agreement with Bullion Drilling Co,one of Australia’spremier RC drillers, at a 26%
premium to our current share price. This agreement allows us to complete up to 2,000m of
drilling while preservingcapital, ensuringwe canaggressively test these high-prioritytargets
without unnecessary shareholder dilution.
We are now moving quickly to finalise our drill program, with approvals expected in the
coming weeks and drilling set to commence in late March / early April. We believe
Oonagalabihasthe scaleandgeological characteristicstodevelopintoasignificantdiscovery,
and this next drilling phase will be pivotal in unlocking its full potential."
Phase 1 Drilling Plan – High-Priority Targets to be Tested
Based on these excellent survey results, Litchfield has finalised plans for a targeted Phase 1
drillingprogramdesigned todirectlytestthe strongest chargeabilityanomalies. Theprogram
includes:
• 6 RC holes, with five holes targeting the high-chargeability western anomaly and one
hole testing the eastern anomaly.
• Drill spacing of 150m per hole, specifically designed to test the higher-grade zones of
the system identified by chargeability and to demonstrate scale.
• Focus on intersecting the +40mV/V to 60mV/V chargeability core, which remains
completely untested.
Drilling is set to commence in late March / early April, pending a final Northern Territory
government approval of the Environmental Mining Licence, which has met government
criteria and has since entered a 15-day public exhibition period.
Strategic Drilling-for-Equity Agreement with Bullion Drilling
To fast-track exploration while minimising shareholder dilution, Litchfield has secured a
drilling-for-equity partnership with Bullion Drilling, one of Australia’s leading RC drillers.
Under this agreement:
• Bullion Drilling will complete up to 2,000m of RC drilling for 50% equity
• Litchfield will pay 50% of drilling costs in fully paid shares, preserving cash for further
exploration.
• Equityofupto$300,000at12cpershare,representinga26%premiumtoyesterday’s
closing price.
This agreement reflects strong industry confidence in Oonagalabi potential and allows
Litchfield to rapidly advance the project with minimal financial outlay.
Geological model
• Oonagalabi is interpreted as a large skarn system formed through metasomatic
alteration driven by hydrothermal fluids from a nearby intrusive body.
• A potential intrusion is located ~1km northeast, based on structural and Magnetic
data obtained from December 2024 interpretations (as announced 13th Jan 25).
• Recent magnetic survey data highlights a prominent magnetic structure extending
through Oonagalabi, appearing linked to the intrusion (Figure 3).
• Structural features further support this interpretation, reinforcing the relationship
between the deposit and the intrusive system.
• Future drilling and geophysical surveys (Phase 2 or 3) will target the northeast sector
to confirm the genetic relationship between the intrusion and skarn mineralisation,
further delineating the system’s scale and economic potential.
Figure3. Oonagalabi2024magneticsurveyhighlightsapotentiallinkbetweenthemodelledintrusion
and 2025 chargeability zones. High magnetic features (purple) extend from modelled intrusion
through the Oonagalabi deposit (Green).
Next Steps & Exploration Timeline
• Environmental Mining plan approval expected within two weeks, clearing the way for
the drilling programme to start.
• Drilling to commence in late March / early April, targeting the strongest chargeability
zones within the system, aiming to find a high-grade sulphide core.
• Ground gravity survey scheduled for early March, covering the full 3km strike length
of the Oonagalabi system (800 stations, 100 x 50m grid).
• Additional geophysical work to northeast of Oonagalabi, targeting the interpreted
source intrusion, which may be the driver of the mineralised system.
With a major untested chargeability anomaly, a clear geological model, and a funded drilling
campaign, Litchfield Minerals is well-positioned to deliver early, significant exploration
success at Oonagalabi in 2025.
Summary of Bullion Drilling Co HOA
The Company is pleased to announce that it has signed a binding heads of agreement (HOA)
withBullionDrillingCoPtyLtd(BullionDrilling)toprovide~2000mofRCdrillingforphaseone
of the Company’s Oonagalabi RC drilling program at a cost of up to $600,000.
50% of drilling costs (up to a maximum of $300,000) will be satisfied through the issue of
Shares to Bullion Drilling at a deemed issue price of $0.12 a Share, resulting in a maximum of
2.5 million Sharesbeing issued on completion of drilling, anticipated to be by April 2025. 30%
of Shares will be voluntarily escrowed for 3 months from issue and 40% for 6 months from
issue.
The Company has also agreed under the HOA to grant Bullion Drilling exclusivity, by way of a
first right of refusal, to provide RC drilling services to the Company in the 18-month period
from the date of the HOA, subject to Bullion Drilling having capacity and negotiation of a
formal drilling contract.
Cautionary Statement
This announcement contains forward-looking statements that involve known and unknown
risks, uncertainties, and other factors that may cause actual results, performance, or
achievements to differ materially from those expressed or implied. Such statements include
but are not limited to, interpretationsof geophysical data,planned exploration activities,and
potential mineralisation outcomes.
Forward-looking statements are based on Litchfield Minerals Limited’s current expectations,
beliefs, and assumptions, which are subject to change in light of new information, future
events, and market conditions. While the Company believes that such expectations and
assumptions are reasonable, they are inherently subject to business, geological, regulatory,
and operational risks.
Exploration results discussed in this announcement do not guarantee the definition of a
mineral resource or ore reserve under the JORC Code (2012 Edition). Further work, including
drilling, is required to determine the economic significance of any anomalies identified.
Investors should not place undue reliance on forward-looking statements.
Litchfield Minerals Limited disclaims any obligation to update or revise any forward-looking
statements to reflect eventsor circumstancesafter the date of thisannouncement,except as
required by law.
About Litchfield Minerals
Litchfield Minerals is a cri�cal mineral explorer, primarily searching for base metals and
uranium out of the Northern Territory of Australia. Our mission is to be a pioneering copper
explora�on company commited to delivering cost-effec�ve, innova�ve and sustainable
explora�on solu�ons. We are dedicated to involving cu�ng-edge technology, responsible
prac�ces and stakeholder collabora�on drives us to con�nuously redefine the industry
standards and deliver value to our investors, communi�es and the world.
The announcement has been approved by the Board of Directors.
For further informa�on please contact:
Mathew Pustahya
Mathew@litchfieldminerals.com.au
Follow us on:
www.litchfieldminerals.com.au
htps://twiter.com/Litchfield_LMS
htps://www.linkedin.com/company/litchfield-minerals-limited/
Competent Person’s Statement
The informa�on in this Presenta�on that relates to Explora�on Results is based on, and fairly
represents, informa�on and suppor�ng documenta�on compiled by Mr Russell Dow (MSc,
BScHonsGeology), aCompetentPersonwhoisaMemberoftheAustralian Ins�tuteofMining
and Metallurgy (AUSIMM) and is a full-�me employee of Litchfield Minerals Limited. Mr Dow
has sufficient experience that is relevant to the style of mineralisa�on and types of deposits
under considera�on and to the ac�vity beingundertaken to qualify as a Competent Person as
defined in the 2012 Edi�on of the “Australasian Code for Repor�ng of Explora�on Results,
Mineral Resources and Ore Reserves” (JORC Code). Mr Dow consents to the inclusion in the
report of the maters based on his informa�on in the form and context in which it appears.
With regard to the Company’s ASX Announcements referenced in the above Announcement,
the Company is not aware of any new informa�on or data that materially affects the
informa�on included in the Announcements.
JORC Code, 2012 Edi�on – Table 1 report
Sec�on 1 Sampling Techniques and Data
(Criteria in this sec�on apply to all succeeding sec�ons.)
Criteria JORC Code explana�on Commentary
Sampling
techniques
• Nature andquality of sampling(e.g.cutchannels,randomchips,
or specific specialised industry standard measurement tools
appropriate to the minerals under investigation, such as down
hole gamma sondes, or handheld XRF instruments, etc). These
examples should not be taken as limiting the broad meaning of
sampling.
• Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determinationof mineralisation thatare Material
to the Public Report.
• In cases where ‘industry standard’ work has been done this
The instruments and parameters used for the Pole-Dipole Induced
Polariza�on survey are as follow:
• Pole-dipole IP/Resis�vity �me series data was acquired
with V-Full Waver IP/Resis�vity Receivers in a distributed
pole-dipole array read in both senses C>P & C<P and with
the I-Full Waver Current Recorder recording full wave form
transmission data.
• All Receivers and the full wave form Current Recorder are
manufactured by Iris Instruments of Orleans, France
(www.iris-instruments.com).
• Pole-dipole current in injec�on was via one (1x) GDD TX4
5000W/20A transmiter manufactured by GDD
instrumenta�on of Quebec Canada
(www.gddintrumenta�on.com).
Criteria JORC Code explana�on Commentary
would be relatively simple (e.g. ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other cases more
explanation may be required, such as where there is coarse gold
that has inherent sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules) may warrant
disclosure of detailed information.
• Transmiters were powered by one (1x) Kubota 9000W
Diesel Generator.
Pole-Dipole Data Acquisi�on
• Tx Electrode Type: Aluminium foil lined pit (Remote CA) &
10mm welded mesh (Forward CB)
• Rx Electrode Type: CuSO4 Non-polarising porous pot
• Tx wire Type: 2.5mm Cu conductor
• Rx wire Type: 1.5mm Cu conductor
• Rx Line spacing: 100m
• Rx Dipole spacing: 50m.
• Time Base: 2s ON/2s OFF
• Windows: 20
• Timing Windows (ms):
20/20/20/20/40/40/40/40/80/80/80/80/
120/120/120/120/180/180/180/180
• mDelay (ms): 70
Instrument technical specifica�ons
• Tx Receivers:
Criteria JORC Code explana�on Commentary
• Iris V-Fullwaver Receiver
• Channels: 2
• Input voltage: Max. input voltage: 15 V, Protec�on: up to
1000V
• Voltage measurement: Accuracy: 0.2 %, typical Resolu�on:
1 µV, Minimum value: 1 µV
• Input impedance: 100 MΩ
• Signal waveform: All IP measurements were made in the
�me-domain using a two second half-duty cycle (2s ON/2s
OFF). An integra�on window of 0.5 to 1.1 seconds has
been used for the final chargeability calcula�on.
• GPS input for coordinates and synchronisa�on
• Computa�on of apparent resis�vity, average chargeability,
and standard devia�on
• Noise reduc�on: Read dura�on manually selected in
rela�on to apparent injec�on point current (mA) and
power line rejec�on, SP linear dri� correc�on.
• Iris I-Fullwaver Current Recorder
• Input current: +/- 25000mA (op�onal 6, 15 or 50A)
• Resolu�on / Accuracy: 0.1mA / 0.1%
Criteria JORC Code explana�on Commentary
• GPS: GPS input for coordinates and �me synchronisa�on.
Time stamps record within an absolute accuracy of 250us.
• Readings: Current value
• Typically three (3x), 300 second (~75x cycle stacks) reads
at each injec�on point.
• GDD TX IV 5000 Transmiter
• Output Power: 0 to 5000 W
• Input voltage: Standard 240V 50hz
• Output Voltage Range: 150V to 2400V
• Output Current: 30mA to 20000mA
• Transmission Cycle: ON+, OFF, ON-, OFF:
• Timing: 1s, 2s, 4s, or 8s
• Data processed by FW Viewer Prosys III TQIP WinDisp
Res2D
Drilling
techniques
• Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is oriented and if so, by
• No new drilling in this report
Criteria JORC Code explana�on Commentary
what method, etc).
Drill sample
recovery
• Method of recording and assessing core and chip sample
recoveries and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
• No new drilling in this report
Logging • Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
• Whetherloggingis qualitative orquantitative innature.Core (or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections
logged.
• No new drilling in this report
Criteria JORC Code explana�on Commentary
Sub-
sampling
techniques
and sample
preparation
• Ifcore,whethercutorsawnandwhetherquarter,halforallcore
taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of
the sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages
to maximise representivity of samples.
• Measures taken to ensure that the sampling is representative of
the in situ material collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the
material being sampled.
• No new drilling in this report
Quality of
assay data
and
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
• See survey configura�on and system specifica�ons above.
Criteria JORC Code explana�on Commentary
laboratory
tests
• Forgeophysicaltools,spectrometers,handheldXRFinstruments,
etc, the parameters used in determining the analysis including
instrument make and model, reading times, calibrations factors
applied and their derivation, etc.
• Nature of quality control procedures adopted (e.g. standards,
blanks, duplicates, external laboratory checks) and whether
acceptablelevelsofaccuracy(i.e.lackofbias)andprecisionhave
been established.
Verification
of sampling
and
assaying
• Theverificationofsignificantintersectionsbyeitherindependent
or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• No new drilling in this report
• Data detailed in this report has been reviewed and
processed by Rob Angus at Mitre Geophysics.
Location of
data points
• Accuracy and quality of surveys used to locate drill holes (collar
and down-hole surveys), trenches, mine workings and other
• Lines were gridded byPlanetary Geophysics using a Garmin
Map 65 series GPS.
Criteria JORC Code explana�on Commentary
locations used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Waypoints were recorded at every sta�on using
GDA94/UTM.
Data
spacing and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• PDIP was completed on 8, northwest-southeast oriented
lines spaced 150m apart.
• Line spacing is considered appropriate for the scale of the
Oonagalabi system.
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introducedasamplingbias,thisshouldbeassessedandreported
if material.
• Survey lines were oriented perpendicular to known
structureandstra�graphiccontrols(OonagalabiForma�on)
• No bias is expected.
Criteria JORC Code explana�on Commentary
Sample
security
• The measures taken to ensure sample security. • All data was collected under strict data security measures
by Planetary Geophysics Pty Ltd.
Audits or
reviews
• The results of any audits or reviews of sampling techniques and
data.
• Data checks and processing reviews were undertaken daily
and at the comple�on of the program by the contractor.
• Review of the data was undertaken by an independent
consultant (Rob Angus, Mitre Geophysics).
Sec�on 2 Repor�ng of Explora�on Results
(Criteria listed in the preceding sec�on also apply to this sec�on.)
Criteria JORC Code explana�on Commentary
Mineral
tenement
and land
tenure
status
• Type,referencename/number,locationandownershipincluding
agreements or material issues with third parties such as joint
ventures,partnerships,overridingroyalties,nativetitleinterests,
historical sites, wilderness or national park and environmental
settings.
• The security of the tenure held at the time of reporting along
• Tenement includes Oonagalabi (EL32279) for a total of
145.3km2 and 46 sub-blocks.
• EL32279 is owned by Kalk Explora�on Pty. Ltd., a 100%
owned en�ty of Litchfield Minerals Limited. Oonagalabi is
located 125km northeast of Alice Springs on pastoral lease.
Criteria JORC Code explana�on Commentary
with any known impediments to obtaining a licence to operate
in the area.
• The tenements are in good standing and there are no
known impediments.
Exploration
done by
other
parties
• Acknowledgment and appraisal of exploration by other parties. • A summary of previousexplora�on and miningispresented
below:
• Oonagalabi was discovered in the 1930’s.
• In 1970, Russgar Minerals completed regional mag-rad
survey, VLF_EM survey, ground magne�c survey, single line
resis�vity traverse and 14 drillholes.
• In 1971, Geopeko completed limited IP.
• 1979, Amoco completed photo-interpreta�on, rock chip
sampling and drilling (8 holes).
• 1981 D’Dor Mining NL completed limited dipole-dipole IP.
• Silex 2009 completed pole-dipole IP 1 x diamond hole.
Criteria JORC Code explana�on Commentary
Geology • Deposit type, geological setting and style of mineralisation. • The Oonagalabi-type mineralisa�on is considered to be
either skarn-related, sediment-hosted or carbonate
replacement with poten�al for high-grade remobilised
breccia zones similar to the Jervois deposit. EL32279 falls
within one of Geoscience Australia’s IOCG high poten�al
zones.
• The project lies within the Harts Range that represents a
package of mul�ply deformed and metamorphosed
sedimentary and igneous intrusive rocks.
Drill hole
Information
• A summary of all information material to the understanding of
the exploration results including a tabulation of the following
information for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
• No new drilling in this report.
Criteria JORC Code explana�on Commentary
o hole length.
• If the exclusion of this information is justified on the basis that
the information is not Material and this exclusion does not
detract from the understanding of the report, the Competent
Person should clearly explain why this is the case.
Data
aggregation
methods
• In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations (e.g.
cutting of high grades) and cut-off grades are usually Material
and should be stated.
• Where aggregate intercepts incorporate short lengths of high
grade results and longer lengths of low grade results, the
procedure used for such aggregation should be stated and some
typical examples of suchaggregations shouldbe shownindetail.
• The assumptions used for any reporting of metal equivalent
values should be clearly stated.
• No new drilling in this report.
Criteria JORC Code explana�on Commentary
Relationship
between
mineralisati
on widths
and
intercept
lengths
• These relationships are particularly important in the reporting of
Exploration Results.
• Ifthegeometryofthemineralisationwithrespecttothedrillhole
angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are reported,
there should be a clear statement to this effect (e.g. ‘down hole
length, true width not known’).
• No new drilling in this report.
• The IP survey was completed perpendicular to the
mineralized Oonagalabi Forma�on.
Diagrams • Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view
of drill hole collar locations and appropriate sectional views.
• See figures above.
Balanced
reporting
• Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high
grades and/or widths should be practiced to avoid misleading
reporting of Exploration Results.
• Individual IP readings have not been reported, plans within
this report provide an adequate overview of the ground
gravity data.
• All data is of high quality and no data required removal to
complete 2D and 3D inversions.
Criteria JORC Code explana�on Commentary
Other
substantive
exploration
data
• Other exploration data, if meaningful and material, should be
reported including (but not limited to): geological observations;
geophysical survey results; geochemical survey results; bulk
samples – size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
substances.
• See the main body of this report for all per�nent
observa�ons and interpreta�ons.
Further
work
• The nature and scale of planned further work (e.g. tests for
lateral extensions or depth extensions or large-scale step-out
drilling).
• Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling
areas, provided this information is not commercially sensitive.
Future planned explora�on includes:
• Detailed ground gravity (100m x 50m)
• Phase 1 reverse circula�on drilling ( ̴1,600m)
• Lithostructural interpreta�on using the new drone
magne�cs and ground gravity data.
Share your feedback
Discover