Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
1
ASX Announcement | 31st October 2025
Quarterly Activities Report – Quarter ended 30 September 2025
Highlights
• A project wide VTEM survey was initiated at the flagship Oonagalabi Project (Northern
Territory), comprising a large-scale VTEM™ Max survey with high-resolution
magnetics and gravity infill. Interpretation identified five major conductor clusters and
14 high-priority conductor axes, refining the target envelope substantially.1
• Field‐mapping and reconnaissance identified gossanous copper outcrop above a
priority conductor at the VT1/VT2 corridor, confirming mineralisation at surface and
enabling pad/access preparation for drilling.2
• At the Lucy Creek Project, we reported assays up to 35.0 % Mn from the Lucy Creek 2
prospect, accompanied by barite and base-metal pathfinder signatures — indicative
of a hydrothermal manganese system rather than simple supergene enrichment.
• Corporate funding was enhanced: a $500,000 placement successfully completed on
11th August alongside the launch of a Security Purchase Plan (SPP) for eligible
shareholders. Director and management participation (~$105,000) underscored
internal conviction.3
• The SPP closed 15th September and was followed by an oversubscribed placement
and shortfall completion on 18 September, reflecting strong external investor
confidence.
• We remain funded and positioned for rapid execution of a meaningful drilling
program across our high-grade targets a key step in converting exploration value into
discovery value.
DuringtheSeptember2025quarter,LitchfieldMineralsLimited("Litchfield"or"theCompany")
continued to deliver strong momentum across our key projects, significant corporate and
funding milestones, and clearly set the stage for upcoming exploration programmes that we
believe will materially enhance shareholder value.
1
ASX Announcement – 12August 2025 - VTEM Survey CommencesAcross Entire Oonagalabi Project
2
ASX Announcement – 1September 2025 - Gossanous Copper Identified Above Priority Conductor; Scale
and Confidence Build
3
ASX Announcement – 11August 2025 - Successful $500,000 Placement and Launch of Security
Purchase Plan
1
Project Updates
Oonagalabi Project (NT) – Copper-Zinc ± Au/Bi
Exploration Strategy & Targeting
• The project is situated within the Strangways Metamorphic Complex, characterised by
garnetiferous quartzites, amphibole-quartz-diopside schists and forsterite marbles —
a structurally favourable setting for skarn/IOCG style copper-zinc systems.
• During the quarter we executed detailed airborne and ground geophysical surveys –
specifically a VTEM™ Max (1,015 line-km) plus high-resolution magnetics/gravity infill
to image deep basin‐hosted sulphide targets.
• The survey results (released 21st August) defined five major conductor clusters and 14
Priority-1 targets aligned with the folded stratigraphy/anticline hinge zones a
substantial upgrade in target density and scale (Figure 1).
Figure 1 – Priority conductors discovered with the VTEM survey.
1
Mapping & Ground Truthing
• On 1st September (resubmitted 8th September) the Company announced the
identification of gossanous copper outcrop directly above one of the priority
conductors and confirmed site access and preparation for forthcoming drilling (Figure
2).
• These surface observations provide a tangible link between the geophysics and
geology, which significantly de-risks the step into drilling.
Figure 2. Gossan outcrop (482389E, 7438704N) showing classic ex-sulphide boxwork texture
identifiedatVT1immediatelyalongstrikefromoutcroppingOonagalabiFormationmarblewith
oxidised copper mineralisation present.
Visual estimates of mineral abundance results should never be considered a proxy or substitute
for laboratory analyses where concentrations of grades are the factors of principal economic
interest. Visual estimates also potentially provide no information regarding impurities or
deleterious physical properties relevant to valuation.
Drilling Preparation
• In mid-September theCompanyannouncedaplannedRC drillingcampaign(approx.14
holes/~3,750m)targetingtheBomb-Diggitycluster(007P/008P/020P)andVTcorridor
targets, scheduled to begin late September.
1
• Site logistics, ground-works and pad construction ensured rapid mobilisation for the
drill rig.
Outlook
• This upcoming drill campaign is the pivotal next step: if we intersect sulphide
mineralisation in the modelled conductor zones, the result will be transformational for
the Company.
• Following drilling, we plan to deploy Down-Hole Electromagnetics (DHEM) and
structural modelling to refine and expand the target footprint.
Lucy Creek Project (NT) – Manganese / Base Metals
• The Lucy Creek Project continues to develop as a compelling secondary asset. Rock
samples at Lucy Creek 2 returned up to 35.0 % Mn, with strong base metal and barite
pathfinder signatures — signalling hydrothermal-style manganese mineralisation
rather than shallow, weathered material (Figure 3).4
• Given the manganese result, coupled with base-metal indicators, we are planning
follow-up work in the next quarter: structural mapping, infill rock sampling, and
geophysics (where required) to define drill ready targets.
• This upside offers diversification beyond copper-zinc, tapping into critical minerals
demand and enhancing portfolio value.
4
ASX Announcement – 10 September 2025 - Lucy Creek 2assaysverify manganese up to 35.0% Mn with
hydrothermal signature
1
Figure 3. Manganese rock-chip taken from the Lucy Creek2 are at our Lucy Creek project.
Visual estimates of mineral abundance results should never be considered a proxy or substitute
for laboratory analyses where concentrations of grades are the factors of principal economic
interest. Visual estimates also potentially provide no information regarding impurities or
deleterious physical properties relevant to valuation.
Outlook & Key Milestones (Quarter ending 31 December 2025)
• Drilling at Oonagalabi: Mobilisation of RC drilling programme is scheduled for early
October (pending rig logistics). We will test 14 high-priority conductors, with results
expected sequentially into Q2 FY26.
• Lucy Creek follow-up: We will initiate target ranking, mapping and sampling to define
drill-ready targets; a drill date will be set once logistics and permits align.
1
• Investor Engagement: We will sustain momentum in the market, highlighting our
field-work programme, commodity cycle dynamics (copper, zinc, manganese) and our
differentiated exploration strategy.
• Sustainability & Stakeholder Engagement: Community and indigenous engagement,
environmental management and access approvals continue to be high priority,
ensuring field programmes progress without interruption and with strong social
licence.
• Grant utilisation: Our awarded NT Government grants (for VTEM, diamond drilling
and airborne surveys) will be leveraged to maximise field capital efficiency and
augment exploration exposure as well as extending the Northern Territory
government’s geological data base.
Risks & Mitigations
While the outlook is positive, shareholders should be aware of the following key risks:
• Exploration risk: Drilling may fail to intersect commercial-grade mineralisation —
mitigation: we have refined targets via geophysics, mapping and multivariate data.
• Funding risk: While funded for current programmes, further work may require
additional capital — mitigation: we have proven placement/SPP mechanisms and
maintain cost discipline.
• Permitting/Access risk: Remote field programmes can be delayed by weather, logistics
or stakeholder negotiations - mitigation: access contracts, camp logistics and
community engagement are pre-arranged.
• Commodity price risk: Market prices for copper, zinc, manganese can fluctuate —
mitigation: our diversified commodity portfolio and emphasis on discovery and scale
reduce dependence on short-term price movements.
CORPORATE
Cash Position
As at 30 September 2025, the Company held $1. 6 million cash at bank (unaudited).
Funding & Capital Structure
1
• On 11th August we completed a $500k placement and launched a SPP to raise up to
$1m, at $0.10 per share and one attaching option (ex $0.10, expiry 31 August 2027) for
every two shares subscribed. Director/management participation (~$105k) reinforced
alignment.
• On 18th September we successfully executed an oversubscribed placement/shortfall
offer, strengthening our balance sheet and enabling full funding of the drilling
programme.
• The Annual Report and Corporate Governance Statement for year ended 30th June
2025 were lodged on 19th September, supporting our commitment to high standards
of disclosure, governance and transparency.
• As at 30th September 2025, the Company has 51,238,558 shares on issue, of which
7,192,500 shares from the IPO are escrowed till 13/03/2026.
• There are 7,000,000 performance rights on issue.
• There are 16,700,000 unlisted options on issue, of which 7,500,000 were issued from
the Placement and SPP, and 8,200,000 are subject to escrowed for 24 months from
official quotation.
Corporate Governance & Market Engagement
• Substantial holder and director interest notices were lodged 23rd September; these
disclosures maintain transparency given the increased project momentum and equity
funding activity.
• The updated corporate presentation (11th August) communicates our exploration
strategy, project scale, and forthcoming catalysts to both retail and institutional
stakeholders.5
ASX Listing Rule 5.3.1 Disclosure
$0.469 million exploration spend during the quarter can be summarised as:
● $0.400 million related exploration activities on Oonagalabi; and
● $0.069 million on general exploration activities.
ASX Listing Rule 5.3.2
The Company confirms that there was no mine production and development activities for the
Quarter.
5
ASX Announcement – 11 August 2025 - Corporate Update Presentation
1
ASX Listing Rule 5.3.4
The Company provides a comparison of its actual spend against the estimated expenditure on
“use of funds” items set out in the Company’s Prospectus dated 24 January 2024.
ASX Listing Rule 5.3.5
$78,000 was paid during the quarter to Related Parties, as reported in clause 6 of the ASX
Appendix 5B (Cash Flow Report), comprised director fees.
TENEMENT INTERESTS
As at 30th September 2025, the Company had interest in the following tenements (as required
by Listing Rule 5.3.3). During this quarter, no additional tenement has been acquired nor any
tenement removed from the company’s portfolio.
Country Location Project Tenement Status Current
Interest (%)
Prior Quarter
Interest (%)
Australia Northern Territory Mount Doreen EL31305 Granted 100% 100%
Australia Northern Territory Lucy Creek EL33568 Granted 100% 100%
Australia Northern Territory Lucy Creek 2 EL33888 Granted 100% 100%
Australia Northern Territory Oonagalabi EL32279 Granted 100% 100%
Australia Northern Territory Paradise Well EL32190 Granted 100% 100%
Australia Northern Territory Silver Valley EL32241 Granted 100% 100%
Funds Allocated Actualto date
$'000 $'000
ExplorationDrilling 2,424 1,857
Geophysics,Mapping,Sample Analysis,Vehicles andTenement Cost 689 1,580
Operational Labour - Exploration 324 338
WorkingCapital andAdministration 1,563 1,124
Use of Funds
1
Cautionary Statement
The information in this announcement relating to mineral exploration results, sampling, geophysical
data, drilling results, and Exploration Targets is preliminary and conceptual in nature. Interpretations,
estimates, and conclusions are based on current data and geological understanding, which may change
as additional information becomes available. There is no certainty that further exploration will lead to
the identification of a mineral deposit or to any commercial development.
All statements, other than statements of historical fact, included in this announcement — including
statementsregardingfutureexplorationactivities,targets,andcompanystrategy—areforward‐looking
statements. These forward‐looking statements involve known and unknown risks, uncertainties, and
other factors that may cause actual results, performance, or achievements to differ materially from
thoseanticipated. Suchfactorsmayincludechangesinexplorationresults,projectpriorities,regulatory
conditions and other risks inherent to mineral exploration.
Readers are cautioned not to place undue reliance on forward‐looking statements or Exploration
Targets. The Company is under no obligation to update any forward‐looking statements or information
in this announcement, except as required by applicable laws or the ASX Listing Rules.
All technical information contained in this release is based on information compiled by qualified and
competent professionals as defined under the JORC Code (2012 Edition).
Forward looking statement
This announcement may include forward-looking statements, which are subject to risks and
uncertainties. Actual results could differ significantly due to factors beyond our control,
including market conditions and industry-specific risks. These forward-looking statements are
based on the Company’s expectations and beliefs concerning future events. No warranty is
given regarding the completeness of the information provided. Please avoid placing undue
reliance on forward-looking statements, as they reflect views only as of the announcement
date.
About Litchfield Minerals
LitchfieldMineralsisacriticalmineralexplorer,primarilysearchingforbasemetalsanduranium
out of theNorthernTerritoryofAustralia. Our missionis tobeapioneeringcopperexploration
company committed to delivering cost‐effective, innovative and sustainable exploration
solutions. We aim to unlock the full potential of copper and other mineral resources while
minimising environmental impact, ensuring the longevity and affordability of this essential
metal for future generations. We are dedicated to involving cutting‐edge technology,
responsible practices and stakeholder collaboration drives us to continuously redefine the
industry standards and deliver value to our investors, communities and the world.
1
The announcement has been approved by the Board of Directors.
For further information please contact:
Matthew Pustahya
Matthew@litchfieldminerals.com.au
Follow us on:
www.litchfieldminerals.com.au
https://twitter.com/Litchfield_LMS
https://www.linkedin.com/company/litchfield‐minerals‐limited/
Competent Person’s Statement
The information in this Presentation that relates to Exploration Results is based on, and fairly
represents, information and supporting documentation compiled by Mr Russell Dow (MSc,
BScHons Geology), a Competent Person who is a Member of the Australian Institute of Mining
and Metallurgy (AUSIMM) and is a full‐time employee of Litchfield Minerals Limited. Mr Dow
has sufficient experience that is relevant to the style of mineralisation and types of deposits
under consideration and to the activity being undertaken to qualify as a Competent Person as
defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves” (JORC Code). Mr Dow consents to the inclusion in the
report of the matters based on his information in the form and context in which it appears.
With regard to the Company’s ASX Announcements referenced in the above Announcement,
the Company is not aware of any new information or data that materially affects the
information included in the Announcements.
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Litchfield Minerals Limited
ABN Quarter ended (“current quarter”)
33 612 660 429 September 2025
Consolidated statement of cash flows Current quarter
$A’000
Year to date (3
months)
$A’000
1. Cash flows from operating activities
1.1 Receipts from customers
1.2 Payments for
(a) exploration & evaluation
(b) development
(c) production
(d) staff costs (7) (7)
(e) administration and corporate costs (52) (52)
1.3 Dividends received (see note 3)
1.4 Interest received
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid
1.7 Government grants and tax incentives 45 45
1.8 Other (provide details if material)
1.9 Net cash from / (used in) operating
activities
(13) (13)
2. Cash flows from investing activities
2.1 Payments to acquire or for:
(a) entities
(b) tenements (11) (11)
(c) property, plant and equipment (2) (2)
(d) exploration & evaluation (469) (469)
(e) investments
(f) other non-current assets - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (3
months)
$A’000
2.2 Proceeds from the disposal of:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) investments
(e) other non-current assets
2.3 Cash flows from loans to other entities
2.4 Dividends received (see note 3)
2.5 Other (provide details if material)
2.6 Net cash from / (used in) investing
activities
(482) (482)
3. Cash flows from financing activities
1,480 1,480
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
3.3 Proceeds from exercise of options
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
(61) (61)
3.5 Proceeds from borrowings
3.6 Repayment of borrowings
3.7 Transaction costs related to loans and
borrowings
3.8 Dividends paid
3.9 Other (provide details if material)
3.10 Net cash from / (used in) financing
activities
1,419 1,419
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
662 662
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(13) (13)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(482) (482)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
1,419 1,419
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (3
months)
$A’000
4.5 Effect of movement in exchange rates on
cash held
- -
4.6 Cash and cash equivalents at end of
period
1,586 1,586
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 1,586 662
5.2 Call deposits
5.3 Bank overdrafts
5.4 Other (provide details)
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,586 662
6. Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
78
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 4
+ See chapter 19 of the ASX Listing Rules for defined terms.
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities
7.2 Credit standby arrangements
7.3 Other (please specify)
7.4 Total financing facilities
7.5 Unused financing facilities available at quarter end
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.9) (13)
8.2 (Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(469)
8.3 Total relevant outgoings (item 8.1 + item 8.2) (482)
8.4 Cash and cash equivalents at quarter end (item 4.6) 1,586
8.5 Unused finance facilities available at quarter end (item 7.5) -
8.6 Total available funding (item 8.4 + item 8.5) 1,586
8.7 Estimated quarters of funding available (item 8.6 divided by
item 8.3)
3.3
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A.
8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A
8.8.3 Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 5
+ See chapter 19 of the ASX Listing Rules for defined terms.
Compliance statement
1 This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2 This statement gives a true and fair view of the matters disclosed.
Date: ................31 October 2025...................................................................
Authorised by: ................By the Board...................................................................
(Name of body or officer authorising release – see note 4)
Notes
1. This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2. If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4. If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5. If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.
Share your feedback
Discover