Oonagalabi IP Supports Expanding Mineral System
Released
Released
Announcement PDF
Litchfield Minerals Limited (ASX: LMS) 02/03/2026
IP Results Strengthen Oonagalabi Discovery Model as Diamond
Drilling Set to Resume
Litchfield Minerals Limited (“Litchfield” or “the Company”) is pleased to provide a significant exploration update from
the Oonagalabi Project in the Northern Territory, where new induced polarisation (“IP”) results continue to validate the
Company’s mineral systems model and support ongoing southward expansion of the system.
Highlights
• IP survey strengthens mineral systems model at Oonagalabi, confirming strong spatial correlation between
magnetic structures and chargeability anomalies.
• Four chargeability trends identified, including a 5km interpreted prospective corridor between VT1 and VT2.
• Silverado Deeps anomaly defined at depth with chargeability commencing ~300m below surface, supporting
potential for deeper mineralisation.
• VT1 IP lines intersect chargeability anomalies adjacent to magnetic features, reinforcing potential for both
disseminated and massive sulphide mineralisation.
• Chargeability trends interpreted to represent subsurface Oonagalabi Formation, consistent with known
mineralisation controls at the Oonagalabi Main Zone.
• Magnetic-chargeability relationship continues south of the known system, potentially validating structural
corridor targeting.
IP Survey Confirms Correlation Between Magnetic Structures and Chargeability
Recent IP surveying, by Planetary Geophysics, targeting the southern extensions of the Oonagalabi corridor has
identified compelling chargeability responses spatially associated with magnetic structures. Across the existing
Oonagalabi deposit, this relationship between magnetics and chargeability has proven to be one of the most reliable
vectors toward mineralisation.
The latest data demonstrates that these geophysical signatures continue south of the known system, reinforcing the
interpretation that mineralised zones may be structurally controlled along magnetic-response corridors. The alignment
between magnetic features and IP chargeability provides strong technical validation for the Company’s exploration
model, which continues to effectively guide targeting across the district and highlights the potential for additional blind
discoveries along the Oonagalabi trend.
Six new lines of IP (13.5-line km) were extended southwest of Oonagalabi through the Silverado prospect and the
Southwest Magnetic Structure (94700N, 94500N, 94300N, 94100N, 93900N, 93700N) and two lines were completed at
VT1 (2.1-line km, 20700E & 20500E), Figure 1.
Managing Director Comment – Matt Pustahya
“The latest IP results further validate our geological model at Oonagalabi. The strong correlation between magnetic
features and chargeability responses as we extend the system south confirms we are operating within the correct
geological framework for additional discoveries.”
“These magnetic corridors are emerging as high-priority growth vectors, and with the model still intact we see good
potential to expand the mineralised footprint. With drilling recommencing this week, our focus is on systematically
testingadditional targetsto refineand expandourunderstanding of thebroader mineralsystem. This includesaplanned
diamond holeadjacent to OGRC002 toobtaincontinuouscorefordetailed structural, lithologicalandalteration analysis.
The objective is to gain better visibility on the gold–bismuth–magnetite mineral assemblage, its textural relationships
and structural controls, and to better define its position within the evolving mineral systems framework”.
Figure1. OonagalabiprojectIPchargeability2Dinversionsections and3Dmagneticinversionpolygons(greenpolygonsrepresent +0.022Magnetic
Susceptibility) highlighting the interpreted 5km long chargeability trend between VT1 and VT2, looking north-northeast. Red IP Chargeability =
+25mV/V
Descriptions- 94700N, 94500N, 94300N, 94100N, 93900N, 93700N (13.- line km)
New Pole-Dipole data has identified laterally extensive chargeability anomalies throughout the Oonagalabi Project
(Figure 2).
Figure 2. IP chargeability stacked 2D inversion sections showingthefour interpreted chargeability trends, looking northeast. 3D magnetic inversion
polygons (green polygons represent +0.022 Magnetic Susceptibility), Red IP Chargeability = +12.5mV/V
Fourchargeabilitytrendshavebeenidentified,includingtwoextendingdirectlysouthwestfromthewesternandeastern
fold zones at Oonagalabi, one interpreted to extend 5km between VT1 and VT2 and a newly identified trend called
Silverado Deeps. The anomalies are less chargeable than the Oonagalabi main zone but clearly demonstrate the
prospective mineralisation trends throughout the project.
Lines 94700N and 93700N, spaced 1km apart, are the two longest IP lines at the project (3.8km and 3km, respectively)
and were designed to increase depth visibility southwest of Oonagalabi and the southwestern magnetic structures and
successfully defined a +9mV/V chargeability anomaly starting at 300m below surface. Two-dimensional inversion
modelling reduces apparent chargeability with depth resulting in deeper anomalies producing apparently lower
amplitudechargeabilitythansimilarzoneswouldnearsurface. So,althoughtheSilveradoDeepschargeabilityanomalies
are about half that at the Oonagalabi Main zone, Litchfield considers these new anomalies significant.
Chargeability within the Oonagalabi Main Zone shows a strong spatial relationship with outcropping Oonagalabi
Formation (marble, metamorphosed carbonate) and drilling has confirmed that the Eastern Fold Zone is also associated
with Oonagalabi Formation that does not have any surface expression1
. The four chargeability trends identified in the
new IP data are also interpreted to represent zones of potentially mineralised Oonagalabi Formation, particularly at
Silverado Deeps and the VT1 – VT2 trend that displays higher chargeabilities.
Mineralisation at Oonagalabi is also directly adjacent to strong magnetic anomalies that are partly related to pyrrhotite
and magnetite within the alteration assemblages as well as magnetic metamorphosed mafic intrusive rocks (mafic
amphibolite). The newly identified chargeability trends are also adjacent to magnetic anomalies (excluding the
1
ASX Announcement - 03/06/2025 – Gold Emergesin High-Mag Zone at Oonagalabi
Oonagalabi Eastern Fold Trend), however, it is too early to determine if this represents magnetite / pyrrhotite alteration
orifthemagneticanomaliesrepresentastructuralcontrolthatfacilitatedhydrothermalfluidflowalongthesepotentially
fertile chargeability trends (Figure 4).
The depth and continuity of the Silverado Deeps anomaly is encouraging, as it supports the Company’s interpretation
that drilling to date may be testing the upper portions of the system, with potential for mineralisation developing at
depth along prospective horizons.
Descriptions VT1 lines- 20700E & 20500E (2.1-line km)
Two, 200m spaced, 1km IP lines were completed at VT1 before heavy rain forced temporary suspension of surveying.
The IP crew have left site due to weather and will return to site in two weeks after the central Australian rain event has
passed.
The eastern line (20700E) straddles the modelled 3,000 and 1,500 Siemens ground EM conductors and the western line
(20500E) transects across mapped surface gossans2
, Figure 3. Both lines have identified +12mV/V chargeability
anomalies that is interpreted to represent disseminated sulphide mineralisation associated with subsurface Oonagalabi
Formation. These chargeability anomalies sit adjacent to magnetic anomalies as with most other chargeability zones
throughouttheproject. Thechargeability anomaliesremainopentotheeastandwest,reinforcingthepotentialforVT1
to represent a sizeable system hosting both massive and disseminated sulphide mineralisation. The IP lines at VT1 are
approximately 2.5km southwest of chargeability anomalies on IP line 93700N (Figure3) and are interpreted to form a
5km prospective trend between VT1 and VT2 (Figure 1), raising the possibility of a potentially large, continuous
mineralised corridor. Further IP surveying will be required to test this interpretation and determine whether the
magnetic structure and associated chargeability responses are continuous and connected across the area.
Figure 3. IP chargeability 2D inversion sections showing the 2.5km interpreted prospective trend between Line 93700N and 20700E at VT1, looking
north-northeast. Green polygons represent the 0.022 magnetic susceptibility shell from the 3D magnetic inversion model. Also shown at VT1 are
two planned RC holes.
2
ASX Announcement – 04/11/2025- VT1 Emerging as a Strong Multi-Plate Conductor, Ground EM Survey to Commence Mid-
November
Figure 4. EL32279 image of the First Vertical Derivative of Reduced to the Pole magnetic data (RTP 1VD) overlying a Google satellite
image showing the location of the new IP lines and the main Oonagalabi prospects located on or adjacent to magnetic anomalies.
Diamond Drilling Progress and Remobilisation
During the most recent drilling campaign, two diamond drill holes were completed:
• One hole targeting the Bomb Diggity intrusion-related target (OGRD001); and
• One hole into the Central Main Zone, aimed at improving geological understanding of the system (OGDD002).
Operations were temporarily paused for two weeks following sustained heavy rainfall across Central Australia, which
significantly impacted access and ground conditions. The drilling contractor and our staff were demobilised to preserve
safety and efficiency, Importantly, no standby charges were incurred from the drilling contractor during the period. The
event has also resulted in delayed turnaround times for logging, sampling and cutting. Drillers have now remobilised to
continue the program, with two additional holes planned:
• A follow-up hole at Bomb Diggity; and
A diamond hole designed to replicate Phase 1 RC hole OGRC002, where 15m @ 0.45 g/t Au, 0.17% Bi3
was intersected
associated with strongly developed magnetite alteration.
3
ASX Announcement – 03/06/2025 - Gold Emergesin High-Mag Zone at Oonagalabi
Additional RC Drilling While Rig is Mobilised
RC rig availability remains constrained across the Northern Territory with our preferred suppliers currently busy. The
larger multi-purpose diamond rig currently on site is suitable for testing only a limited number of specific targets, and
we intend to complete those holes where practical.
However, the size of the rig restricts access across parts of the broader Oonagalabi area due to terrain limitations. As a
result, several planned targets will be deferred until smaller, more mobile rigs become available, allowing drilling to be
conducted more efficiently and with equipment better suited to the ground conditions.
Next Steps
• Resume diamond drilling this week
• Complete targeted RC drilling during current mobilisation
• Integrate new IP and magnetic data into ongoing modelling
Cautionary Statement
This announcement contains forward-looking statements that involve known and unknown risks, uncertainties, and
other factors that may cause actual results, performance, or achievements to differ materially from those expressed or
implied. Such statements include but are not limited to, interpretations of geophysical data, planned exploration
activities, and potentialmineralisation outcomes. Visual estimates of mineral abundance andpXRF resultsshould never
be considered a proxy or substitute for laboratory analyses where concentrations of grades are the factors of principal
economic interest. Visual estimates also potentially provide no information regarding impurities or deleterious physical
properties relevant to valuation. Forward-looking statements are based on Litchfield Minerals Limited’s current
expectations, beliefs, and assumptions, which are subject to change in light of new information, future events, and
market conditions. While the Company believes that such expectations and assumptions are reasonable, they are
inherently subject to business, geological, regulatory, and operational risks. Further work, including drilling, is required
to determine the economic significance of any anomalies identified. Investors should not place undue reliance on
forward-lookingstatements. LitchfieldMineralsLimiteddisclaimsanyobligationtoupdateorreviseanyforward-looking
statements to reflect events or circumstances after the date of this announcement, except as required by law.
About Litchfield Minerals
Litchfield Minerals is a critical mineral explorer, primarily searching for base metals and uranium out of the Northern
Territory of Australia. Our mission is to be a pioneering copper exploration company committed to delivering cost-
effective, innovative and sustainable exploration solutions. We aim to unlock the full potential of copper and other
mineralresourceswhileminimisingenvironmentalimpact,ensuringthelongevityandaffordabilityofthisessentialmetal
for future generations. We are dedicated to involving cutting-edge technology, responsible practices and stakeholder
collaboration drives us to continuously redefine the industry standards and deliver value to our investors, communities
and the world.
Competent Person’s Statement
The information in this announcement relates to Exploration Results and is based on, and fairly represents, information
and supporting documentation compiled by Mr. Russell Dow (MSc, BSc Hons Geology), a Competent Person who is a
MemberoftheAustralianInstituteofMiningandMetallurgy(AUSIMM)andisafull-timeemployeeofLitchfieldMinerals
Limited. Mr. Dow has sufficient sampling experience that is relevant to the style of mineralisation and types of deposits
underconsiderationandtotheactivitybeingundertakentoqualifyasaCompetentPersonasdefinedinthe2012Edition
of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). Mr.
Dow consents to the inclusion in the Public Report of the matters based on their information in the form and context in
which it appears. With regard to the Company’s ASX Announcements referenced in the above Announcement, the
Company is not aware of any new information or data that materially affects the information included in the
Announcements.
The announcement has been approved by the Board of Directors. For further information please contact:
Matthew Pustahya Managing Director
Matthew@litchfieldminerals.com.au
Follow us on:
www.litchfieldminerals.com.au
https://twitter.com/Litchfield_LMS
https://www.linkedin.com/company/litchfield-minerals-limited/
JORC Code, 2012 Edition – Table 1 report Section 1 Sampling Techniques and Data (Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling
(e.g. cut channels, random
chips, or specific specialised
industry standard
measurementtoolsappropriate
to the minerals under
investigation, such as down
hole gamma sondes, or
handheldXRFinstruments,etc).
These examples should not be
taken as limiting the broad
meaning of sampling.
• Include reference to measures
taken to ensure sample
representivity and the
appropriate calibration of any
measurement tools or systems
used.
• Aspects of the determination of
mineralisation that are
Material to the Public Report.
• In cases where ‘industry
standard’ work has been done
this would be relatively simple
(e.g. ‘reverse circulation drilling
wasusedtoobtain1msamples
from which 3 kg was pulverised
toproducea30gchargeforfire
assay’). In other cases more
explanation may be required,
such as where there is coarse
goldthathasinherentsampling
problems. Unusual
commodities or mineralisation
types (e.g. submarine nodules)
may warrant disclosure of
detailed information.
Drilling
• No new drilling results reported.
Silverado and VT01 IP Survey :
• The IP survey was completedby Planetary Geophysics using IRIS Fullwaver
IP receivers and a GDD Tx4 5 kVA IP transmitter.
• Silverado : A static pole-dipole configuration was used with afixedarray of
16 to 24 x 75m receiver dipoles along each line. The transmitter pole
station spacing was also 75m, offset 37.5m along the survey line from the
receiver electrodes (at the centre each receiver dipole). Six 1600m long
lines were completed at Silverado spaced 200m apart with two 600m
spaced lines extended a further 1,600m to the south-east. Lines were
oriented NW to SE.
• VT01 : A static pole-dipole configuration was used with a fixed array of 16
x 50m receiver dipoles along each line. The transmitter pole station
spacing was also 50m, offset 25m along the survey line from the receiver
electrodes (at the centre each receiver dipole). Two 1,000m long lines
were completed at VT01 spaced 200m apart. Lines were oriented NNW to
SSE.
• Thestaticarrayconfigurationusedforthesesurveysresultsinreadingboth
senses (C>P and C<P) of data. The transmitter coverage was extended by
two orthree stations at the endof each receiver array to obtain additional
depth of investigation over the main area of interest.
Drilling
techniques
• Drill type (e.g. core, reverse
circulation, open-hole hammer,
rotary air blast, auger, Bangka,
sonic, etc) and details (e.g. core
diameter, triple or standard
tube, depth of diamond tails,
face-sampling bit or other type,
• No new drilling results reported.
Criteria JORC Code explanation Commentary
whether core is oriented and if
so, by what method, etc).
Drill sample
recovery
• Method of recording and
assessing core and chip sample
recoveriesandresultsassessed.
• Measures taken to maximise
sample recovery and ensure
representative nature of the
samples.
• Whether a relationship exists
between sample recovery and
grade and whether sample bias
may have occurred due to
preferential loss/gain of
fine/coarse material.
• No new drilling results reported.
Logging • Whether core and chip samples
have been geologically and
geotechnically logged to a level
of detail to support appropriate
Mineral Resource estimation,
mining studies and
metallurgical studies.
• Whether logging is qualitative
or quantitative in nature. Core
(or costean, channel, etc)
photography.
• The total length and
percentage of the relevant
intersections logged.
• No new drilling results reported.
Sub-sampling
techniques and
sample
preparation
• If core, whether cut or sawn
and whether quarter, half or all
core taken.
• If non-core, whether riffled,
tube sampled, rotary split, etc
and whether sampled wet or
dry.
• Forallsampletypes,thenature,
quality and appropriateness of
the sample preparation
technique.
• Quality control procedures
adopted for all sub-sampling
stages to maximise
representivity of samples.
• Measures taken to ensure that
the sampling is representative
of the in situ material collected,
includingforinstanceresultsfor
field duplicate/second-half
sampling.
• No new drilling results reported.
• No sub-sampling completed.
Criteria JORC Code explanation Commentary
• Whether sample sizes are
appropriate to the grain size of
the material being sampled.
Quality of assay
data and
laboratory tests
• The nature, quality and
appropriateness of the
assaying and laboratory
procedures used and whether
the technique is considered
partial or total.
• For geophysical tools,
spectrometers, handheld XRF
instruments, etc, the
parameters used in
determining the analysis
including instrument make and
model, reading times,
calibrations factors applied and
their derivation, etc.
• Nature of quality control
procedures adopted (e.g.
standards, blanks, duplicates,
external laboratory checks) and
whether acceptable levels of
accuracy (i.e. lack of bias) and
precision have been
established.
• See survey configuration and system specifications above.
Verification of
sampling and
assaying
• The verification of significant
intersections by either
independent or alternative
company personnel.
• The use of twinned holes.
• Documentation of primary
data, data entry procedures,
data verification, data storage
(physical and electronic)
protocols.
• Discuss any adjustment to
assay data.
• Data detailed in this report has been reviewed and processed by Rob
Angus at Mitre Geophysics.
Location of data
points
• Accuracy and quality of surveys
used to locate drill holes (collar
and down-hole surveys),
trenches, mine workings and
other locations used in Mineral
Resource estimation.
• Specification of the grid system
used.
• Quality and adequacy of
topographic control.
• LinesweregriddedbyPlanetaryGeophysicsusingahandheldGarminGPS.
• Waypoints were recorded at every station using MGA2020/GDA Zone 53.
Data spacing and
distribution
• Data spacing for reporting of
Exploration Results.
• Whether the data spacing and
distribution is sufficient to
Silverado and VT01 IP Survey
• Silverado: Receiver dipoles were 75m long with 75m transmitter stations
offset 37.5m along the line. Six 1600m long lines were completed at
Criteria JORC Code explanation Commentary
establish the degree of
geological and grade continuity
appropriate for the Mineral
Resource and Ore Reserve
estimation procedure(s) and
classifications applied.
• Whether sample compositing
has been applied.
Silverado spaced 200m apart with two 600m spaced lines extended a
further 1600m to the south-east. Lines were oriented NW to SE.
• VT01:Receiverdipoleswere50mlongwith50mtransmitterstationsoffset
25malongtheline.Two1000mlonglineswerecompletedat VT01spaced
200m apart. Lines were oriented NNW to SSE.
Orientation of
datainrelationto
geological
structure
• Whether the orientation of
sampling achieves unbiased
sampling of possible structures
and the extent to which this is
known, considering the deposit
type.
• If the relationship between the
drilling orientation and the
orientation of key mineralised
structures is considered to have
introducedasamplingbias,this
should be assessed and
reported if material.
• IP lines were completed perpendicular to dominant stratigraphic strike
direction as interpreted from RTP 1VD magnetic data and air photo
interpretation.
• No bias is expected.
Sample security • The measures taken to ensure
sample security.
• All IP data was collected under strict data security measures by Planetary
Geophysics Pty Ltd.
Audits or reviews • The results of any audits or
reviews of sampling techniques
and data.
Silverado and VT01 IP Survey
• Raw data was checked and supplied at the end of each survey line by
Planetary Geophysics.
• Data was subsequently reviewed, processed, and modelled by
independent geophysical consultant Mitre Geophysics.
• No other audits or reviews have been undertaken.
JORC Code, 2012 Edition – Table 1 reportSection 2: Reporting of Exploration Results (Criteria listed in the preceding section also apply to this
section.)
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number,
location and ownership including
agreements or material issues with
third parties such as joint ventures,
partnerships, overriding royalties,
nativetitleinterests,historical sites,
wilderness or national park and
environmental settings.
• The security of the tenure held at
thetimeofreportingalongwithany
known impediments to obtaining a
licence to operate in the area.
• Tenement includes Oonagalabi (EL32279) for a total of 145.3km2 and 46
sub-blocks.
• EL32279 is owned by Kalk Exploration Pty. Ltd., a 100% owned entity of
Litchfield Minerals Limited. The tenement is located approximately
125km northeast of Alice Springs on pastoral leases.
• Thetenement is in goodstandingand therearenoknownimpediments.
Exploration done
by other parties
• Acknowledgment and appraisal of
exploration by other parties.
• A summary of previous EL32279 exploration and mining is presented
below:
• Oonagalabi was discovered in the 1930’s.
• In 1970, Russgar Minerals completed regional mag-rad survey, VLF_EM
survey, ground magnetic survey, single line resistivity traverse and 14
drillholes.
• In 1971, Geopeko completed limited IP.
• 1979, Amoco completed photo-interpretation, rock chip sampling and
drilling (8 holes).
• 1981 D’Dor Mining NL completed limited dipole-dipole IP.
• Between1990–1996onEL6940ClarenceRiverFinanceGroupexplored
for garnet in the Florence and Maud Creeks, collecting 15 samples that
averaged 4.4% garnet.
• Between 1997 – 2000 on EL 9420 Clarence River Finance Group
completed garnet exploration north of Oonagalabi EL32279. In 2007,
ML 22624 was applied for to cover the central Oonagalabi deposit and
surroundingproximalalluvialsystems(outside2025bulksamplingarea).
No work was completed and the ML was relinquished in 2019.
• Silex 2009 completed pole-dipole IP 1 x diamond hole.
Geology • Deposit type,geologicalsettingand
style of mineralisation.
• The Oonagalabi-type mineralisation is considered to be either skarn-
related, sediment-hosted or carbonate replacement with potential for
high-grade remobilised breccia zones similar to the Jervois deposit.
EL32279 falls within one of Geoscience Australia’s IOCG high potential
zones.
• The project lies within the Harts Range that represents a package of
multiply deformed and metamorphosed sedimentary and igneous
intrusive rock.
Drill hole
Information
• A summary of all information
material to the understanding of
the exploration results including a
tabulation of the following
information for all Material drill
holes:
• No new drilling results reported.
• See Figures 1- 3 for spatial distribution of IP lines.
Criteria JORC Code explanation Commentary
o easting and northing of
the drill hole collar
o elevation or RL (Reduced
Level – elevation above
sealevel inmetres)ofthe
drill hole collar
o dip and azimuth of the
hole
o down hole length and
interception depth
o hole length.
• Iftheexclusionofthisinformationis
justified on the basis that the
information is not Material andthis
exclusion does not detract from the
understanding of the report, the
Competent Person should clearly
explain why this is the case.
Dataaggregation
methods
• In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (e.g. cutting of high
grades) and cut-off grades are
usually Material and should be
stated.
• Where aggregate intercepts
incorporate short lengths of high
grade results and longer lengths of
low grade results, the procedure
used for such aggregation should
be stated and some typical
examples of such aggregations
should be shown in detail.
• The assumptions used for any
reporting of metal equivalent
values should be clearly stated.
• No new drilling results reported.
Relationship
between
mineralisation
widths and
intercept lengths
• These relationships are particularly
important in the reporting of
Exploration Results.
• If the geometry of the
mineralisation with respect to the
drill hole angle is known, its nature
should be reported.
• If it is not known and only the down
hole lengths are reported, there
should be a clear statement to this
effect (e.g. ‘down hole length, true
width not known’).
• No new drilling data reported.
Diagrams • Appropriate maps and sections
(with scales) and tabulations of
intercepts should be included for
any significant discovery being
• See figures within the main body of the announcement.
Criteria JORC Code explanation Commentary
reported These should include, but
not be limited to a plan view of drill
hole collar locations and
appropriate sectional views.
Balanced
reporting
• Where comprehensive reporting of
all Exploration Results is not
practicable, representative
reporting of both low and high
grades and/or widths should be
practiced to avoid misleading
reporting of Exploration Results.
• All available relevant information is presented.
Othersubstantive
exploration data
• Other exploration data, if
meaningful and material, should be
reported including (but not limited
to): geological observations;
geophysical survey results;
geochemical survey results; bulk
samples – size and method of
treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock
characteristics; potential
deleterious or contaminating
substances.
• See the main body of this report for all pertinent observations and
interpretations.
Further work • The nature and scale of planned
further work (e.g. tests for lateral
extensions or depth extensions or
large-scale step-out drilling).
• Diagrams clearly highlighting the
areas of possible extensions,
including the main geological
interpretations and future drilling
areas, provided this information is
not commercially sensitive.
Future planned exploration includes:
• Completion of Phase 3 Pole-Dipole IP Survey at VT1.
• Diamond / RC drillholes at Bomb Diggity and Oonagalabi Main Zone.
Share your feedback
Discover