Highlights
• Tenement-wide Versatile Time-domain Electromagnetic (VTEMTM
Max) survey complete
withthe collection of 2,254 line kilometres ofdata
• The survey has defined 5 strong late-time high priority VTEM conductors, including four
targetsuntestedbyprevious exploration
• Priority VTEM targets display conductive responses typically associated with semi-
massive ormassive sulphide accumulation
Litchfield Minerals Limited (“Litchfield” or the “Company”) (ASX:LMS), a company with a
strategic emphasis on critical minerals, is pleased to announce the completion of a tenement-
wide VTEMsurvey at the Mt Doreenproject.
ManagingDirectorandCEO,MatthewPustahya,commented:
"WeareabsolutelythrilledbythepreliminaryresultsoftheVTEMsurveyatourMtDoreenproject.
Thefactthatwe’veidentifiedfivehigh-priorityconductivetargets,mostofwhichhaveneverbeen
tested before, represents a groundbreaking opportunity for Litchfield Minerals and could
significantly accelerate our path to a major discovery. VTEM technology is specifically designed
to detect massive sulphide accumulations and these conductive responses are exactly what
we hoped to uncover. That is, potential zones of semi-massive or massive sulphide
accumulation thatmay host copper, lead, zinc andsilvermineralisation.
Thesurvey’sabilitytopenetrate shallowsedimentary coverandpinpointtargetsthatare aligned
withkeystructuralandgeologicalcontactssetsusupforwhatcouldbeatransformationalphase
inourexplorationefforts. Giventhatthesehigh-priorityanomaliesarelocatedsoclosetoknown
mineralisation zones, we are optimistic that we’ve tapped into something significant here. The
opportunity to now advance these targets into ground-based follow-up surveys and eventually
drilling is an incredibly exciting next step. We look forward to providing further updates as we
continue tounlockthe immense potentialof MtDoreen."
In September 2024, as part of Litchfield Minerals Limited commitment to using cutting-edge
technology, UTS Geophysics collected 2,254 line kilometres (200m line-spacing) of Versatile
Time domain Electromagnetic Data (VTEM™ Max) over the Mt Doreen project, Northern Territory.
TheVTEMsystemissensitivetochangesinsubsurfaceconductivityandisincreasinglybecoming
an effective exploration first-pass screening tool for detecting shallow conductive sources such
as accumulations of sulphides. Airborne EM surveys were instrumental in discovering the Mt
Hardybasemetalsulphidedeposit,located35kmeastoftheMtDoreentenement(2.6Mt@6.7%
Zn, 0.9% Cu, 1.5% Pb, 35g/t Ag1
).
Figure 1. Mt Doreenproject RTP_SunN_Lin magnetic image showing thelocation of fivehigh-
priority VTEMtargets.
1
ToddRiverResources,2019.CorrectiontoMaidenHendrixResource Announcement. ASXNewsRelease 12 July 2019.
Geophysical consultant, Mitre Geophysics (Rob Angus) has completed a preliminary
assessmentoftherawfielddatafromtheVTEMsurvey. ThedatarevealedatotaloffiftyfiveVTEM
conductive targets, which were ranked according to various characteristics (Figure 1). Of these
fifty five targets, five high-priority targets were defined as strong late-time anomalies and fifty
definedasmediumpriority mid-tolate-timeconductive anomalies. Lowpriorityconductorsare
likely related to lithological features and very low priority conductors are related to cultural
effects (fences, watertanks,gaspipeline). Allfive high-priority targetsare located within 1km of
knownzonesofbasemetalmineralisation(excludingtarget4),arecurrentlyuntestedbyprevious
surface geochemistry and drilling (except for target 1 at Silver King which has prior drilling) and
hencerepresentcompellingnewexplorationtargets. Finalanomalyidentificationandmodelling
will be completed upon receipt ofthe fully processeddataset withinthe nextmonth.
Allprioritytargetsarepositionednearwell-definedgeologicalstructuresandcontactsidentified
during the lithostructural interpretation, which was announced to the market on August 28th,
aheadoftheVTEMsurvey'scompletion(Figure2).Almostallhighandmediumprioritytargetsare
located within areas of shallow sedimentary cover (<10m) and do not have any surface
expression, which explains whytheywere undetectedby historicexploration.
Figure2. PGNGeosciencelithostructuralinterpretationannouncedthe28th
August, showingthe
locationof VTEMtargets relative to knownprospects.
Next Steps
Litchfield is extremely confident about the preliminary results of the VTEM survey, which have
generated multiple high-priority targets for exploration. However, it is important to note that
these results are subject to change as the final fully processed data, expected within the next
month, willbetterdefine the conductive anomalies.Following this,aground-basedmoving loop
EM ("MLEM") survey will be conducted to define conductor plates and further refine target
prioritisation ahead of drilling thisyear.
Cautionary Statement
Conductivetargetspresentedinthisannouncementarepreliminaryinnatureandwereidentified
usingrawfielddata. Additionalmodellingisrequiredon thefinalprocesseddatasettopresenta
formal list of priority targets and to provide a higher confidence assessment of the source of
conductive responses.
Forwardlookingstatement
This announcement may include forward-looking statements, which are subject to risks and
uncertainties. Actual results could differ significantly due to factors beyond LMS’s control,
including market conditions and industry-specific risks. These forward-looking statements are
basedontheCompany’sexpectationsandbeliefsconcerningfutureevents Nowarrantyisgiven
regardingthe completenessoftheinformation provided.Please avoidplacingunduerelianceon
forward-looking statements, astheyreflectviewsonly as of the announcementdate.
About LitchfieldMinerals
LitchfieldMineralsisacriticalmineralexplorer,primarily searching for basemetals anduranium
out of the Northern Territory of Australia. Our mission is to be a pioneering copper exploration
company committed to delivering cost-effective, innovative and sustainable exploration
solutions. We aim to unlock the full potential of copper and other mineral resources while
minimisingenvironmentalimpact,ensuringthelongevity andaffordabilityofthisessentialmetal
for future generations. We are dedicated to involving cutting-edge technology, responsible
practices and stakeholder collaboration drives us to continuously redefine the industry
standardsanddelivervalue to our investors, communitiesandtheworld.”
The announcementhasbeen approvedby the Board of Directors.
For further information please contact:
Matthew Pustahya
Matthew@litchfieldminerals.com.au
Followus on:
www.litchfieldminerals.com.au
https://twitter.com/Litchfield_LMS
https://www.linkedin.com/company/litchfield-minerals-limited/
CompetentPerson’s Statement
The information in this Presentation that relates to Exploration Results is based on, and fairly
represents, information and supporting documentation compiled by Mr Russell Dow (MSc,
BScHons Geology), a Competent Person who is a Member of the Australian Institute of Mining
and Metallurgy (AUSIMM) and is a full-time employee of Litchfield Minerals Limited. Mr Dow has
sufficient experience that is relevant to the style of mineralisation and types of deposits under
consideration and to the activity being undertaken to qualify as a Competent Person as defined
in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral
ResourcesandOreReserves”(JORCCode). MrDowconsentstotheinclusioninthereportofthe
matters based on his information in the form and context in which it appears. Withregard to the
Company’s ASX Announcements referenced in the above Announcement, the Company is not
aware of any new information or data that materially affects the information included in the
Announcements.
Edition – Table 1report
JORCCode,2012Edition– Table 1report
Section 1Sampling TechniquesandData
(Criteriainthis section apply toall succeeding sections.)
Criteria JORCCodeexplanation Commentary
Sampling
techniques
• Natureandqualityofsampling (eg cutchannels,randomchips,or
specific specialised industry standard measurement tools
appropriatetothemineralsunderinvestigation,suchasdownhole
gamma sondes, or handheld XRF instruments, etc). These
examples should not be taken as limiting the broad meaning of
sampling.
• Include reference to measures taken to ensure sample
representivityandtheappropriatecalibrationofanymeasurement
toolsor systemsused.
• Aspectsof thedeterminationofmineralisation thatareMaterialto
thePublicReport.
• Incaseswhere‘industry standard’workhasbeendonethiswould
be relatively simple (eg ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was pulverised to produce a
30 g charge for fire assay’). In other cases more explanation may
be required, such as where there is coarse gold that has inherent
samplingproblems.Unusualcommoditiesormineralisationtypes
(eg submarine nodules) may warrant disclosure of detailed
information.
The instruments and parameters used for the VTEM survey are as follow:
• The VTEM survey was flown by UTS Geophysics Pty. Ltd.
• Heliborne electromagnetic data was acquired with VTEMTM Max
transmitter frequency of 25Hz, loop diameter 35m and mean
terrain clearance height of 35m.
• Line spacing was 200m across the full survey area.
Drilling
techniques
• Drill type (eg core, reverse circulation, open-hole hammer, rotary
air blast, auger, Bangka, sonic, etc) and details (eg core diameter,
• Not applicable asnodrilling isreported.
Criteria JORCCodeexplanation Commentary
triple or standard tube, depth of diamond tails, face-sampling bit
or other type, whether core is oriented and if so, by what method,
etc).
Drill sample
recovery
• Method of recording and assessing core and chip sample
recoveries and results assessed.
• Measures taken to maximise sample recovery and ensure
representativenatureof the samples.
• Whetherarelationshipexistsbetweensamplerecoveryandgrade
and whether sample bias may have occurred due to preferential
loss/gain offine/coarsematerial.
• Not applicable asnodrilling isreported.
Logging • Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in nature. Core (or
costean,channel,etc)photography.
• The total length and percentage of the relevant intersections
logged.
• Not applicable asnodrilling isreported.
Sub-
sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter, half or all core
taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of
thesamplepreparation technique.
• Qualitycontrolproceduresadoptedforallsub-sampling stagesto
maximiserepresentivity of samples.
• Measures taken to ensure that the sampling is representative of
• Not applicable asnodrilling isreported.
Criteria JORCCodeexplanation Commentary
theinsitumaterialcollected,includingforinstanceresultsforfield
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the
materialbeingsampled.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
consideredpartialor total.
• For geophysical tools,spectrometers,handheld XRF instruments,
etc, the parameters used in determining the analysis including
instrument make and model, reading times, calibrations factors
appliedandtheirderivation,etc.
• Nature of quality control procedures adopted (eg standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (ie lack of bias) and precision have
beenestablished.
• Transmitter loop diameter: 35m
• Peak dipole moment – 700,000 NIA
• Transmitter Pulse Width – 7ms
• VTEM Max Receiver – Z,X, coils (Y optional)
Verification
of sampling
andassaying
• The verification of significant intersections by either independent
or alternativecompany personnel.
• Theuse oftwinned holes.
• Documentation of primary data, data entry procedures, data
verification,datastorage(physical andelectronic)protocols.
• Discussanyadjustmentto assay data.
• Datadetailedinthisreporthasbeenreviewedandprocessed
by Mitre Geophysics.
Location of
datapoints
• Accuracy and quality of surveys used to locate drill holes (collar
and down-hole surveys), trenches, mine workings and other
locationsused inMineralResource estimation.
• Specificationof thegridsystem used.
• Quality andadequacy of topographiccontrol.
• The navigation system used was a UTS PC104 based navigation
system utilizing a NovAtel WAAS (Wide Area Augmentation
System) enabled GPS receiver, UTS navigate software, a full
screen display with controls in front of the pilot to direct the flight
and a NovAtel GPS antenna mounted on the helicopter tail. As
many as 11 GPS and two WAAS satellites may be monitored at
any one time. The positional accuracy or circular error probability
Criteria JORCCodeexplanation Commentary
(CEP) is 1.8m, with WAAS active, it is 1.0m. The co-ordinates of
the block were set-up prior to the survey and the information was
fed into the airborne navigation system.
• Altitude control used the FreeFlight Systems TRA-3000 radar
altimeter with altitude range (40 to 2500ft), altitude accuracy (40
to 100 ft. ±5 ft., 100 to 500 ft. ±5%, 500 to 2500 ft. ±7%) and
sample rate of 10Hz.
Data spacing
and
distribution
• Dataspacingforreporting of Exploration Results.
• Whetherthedataspacinganddistributionissufficienttoestablish
the degree of geological and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation procedure(s) and
classificationsapplied.
• Whethersample compositing hasbeen applied.
• The full survey was flown at 200m line-spacing.
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sampling achieves unbiased sampling
of possible structures and the extent to which this is known,
consideringthedeposittype.
• If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introducedasamplingbias,thisshouldbeassessedandreported
if material.
• Flight lines were orientated north-south to run perpendicular
to mostof the structuresandgeology of the area.
Sample
security
• Themeasurestakento ensuresamplesecurity. • All data was collected under strict security measure by UTS
Geophysics Pty Ltd.
Audits or
reviews
• The results of any audits or reviews of sampling techniques and
data.
• Data checks and processing reviews were undertaken daily
andat the completion of the programby the contractor.
• Review of the data was undertaken by an independent
Criteria JORCCodeexplanation Commentary
consultantMitreGeophysics.
Section 2Reporting of Exploration Results
(Criterialisted intheprecedingsection alsoapply to thissection.)
Criteria JORCCodeexplanation Commentary
Mineral
tenement
and land
tenurestatus
• Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
• The security of the tenure held at the time of reporting along with
any known impediments to obtaining a licence to operate in the
area.
• Refer to Section 4 in Independent Geologists Report (IGR) by
Ross et al., 2023 for further detail. In summary, the Mount
Doreen project is secured by EL 31305 for total of
approximately 388.35square kilometres.
• All tenements within the Mt Doreen are 100% owned by
Litchfield MineralsLtd.
• The Mt Doreen Project is located 325km northwest of Alice
Springs pastoral lease. The tenements are in good standing
andthere arenoknownimpediments.
Exploration
done by
other parties
• Acknowledgmentand appraisalof exploration by otherparties. • Refer to Section 6 and 7 in Independent Geologists Report
(IGR) by Ross et al,, 2023 for further detail. A summary of
previous exploration andmining ispresentedbelow:
• 1930-1956: Minoramountsofcopperandtungstenextracted
from SilverKing, Clark, MountIrene and Wolfram Hill.
• 1969: NT Mines & Water Resources diamond drilling at Clark
workings.
• 1987 – 2006: White Industries/Mareeba Mining, Bruce and
Mules, MIM Exploration/Roebuck Resources, Track Minerals,
Criteria JORCCodeexplanation Commentary
PoseidonGold/YuendumuMining,BHP,HomestakeGold,Rio
Tinto Exploration and Tanami Gold completed geological
mapping, geochemical sampling, airborne and ground
geophysicalsurveys,anddrilling programs.
Geology • Deposittype, geologicalsetting andstyle of mineralisation. • Refer to Section 5 in Independent Geologists Report (IGR) by
Ross et al., 2023 for further detail. Insummary:
• Mount Doreen is located in the southern portion of the
Paleoproterozoic AileronProvince of the AruntaRegion.
• The oldest rocks at Mount Doreen are the multiply deformed
and metamorphosed siliciclastic sediments of the Lander
Rock Formation. The younger volcano sedimentary
Patmungala Beds lie in the south of the tenement, and both
are intruded by the Yarunganyi Granite. Numerous major
faultsstrikeclosetoeast-westandoftencontainveinsorvein
swarms of quartz, forming ridges. Neoproterozoic to
Palaeozoic sedimentary rocks of the Ngalia Basin overlie the
Aileronbasementinthesouthwestofthetenementand along
the southernboundary.
• Mineralisation is considered to be epigenetic intrusion-
related breccia and vein mineralisation with polymetallic
copper-lead-zinc-silver-molybdenite and tungsten.
Mineralisation is interpreted to be from varied sources and
associations as evidenced from mineralisation dating.
Criteria JORCCodeexplanation Commentary
• The most prominent mineralisation is supergene copper at
Silver King with varying lead-zinc-silver in quartz veins and
shear zones.
Drill hole
Information
• A summary of all information material to the understanding of the
exploration results including a tabulation of the following
informationfor allMaterial drillholes:
o eastingandnorthing of the drillholecollar
o elevation or RL (Reduced Level – elevation above sea level in
metres)of thedrillholecollar
o dipand azimuthof thehole
o downholelengthand interceptiondepth
o holelength.
• If the exclusion of this information is justified on the basis that the
informationisnotMaterialandthisexclusiondoesnotdetractfrom
the understanding of the report, the Competent Person should
clearly explain whythis isthecase.
• Nodrilling or assaying isreported in thisreport.
Data
aggregation
methods
• In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material and should be
stated.
• Whereaggregateinterceptsincorporateshortlengthsofhighgrade
resultsandlongerlengthsoflowgraderesults,theprocedureused
for such aggregation should be stated and some typical examples
• Nodrilling or assaying isreported in thisreport.
Criteria JORCCodeexplanation Commentary
of such aggregationsshould be shown indetail.
• Theassumptionsusedforanyreportingofmetalequivalentvalues
shouldbeclearlystated.
Relationship
between
mineralisatio
n widths and
intercept
lengths
• These relationships are particularly important in the reporting of
ExplorationResults.
• If the geometry of the mineralisation with respect to the drill hole
angle is known, its natureshouldbereported.
• Ifitisnotknownandonlythedownholelengthsarereported,there
should be a clear statement to this effect (eg ‘down hole length,
true width not known’).
• Nodrilling or assaying isreported in thisreport.
Diagrams • Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported Theseshould include,but not be limited to a plan view of
drillholecollarlocationsandappropriatesectionalviews.
• Project location map and plan map of the drill hole locations
withrespect to eachother andwithrespecttoother available
data are included inthetext.
• Drill hole locations have been determined with hand-held
GPSdrillholecollarlocation(GarminGPS78s)+/-5minX/Y/Z
dimensions.
• RefertoSection6and7oftheIndependentGeologistsReport
(IGR)by Ross et al., 2023.
Balanced
reporting
• Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/orwidthsshouldbepracticedtoavoidmisleadingreportingof
ExplorationResults.
• Individual gravity readings have not been reported, plans
withinthis report providean adequate overview of the ground
gravity data.
Other
substantive
• Other exploration data, if meaningful and material, should be
reported including (but not limited to): geological observations;
geophysical survey results; geochemical survey results; bulk
samples–sizeandmethodoftreatment;metallurgicaltestresults;
• See the main body of thisreport for all pertinent observations
andinterpretations.
Criteria JORCCodeexplanation Commentary
exploration
data
bulk density, groundwater, geotechnical and rock characteristics;
potentialdeleteriousor contaminating substances.
Further work • The nature and scale of planned further work (eg tests for lateral
extensions ordepth extensions or large-scalestep-outdrilling).
• Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling
areas,providedthisinformation is not commercially sensitive.
Future planned exploration includes:
• Finalfully processedVTEM andinterpretation
• Ground-based moving loop EM (“MLEM”)
• Geological mapping andgeochemical surveys/ sampling
• RAB/RC/DDdrill testing.