Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
28 January2026
Litchfield MineralsLimited (ASX: LMS)
Quarterly Activities Report – December 2025 Quarter
For the period 1 October 2025 to31 December 2025
Executive Summary
During the December 2025 Quarter, Litchfield materially advanced the Oonagalabi Project through
a systematic program of mapping, RC drilling, downhole EM (DHEM), VTEM-driven targeting, IP
surveying and ground EM mobilisation. The Company also strengthened its balance sheet via a $6.0
million placement, providing the funding required to accelerate exploration and maintain strong
momentum across priority targets.
Key outcomes for thequarter included:
• Confirming the mineralised Oonagalabi Formation extends across a materially larger
strike footprint than previously mapped, including linkage between key prospects.
• Delivering further strong RC drilling outcomes at the Oonagalabi Main Zone including:
o 91m @ 0.9% Cu & 1.3% Zn Hole 10
o 90m @ 0.6% Cu & 1.8% Zn Hole 14
• Semi-massive to massive sulphides hit at VT1.
• Progressing VT1 and VT2 conductor targeting through drilling and DHEM refinement,
supported by my view that thesystem is building toward a larger intrusion-related sulphide
architecture.
• Completing the first phase of IP surveying across VT2 and the NE Oonagalabi trend
through to Bomb-Diggity, generating multiple priority targets for follow-up.
• Mobilising and commencing ground EM/FLEM, aimed at sharpening VT1 drill vectors.
Exploration Activities
1) Oonagalabi Project, Northern Territory
1.1 Regional mapping and formation-scale growth
Earlyinthequarter, wereportedmappingresultsthatconfirmedcontinuousoutcropofthemineralised
Oonagalabi Formation between key areas (including Silverado through to Bomb-Diggity). In addition,
further mineralised zones were identified that materially expanded my interpretation of the broader
systemfootprint and strikepotential (Figure 1).
ThisworkreinforcedtheCompany’sviewthatsignificantportionsofthemineralisedformationhavenot
yet been drill tested, and that additional geophysics (including IP) will play a central role in defining
subsurfacecontinuity along strike and down-dip.
Newly identified zones between Silverado and Oonagalabi are strongly mineralised with pXRF results
of rock chips including up to 21.5% Cu, 2.47% Zn, 25g/t Ag.1
1.2 Oonagalabi Main Zone – RC drilling – Hole 10 & 14
OGRC10 recorded more than 100 metres of disseminated copper-zinc mineralisation in based on
logging and field readings, demonstrating thescale and continuity emerging from the program.
1
ASX Announcement 2nd October 2025;Oonagalabi Formation Extensions Found &Mapped System Open NE–
SW.
In November, the Company released certified laboratory assays from OGRC010 confirming multiple
thick mineralised intervals from near surface, with best intercept of 91m @ 0.9% Cu & 1.3% Zn
mineralisation (Figure 2).2
Figure 2 - Image showing dominantly finely disseminated and minor semi-massive Cu-Zn mineralisation within strong,
pervasive calc-silicate alteration (olivine, pyroxene, amphibole, relict marble), 149-150m, OGRC010. Visual estimates ~7%
chalcopyrite(2.3%Copper)and~4%Sphalerite(2.7%Zinc).Note:Visualestimatesofmineralabundanceresultsshouldnever
be considered a proxy or substitute for laboratory analyses where concentrations of grades are the factors of principal
economic interest. Visual estimates also potentially provide no information regarding impurities or deleterious physical
properties relevantto valuation
ThisresultreinforcedtheCompany’spositionthattheMainZonerepresentsalarge,continuouscopper-
zinc system hosted within altered Oonagalabi Formation stratigraphy (Figure 3).
2
ASX Announcement 17th November 2025: 91m@ 0.9%Cu and 1.3%ZnConfirmedat Oonagalabi, Reinforcing
Large-ScaleCu–Zn System
Figure3–Hole 10drilledintoahighchargeablezoneattheOonagalabiMainzone,markedbylowconductivity,andasubdued
magnetic signature.
Step-out expansion hole, OGRC014, expanded the Main Zone footprint. In December, the company
reported that OGRC014 delivered the widest mineralised intercept drilled at Oonagalabi to date,
intersecting 148 metres of mineralised Oonagalabi Formation and confirming strike continuity via a
step-outfrom OGRC010 with a best interval of 90m @ 0.6% Cu& 1.8% Zn (Figure 4).3
3
ASX ANNOUNCEMENT – 10 December 2025: 148m Copperinterceptexpands Oonagalabi Main Zone Well-
funded toaggressively testintrusive targets in 2026.
Figure4–Simpleview ofgeology with cross section ofOCRG0014.
1.3 VT2 – DHEM confirmsa larger conductive body and strengthens targeting confidence
In October, the Company intersected 168m of sporadic sulphides in drillhole OGRC011 at the VT2
conductor, including intervals containing semi-massive to massive sulphides, validating the
significance of VTEM conductor targeting within the evolving Oonagalabi system architecture (Figure
5).4
4
ASX Announcement 17th October2025:Disseminatedto massive sulphides intersectedin Oonagalabi VT2
target, extending strike length.
Figure 5 - Semi-massive to massive sulphides from OGRC011 (249m), estimates comprising 4% pyrrhotite, 4% chalcopyrite
and 3% sphalerite. Visual estimate Note: Visual estimates of mineral abundance results should never be considered a proxy
or substitute for laboratory analyses where concentrations of grades are the factors of principal economic interest. Visual
estimates also potentially provide no information regarding impurities ordeleterious physical properties relevantto valuation
Following this initial success, Litchfield moved rapidly to complete Downhole Electromagnetic (DHEM)
modelling, which confirmed that OGRC011 successfully clipped the lower edge of the VT2 interpreted
massive sulphide conductor (Figure 6).5
The DHEM results indicated the main conductive core lies
immediately up-dip (southeast) of OGRC011, with the most conductive and thicker portion of the body
remaining untested.
Importantly,modellingsuggeststheVT2conductorextendsatleast120mindepthandmorethan400m
along strike, with DHEM unable to define the full limits of the system due to the size and strength of the
5
ASX ANNOUNCEMENT – 28th October 2025: DHEMconfirmslarge conductivebody atVT2.
conductor. These results strongly supported a structurally controlled, high-conductance, laterally
extensivesulphidesystem,consistent with large-scale copper-zinc mineralisation across Oonagalabi.
Based on the upgraded conductor model, the Company has drilled a follow-up drillhole approximately
35mup-dipfromOGRC011todirectlytesttheinterpretedcoreofthemassivesulphidezone. Inparallel,
IP andgroundEMsurveyswerescheduledto furtherrefine VT2targeting andoptimisefollow-up drilling
vectors across the broadercorridor.
Figure 6 - 3D view looking southwest illustrating RC drillhole OGRC011 at the VT2 conductor alongside modelled plates from
the downhole EM survey. OGRC011 intersected the 50 S plate at approximately 200 m and clipped the base of the 80 S plate
ataround250mdownhole,wheresemi-massivetomassivesulphides(pyrrhotite–chalcopyrite–sphalerite)wereencountered.
Modelling suggests OGRC011 passed beneath the stronger 300 S and 800 S plates near 250 m depth, and a new drillhole has
been designed to target these high-conductance zones.
1.4 VT1 – drilling intersectssulphides; DHEM + ground EM/FLEM to tighten vectors5
In October, Litchfield reported that drilling at VT1 intersected a broad alteration envelope with
disseminated sulphides, confirming the system is mineralised and supporting the priority of the VT1
conductor corridor.6
The hole was also designed to enable Downhole Electromagnetic (DHEM)
surveying to better constrain conductor geometry and refine drill vectors for follow-up targeting.
InNovember,theCompanyprovidedatechnicalupdateconfirmingthatDHEMmodellingdemonstrated
OGRC012missedthemainconductivebody,butimportantlydeliveredcriticalvectoringinformationby
accurately defining the position of one of the conductors and demonstrating the system is larger,
stronger, and morecomplex than initially interpreted from the airborne VTEM model (Figure 7).7
6
ASX Announcement 23rd October2025:Sulphides intersected at VT1, DHEM torefine target locations.
7
ASX ANNOUNCEMENT – 4th November2025: VT1Emerging asa Strong Multi-Plate Conductor,GroundEM
Survey toCommence Mid-November.
Figure 7 - Illustrates the drill hole intersecting one of the originally modelled VTEM plates, with DHEM data refining the
interpretation and showing the actual positions ofthe nearest conductive plates.
DHEM results indicated a significantly higher conductor strength than first modelled (~995 Siemens vs
~700 Siemens) and supported the interpretation of a multi-plate conductive corridor comprising six to
seven overlapping and potentially structurally offset plates within a ~400m folded zone, interpreted to
remain open to thesouthwest.
Given the strength of the response and the near-surface position of the conductors, Litchfield planned
apurpose-builthigh-resolutiongroundEMprogram,incorporatingtighterlinespacingandhigherstation
density to resolve overlapping conductors and deliver near-DHEM level surface resolution. This work
was scheduled to commence in the second half of November and was designed to produce drill-ready
targets immediately following interpretation.
1.5 Induced Polarisation program – first phase complete across VT2 and NE trend toward Bomb-
Diggity
In November, Litchfield completed the first phase of its Induced Polarisation (IP) program across VT2
and the Northeast Oonagalabi trend through to the Bomb-Diggity intrusion, comprising eight IP lines
(~1.5kmlong)designedtopenetratedeeperintothesystemandrefineourstructuralandmineralisation
models.8
The new IP results strongly supported the Company’s interpretation that the prospective mineralised
Oonagalabi Formation wraps around the nose of the broader Oonagalabi Anticline, linking the
Oonagalabi Main Zone through Bomb-Diggity and into VT2. This interpretation was reinforced by the
extension of the Main Zone chargeability anomaly by ~450m to the northeast, and the identification of
8
ASX ANNOUNCEMENT – 24th November2025: New IPData Highlights Multiple High-Priority Targets Across a
PotentiallyLarge Intrusive System.
two sub-parallel +500m-long chargeability trends immediately adjacent to the VT2 conductor (Figure
8).
At VT2, the IP response is consistent with expectations for a sulphide-rich system, with the survey
delineating large, coherent low-resistivity zones that persist to depth, indicating the potential for a
laterally and vertically extensive sulphide-bearing package. Importantly, the IP campaign also
highlightedzonesofmineralisationpotentialthatwerenotreadilyapparentinexistingmagnetics,VTEM
and DHEM datasets, supporting the Company’s view that VT2 represents a fully preserved, blind
mineralised systemwith meaningful potential upside scale.
This work forms part of Litchfield’s systematic, data-driven approach to prioritising follow-up drilling
across Oonagalabi, integrating VTEM plate modelling, drilling, DHEM, IP and planned ground EM to
progressivelytightenvectorsandconvertemerginganomaliesintodrill-readytargetsacrossthebroader
mineralised corridor.
Figure 8 - Pole-Dipole Induced Polarisation Chargeability 2D Inversion sections, looking southwest, showing the Oonagalabi
Main Zone on the right where it plunges deeply under the Bomb Diggity area in the nose of the Oonagalabi Anticline and then
wraps aroundto the eastern limbof the anticline at VT2 where it isopen to the northeast
1.6 Ongoing field execution update (late quarter)
Latein November, Litchfield provided an operational exploration update confirming ground EM
mobilisation, completion of afive-holedrilling program, and that further interpretation and
outstanding assay outcomeswould bereleased upon receipt.9
9
ASX ANNOUNCEMENT – 28th November2025: Exploration Update–Litchfield Minerals.
Corporate and Financial
Capital raising to accelerate exploration
In October, Litchfield completed a $6.0 million placement at $0.60 per share, supported by strong
demand from institutional and sophisticated investors.10
Proceeds were directed toward accelerating
exploration at Oonagalabi (including drilling and geophysics) and maintaining momentum across the
Company’s priority targets.
Planned Work Program (Next Quarter Outlook)
Based on theprogress achieved during theDecember 2025 Quarter, the Company’s near-term focus is
expected to include:
• Continued integration of Main Zone drilling results to support step-out planning and strike
extensions;
• Progression of VT2 targeting using the DHEM-upgraded conductor model, including follow-up
drilling to test the interpreted coreposition;
• Completion and interpretation of ground EM/FLEM over VT1, converting the multi-plate
corridor into sharper, drill-ready vectors; and
• Advancing priority targets generated by the VT2-to-Bomb-Diggity IP program, with follow-up
work directed toward the highest-confidence conductive/chargeable features and structural
corridors.
CORPORATE
Cash Position
At 31 December2025, theCompany held $6.1 million cash at bank (unaudited).
Capital Structure
• At31December2025,theCompanyhas63,750,058sharesonissue,ofwhich7,192,500shares
from theIPO areescrowed till 13/03/2026.
• Thereare7,000,000 performance rights on issue, of which 1,000,000 have vested.
• Thereare16,188,500 unlisted options on issue,
o 4,988,500, 10c Exp 31/08/2027.
o 2,500,000 Board and Management
10
ASX Announcement 20th October2025:$6.0 Million Raised,StrongDemand fromLeading ResourceFunds
and IndustryExperts.
▪ 1,250,000, 30c Exp 28/02/2028, of which 750,000 are escrowed until
13/03/2026.
▪ 1,250,000, 35c Exp 28/02/2028, of which 750,000 are escrowed until
13/03/2026.
o 6,700,000 Brokeroptions,
▪ 4,700,000, 30c Exp 31/08/2027, which are escrowed till 13/03/2026.
▪ 2,000,000, 90c Exp 27/10/2027
ASX Listing Rule 5.3.1 Disclosure
$0.955 million exploration spend during the quarter can be summarised as:
● $0.725 million related exploration activities on Oonagalabi, including $0.295 million in drilling;
● $0.165 million relating Mt Doreen, Lucy Creek and Silver City; and
● $0.065 million on general exploration activities.
ASX Listing Rule 5.3.2
The Company confirms that therewas no mine production and development activities for the Quarter.
ASX Listing Rule 5.3.4
The Company provides a comparison of its actual spend against the estimated expenditure on“use of
funds”items setout in theCompany’s Prospectus dated 24 January 2024.
ASX Listing Rule 5.3.5
$86,000 was paid during the quarter to Related Parties, as reported in clause 6 of the ASX Appendix 5B
(Cash Flow Report), comprised director fees.
TENEMENTINTERESTS
At31December2025,theCompanyhadinterestinthefollowingtenements(asrequiredbyListingRule
5.3.3). During this quarter, no additional tenement has been acquired nor any tenement removed from
the company’s portfolio.
Funds Allocated Actualto date
$'000 $'000
ExplorationDrilling 2,424 2,738
Geophysics,Mapping,Sample Analysis,Vehicles andTenement Cost 689 1,746
Operational Labour - Exploration 324 395
WorkingCapital andAdministration 1,563 1,357
Use of Funds
Country Location Project Tenement Status Current
Interest
(%)
Prior
Quarter
Interest
(%)
Australia Northern Territory Mount
Doreen
EL31305 Granted 100% 100%
Australia Northern Territory Lucy Creek EL33568 Granted 100% 100%
Australia Northern Territory Lucy Creek 2 EL33888 Granted 100% 100%
Australia Northern Territory Oonagalabi EL32279 Granted 100% 100%
Australia Northern Territory Paradise Well EL32190 Granted 100% 100%
Australia Northern Territory SilverValley EL32241 Granted 100% 100%
Australia Northern Territory Silver Valley
Extension
ELA 34246 Application 100% -
Australia Northern Territory Strange ways ELA 34240 Application 100% -
Australia Northern Territory HeartsRange1 ELA 34245 Application 100% -
Australia Northern Territory HeartsRange2 ELA 34250 Application 100% -
Australia Northern Territory HeartsRange3 ELA 34251 Application 100% -
Australia Northern Territory HeartsRange4 ELA 34255 Application 100% -
The announcement has been approved by the Board of Directors.
For furtherinformation please contact:
MatthewPustahya
Matthew@litchfieldminerals.com.au
Follow us on:
www.litchfieldminerals.com.au
https://twitter.com/Litchfield_LMS
https://www.linkedin.com/company/litchfield-minerals-limited/
Cautionary Statement
The information in this announcement relating to mineral exploration results, sampling, geophysical
data, drilling results, and Exploration Targets is preliminary and conceptual in nature. Interpretations,
estimates,andconclusionsarebasedoncurrentdataandgeologicalunderstanding,whichmaychange
as additional information becomes available. There is no certainty that further exploration will lead to
the identification of a mineral deposit or to any commercial development.
All statements, other than statements of historical fact, included in this announcement — including
statementsregardingfutureexplorationactivities,targets,andcompanystrategy—areforward-looking
statements. These forward-looking statements involve known and unknown risks, uncertainties, and
other factors that may cause actual results, performance, or achievements to differ materially from
those anticipated. Such factors may include changes in exploration results, project priorities,
regulatory conditions and other risks inherent to mineral exploration.
Readers are cautioned not to place undue reliance on forward-looking statements or Exploration
Targets. The Company is under no obligation to update any forward-looking statements or information
in this announcement, except as required by applicable laws or the ASX Listing Rules.
All technical information contained in this release is based on information compiled by qualified and
competent professionals as defined under the JORC Code (2012 Edition).
Forward looking statement
This announcement may include forward-looking statements, which are subject to risks and
uncertainties. Actual results could differ significantly due to factors beyond our control, including
market conditions and industry-specific risks. These forward-looking statements are based on the
Company’s expectations and beliefs concerning future events. No warranty is given regarding the
completeness of the information provided. Please avoid placing undue reliance on forward-looking
statements, as they reflect views only as of the announcement date.
About Litchfield Minerals
Litchfield Minerals is a critical mineral explorer, primarily searching for base metals and uranium out of
the Northern Territory of Australia. Our mission is to be a pioneering copper exploration company
committed to delivering cost-effective, innovative and sustainable exploration solutions. We aim to
unlockthefullpotentialofcopperandothermineralresourceswhileminimisingenvironmentalimpact,
ensuring thelongevity andaffordabilityof thisessentialmetalfor future generations. Wearededicated
to involving cutting-edge technology, responsible practices and stakeholder collaboration drives us to
continuously redefine the industry standards and deliver value to our investors, communities and the
world.
For furtherinformation please contact:
MatthewPustahya
Matthew@litchfieldminerals.com.au
Follow us on:
www.litchfieldminerals.com.au
https://twitter.com/Litchfield_LMS
https://www.linkedin.com/company/litchfield-minerals-limited/
Competent Person’s Statement
TheinformationinthisPresentationthatrelatestoExplorationResultsisbasedon,andfairlyrepresents,
information and supporting documentation compiled by Mr Russell Dow (MSc, BScHons Geology), a
Competent Person who is a Member of the Australian Institute of Mining and Metallurgy (AUSIMM) and
is a full-time employeeof Litchfield Minerals Limited. Mr Dow has sufficient experience that is relevant
to the style of mineralisation and types of deposits under consideration and to the activity being
undertaken to qualify as a Competent Person as defined in the 2012 Edition of the“Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). Mr Dow
consents to the inclusion in the report of the matters based on his information in the form and context
in which it appears. With regard to the Company’s ASX Announcements referenced in the above
Announcement, the Company is not aware of any new information or data that materially affects the
information included in the Announcements.
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Litchfield Minerals Limited
ABN Quarter ended (“current quarter”)
33 612 660 429 December 2025
Consolidated statement of cash flows Current quarter
$A’000
Year to date (6
months)
$A’000
1. Cash flows from operating activities
1.1 Receipts from customers
1.2 Payments for
(a) exploration & evaluation
(b) development
(c) production
(d) staff costs (7) (14)
(e) administration and corporate costs (212) (263)
1.3 Dividends received (see note 3)
1.4 Interest received
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid
1.7 Government grants and tax incentives - 45
1.8 Other (provide details if material)
1.9 Net cash from / (used in) operating
activities
(219) (232)
2. Cash flows from investing activities
2.1 Payments to acquire or for:
(a) entities
(b) tenements (10) (21)
(c) property, plant and equipment (160) (161)
(d) exploration & evaluation (955) (1,424)
(e) investments
(f) other non-current assets - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (6
months)
$A’000
2.2 Proceeds from the disposal of:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) investments
(e) other non-current assets
2.3 Cash flows from loans to other entities
2.4 Dividends received (see note 3)
2.5 Other (provide details if material)
2.6 Net cash from / (used in) investing
activities
(1,124) (1,606)
3. Cash flows from financing activities
6,000 7,480
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
3.3 Proceeds from exercise of options 251 251
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
(396) (457)
3.5 Proceeds from borrowings
3.6 Repayment of borrowings
3.7 Transaction costs related to loans and
borrowings
3.8 Dividends paid
3.9 Other (provide details if material)
3.10 Net cash from / (used in) financing
activities
5,855 7,274
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
1,586 662
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(219) (232)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(1,124) (1,606)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
5,855 7,274
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (6
months)
$A’000
4.5 Effect of movement in exchange rates on
cash held
- -
4.6 Cash and cash equivalents at end of
period
6,098 6,069
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 98 1,586
5.2 Call deposits 6,000
5.3 Bank overdrafts
5.4 Other (provide details)
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
6,098 1,586
6. Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
86
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 4
+ See chapter 19 of the ASX Listing Rules for defined terms.
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities
7.2 Credit standby arrangements
7.3 Other (please specify)
7.4 Total financing facilities
7.5 Unused financing facilities available at quarter end
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.9) (219)
8.2 (Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(955)
8.3 Total relevant outgoings (item 8.1 + item 8.2) (1,174)
8.4 Cash and cash equivalents at quarter end (item 4.6) 6,098
8.5 Unused finance facilities available at quarter end (item 7.5) -
8.6 Total available funding (item 8.4 + item 8.5) 6,068
8.7 Estimated quarters of funding available (item 8.6 divided by
item 8.3)
5.20
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A.
8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A
8.8.3 Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 5
+ See chapter 19 of the ASX Listing Rules for defined terms.
Compliance statement
1 This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2 This statement gives a true and fair view of the matters disclosed.
Date: ................28 January 2026...................................................................
Authorised by: ................By the Board...................................................................
(Name of body or officer authorising release – see note 4)
Notes
1. This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2. If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4. If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5. If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.
Share your feedback
Discover