Litchfield Minerals Limited (ASX: LMS) is pleased to provide a technical update on the VT1 Conductor at
its Oonagalabi Project in the Northern Territory, where new geophysical results point to a significantly
larger and stronger system than previously defined.
VT1-OGRC0012 & DHEM results
As anticipated from our drilling results, OGRC0012 completely missed the main conductive body1
, as
confirmed by the DHEM (Downhole Electromagnetic) modelling (Figure 1, Table 1). The downhole
DHEM data clearly defines the true position of one of the conductors, showing that our hole tracked
outside the core response zone (Figure 1).
The downhole DHEM results show a conductor strength and geometry more intense and complex than
the airborne VTEM (Versatile Time Domain Electromagnetics) model suggested (995 Siemens versus
700 Siemens), with several plates likely interacting or offset along structural contacts.
Given DHEM’s practical detection radius (~100 – 150 m), we expect the system to continue to the
southwest, consistent with the original VTEM modelling and on-ground observations. The VTEM-
defined cluster comprises six to seven tightly folded/sheared plates, and DHEM now resolves multiple
stacked, high-conductance, offset bodies within the corridor, which we infer remain open to the
southwest.
We elected to drill aheadof completing the Ground EMto capitalise on rigavailability oncethe pad was
in, andtheresulthasbeenhighlyinformative,despitetheholebeing~75mofftheplatethatwas found
using DHEM. The hole still intersected mineralised indications and a conductive sulphide response,
which provides clear evidence of a fertile system immediately adjacent to the main body.
Our geophysics team expects Ground EM at VT1 to register a strong electromagnetic response. This
view is supported by the recent DHEM results, the near-surface position of the conductors, and the
scale indicated by the original VTEM modelling (Figure 2). Overall, the data is delineating six to seven
overlapping, high-conductance plates within a ~400 m folded corridor.
Table 1. OGRC012 drill hole collar information.
1
ASX Announcement, 23rd
October 2025:“Sulphides Intersected at VT1, DHEM to refine target locations”.
Figure 1. Illustrates the drill hole intersecting one of the originally modelled VTEM plates, with DHEM data refining the
interpretation and showing the actual positions of the nearest conductive plates.
Purpose-Built EM Program Designed for Power and Precision
Given the anticipated strength of the response, Litchfield has designed a high-resolution Ground EM
survey to accurately capture the system’s geometry and intensity. The program will begin the second
half of November 2025.
Key features include:
• Tighterlinespacingandhigherstationdensitytohandletheanticipatedstrongconductivityand
resolve multiple plates with precision.
• Fixed-loop EM acrosstheDHEM-definedarea to provide tightspatialcontrol, whilemaintaining
efficiency and speed.
• Survey parameters optimised to prioritise data density over repeat stacks, ensuring clean
resolution of overlapping conductors.
This design will deliver near-DHEM data resolution across the surface and allow the Company to drill
with maximum confidence immediately following interpretation.
Figure 2. VTEM BFz30 conductance image of the VT1 target highlighting a +400 m conductor, with interpreted faults and
lithological boundaries shown.
Geochemical Results Strengthen Magmatic Connection
Recent resampling of pulps of surface rock chip sample RK0072, where we previously reported2
0.6g/t
Au,0.6%Cu,14g/tAgand7g/tTefrompXRFresultsaboveVT1hasreturnedhighlyanomalousPlatinum
Group Element (PGE) assay results, including up to 0.1 g/t Palladium (Pd) from gossanous rock (Figure
3), coincident with elevated Nickel values of 850ppm (Appendix 1).
While 0.1 g/t Pd may sound modest, it is highly anomalous in surficial material and, together with
anomalous nickel, points to a potential magmatic–hydrothermal contribution at VT1. Importantly, this
signature sits alongside evidence for skarn and intrusion-related styles in the immediate area.
Having potentially multiple mineralisation styles co-located in one area is considered a positive, as it
infers repeated fluid and heat pulses, multiple metal sources and traps, and overprinting that can
upgrade metal grade and scale. If a magmatic source is proven at VT1, systems like Oonagalabi are the
ones that have the potential to build Tier-1 footprints; as typically they are robust, long-lived and offer
several independent ways to produce mineralisation.
The fact that VT1’s Pd–Ni–sulphide signature may differ from the mineralisation to the north
underscores the zonal diversity across Oonagalabi, which is exactly why this corridor is of significant
interest to us.
Figure 3. Gossan outcrop (482389E, 7438704N, Sample RK0072) showing classic ex-sulphide boxwork texture identified at VT1
immediately along strike from outcropping Oonagalabi Formation marble with oxidised copper mineralisation present. See
Appendix 1 for laboratory assay results.2
Visual estimates of mineral abundance results should never be considered a proxy or substitute for laboratory analyses where
concentrationsofgradesarethefactorsofprincipaleconomicinterest. Visualestimatesalsopotentiallyprovidenoinformation
regarding impurities or deleterious physical properties relevant to valuation.
Managing Director’s Comment
“VT1 continuesto growinsize, strength and significance. Our geophysicists are confident we’re dealing
withavery strong,multi-plateconductorsystem, onethat’sconsiderablylargerandmorecomplexthan
what the airborne data initially suggested.
The DHEM has already demonstrated the powerful results of this method, but its reach is limited, we
can only see roughly 100 – 150m each way and about 20m below the hole. That means what we’re
most likely picking up signals just at the edge of something much bigger.
The upcoming ground EM program has been purpose-built to handle an exceptionally strong response,
with tight line spacing and high station density designed to lock onto the heart of the conductor. Once
the data is in, we’ll be drilling VT1 with more data to direct our drilling program.
Adding to the excitement, the detection of anomalous palladium and nickel in gossanous rock above
the conductor points toward a potential magmatic-hydrothermal system, aligning perfectly with our
broader geological model for Oonagalabi.
2 ASX Announcement – 13th October- https://api.investi.com.au/api/announcements/lms/8bb0bf5d-5d5.pdf
Everything we’re seeing, from the sulphides in drilling to the EM response and now the surface
geochemistry, reinforces our belief that VT1 sits within a large, fertile mineralising system. This is the
kind of target that can deliver company-making discovery scale.”
Next Steps
• Ground EM acquisition commencing ~20 November 2025.
• Data integration and modelling immediately following.
• Targeted drilling to begin shortly after interpretation, with precise collar positions defined by
the new conductor models.
The Company expects VT1 to become one of the most significant and technically compelling targets
within the broader Oonagalabi system.
Cautionary Statement
This announcement contains forward-looking statements that involve known and unknown risks,
uncertainties, and other factors that may cause actual results, performance, or achievements to differ
materially from those expressed or implied. Such statements include but are not limited to,
interpretations of geophysical data, planned exploration activities, and potential mineralisation
outcomes. Visualestimatesofmineralabundance andpXRFresultsshouldneverbe consideredaproxy
or substitute for laboratory analyses where concentrations of grades are the factors of principal
economic interest. Visual estimates also potentially provide no information regarding impurities or
deleterious physical properties relevant to valuation. Forward-looking statements are based on
Litchfield Minerals Limited’s current expectations, beliefs, and assumptions, which are subject to
change in light of new information, future events, andmarket conditions. While the Company believes
that such expectations and assumptions are reasonable, they are inherently subject to business,
geological, regulatory, and operational risks. Further work, including drilling, is required to determine
the economic significance of any anomalies identified. Investors should not place undue reliance on
forward-looking statements. Litchfield Minerals Limited disclaims any obligation to update or revise
any forward-looking statements to reflect events or circumstances after the date of this
announcement, except as required by law.
About Litchfield Minerals
Litchfield Minerals is a critical mineral explorer, primarily searching for base metals and uranium out of
the Northern Territory of Australia. Our mission is to be a pioneering copper exploration company
committed to delivering cost-effective, innovative and sustainable exploration solutions. We aim to
unlockthefullpotentialofcopperandothermineralresourceswhileminimisingenvironmentalimpact,
ensuringthelongevityandaffordabilityofthisessentialmetalforfuturegenerations. Wearededicated
to involving cutting-edge technology, responsible practices and stakeholder collaboration drives us to
continuously redefine the industry standards and deliver value to our investors, communities and the
world.
The announcement has been approved by the Board of Directors.
For further information please contact:
Matthew Pustahya
Matthew@litchfieldminerals.com.au
Follow us on:
www.litchfieldminerals.com.au
https://twitter.com/Litchfield_LMS
https://www.linkedin.com/company/litchfield-minerals-limited/
Competent Person’s Statement
The information in this announcement relates to Exploration Results and is based on, and fairly
represents, information and supporting documentation compiled by Mr Russell Dow (MSc, BSc Hons
Geology), a Competent Person who is a Member of the Australian Institute of Mining and Metallurgy
(AUSIMM) and is a full-time employee of Litchfield Minerals Limited. Mr Dow has sufficient sampling
experience that is relevant to the style of mineralisation and types of deposits under consideration and
to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC
Code). MrDowconsentstothe inclusioninthePublic Report ofthemattersbasedon theirinformation
in the form and context in which it appears. With regard to the Company’s ASX Announcements
referenced in the aboveAnnouncement, the Companyis notaware of any new information or datathat
materially affects the information included in the Announcements.
Appendix 1. RK0072rockchipassay laboratory multi-elementdata
Sample_ID Cu_% Au_ppm Te_ppm Ag_ppm As_% Fe_% Ni_ppm Pd_ppm Pt_ppm
RK0072 0.59 0.58 7.00 14.00 0.26 54.40 850.00 0.105 0.05
JORC Code, 2012 Edition – Table 1 report
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard measurement
tools appropriate to the minerals under investigation, such
as down hole gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as limiting the
broad meaning of sampling.
• Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of mineralisation that are
Material to the Public Report.
• In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
Downhole EM
A downhole electromagnetic (DHEM) survey was carried out on
RC drill hole OGRC012 from 0-174m downhole. The survey was
carried out by AGS Pty Ltd under the guidance and supervision
of Mitre Geophysics Pty Ltd (Kate Hine).
Rock Chips
• Rock chip samples were collected from confirmed outcrops
only using geopicks.
• The samples were between 0.5 – 1kg and were collected in
marked calico bags for assaying.
• Sampling was conducted to ensure that the analytical
results are representative of the sampled outcrop. True
outcrop thicknesses were not calculated and have not been
reported.
• Rock chip samples were collected by hand. In some
instances, multiple samples were collected from a single
outcrop to better understand mineralisation variability.
Criteria JORC Code explanation Commentary
submarine nodules) may warrant disclosure of detailed
information.
• QAQC samples were inserted every 25 samples as per
standard Litchfield sampling protocols.
• Samples were submitted to Bureau Veritas, Adelaide for
multi-element and gold, palladium, platinum fire assay
analysis.
• (Al,Ba,Ca,Cr,Cu,Fe,K,Li,Mg,Mn,Na,Ni,P,S,Sc,Ti,V,Zn,Zr) and
ICP_MS(Ag,As,Be,Bi,Cd,Ce,Co,Cs,Dy,Er,Eu,Ga,Gd,Hf,Ho,In,La
,Lu,Mo,Nb,Nd,Pb,Pr,Rb,Re,Sb,Se,Sm,Sn,Sr,Ta,Tb,Te,Th,Tl,T
m,U,W,Y,Yb) following a multi-acid digest. Assays for Au,
Pt, Pd were completed by 40gram Fire Assay with an AAS
finish.
• The assay methods used are considered appropriate for
base and precious metal exploration purposes.
Drilling
techniques
• Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (e.g.
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc).
• No drilling is reported.
• This announcement is referring to downhole
electromagnetic (DHEM) surveying and the assay results of
a previously reported rock chip sample, and new PGE assays
from pulps of the same sample.
Drill sample
recovery
• Method of recording and assessing core and chip sample
recoveries and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• No drill sampling is reported.
• This announcement is referring to downhole
electromagnetic (DHEM) surveying and the assay results of
Criteria JORC Code explanation Commentary
• Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
a previously reported rock chip sample, and new PGE assays
from pulps of the same sample.
Logging • Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
• Whether logging isqualitativeorquantitativeinnature.Core
(or costean, channel, etc) photography.
• The total length and percentage of the relevant intersections
logged.
• No drilling logging is reported.
• This announcement is referring to downhole
electromagnetic (DHEM) surveying and the assay results of
a previously reported rock chip sample, and new PGE assays
from pulps of the same sample.
Sub-
sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter, half or all
core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc
and whether sampled wet or dry.
• Forall sample types,thenature,qualityandappropriateness
of the sample preparation technique.
• Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
• Measurestakentoensurethatthesamplingisrepresentative
of thein situ material collected, including for instance results
for field duplicate/second-half sampling.
• Whether samplesizes areappropriatetothegrainsizeof the
material being sampled.
• No drilling sampling and subsampling is reported.
• This announcement is referring to downhole
electromagnetic (DHEM) surveying and the assay results of
a previously reported rock chip sample, and new PGE assays
from pulps of the same sample.,
Criteria JORC Code explanation Commentary
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.
• Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (i.e. lack of bias)
and precision have been established.
• This announcement is referring to downhole
electromagnetic (DHEM) surveying and the assay results for
a previously reported rock chip sample and new PGE assays
from pulps of the same sample.
• Transmitter = Georesults DRTX
• Standard QAQC protocols were employed, inserting a QAQC
sampleforevery25samplessubmittedforanalysis. Internal
Litchfield QAQC samples all returned results within two
standard deviations of the expected result.
• Additionally, Bureau Veritas inserted 24 laboratory QAQC
samples (standards, blanks and repeats) as part of the
laboratory’s standard QAQC protocols. Final analytical
resultswerenotreleasedfromthelabuntilafullQAQCaudit
was completed and passed.
Criteria JORC Code explanation Commentary
Verification
of sampling
and assaying
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primarydata,data entryprocedures,data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• This announcement is referring to downhole
electromagnetic (DHEM) surveying only.
Location of
data points
• Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings and
other locations used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Drill hole collars are surveyed with a handheld GPS with an
accuracy of +/- 3m which is considered sufficient for drill
hole location accuracy.
• Co-ordinates are in GDA94 datum, Zone 53.
• Downhole depths are in metres measured downhole from
the collar location on surface.
• Topographic control has an accuracy of 2m based on
detailed satellite imagery derived DTM or on laser altimeter
data collected from aeromagnetic surveys.
Data spacing
and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• This announcement is referring to downhole
electromagnetic (DHEM) surveying and a surface rock chip
sample and is not sufficient to establish and or report
Mineral Resource and Ore Reserve estimation.
• Rock chip samples were collected randomly where visible
mineralisation was observed at surface.
Criteria JORC Code explanation Commentary
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this
is known, considering the deposit type.
• If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
haveintroducedasamplingbias,thisshouldbeassessedand
reported if material.
• No drilling or drill hole sampling is reported.
• This announcement is referring to downhole
electromagnetic (DHEM) surveying and the assay results of
a previously reported rock chip sample, and new PGE assays
from pulps of the same sample.
Sample
security
• The measures taken to ensure sample security. • This announcement is referring to downhole
electromagnetic (DHEM) surveying and the assay results for
a previously reported rock chip sample, and new PGE assays
from pulps of the same sample.
• Each sample was put into a tied off calico bag and then
several placed in large plastic “polyweave” bags which were
zip tied closed.
• Samples have been driven to the Bureau Veritas laboratory
in Adelaide by Northline Transport.
Audits or
reviews
• The results of any audits or reviews of sampling techniques
and data.
• Continuous improvement internal reviews of sampling
techniques and procedures are ongoing. No external audits
have been performed.
JORC Code, 2012 Edition – Table 1 report
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral
tenement
and land
tenure status
• Type, reference name/number, location and ownership
including agreements or material issues with third parties
such as joint ventures, partnerships, overriding royalties,
native title interests, historical sites, wilderness or national
park and environmental settings.
• The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to
operate in the area.
• Tenement includes Oonagalabi (EL32279) for a total of
145.3km2 and 46 sub-blocks.
• EL32279 is owned by Kalk Exploration Pty. Ltd., a 100%
ownedentityofLitchfieldMinerals Limited. Thetenement is
located approximately 125km northeast of Alice Springs on
pastoral leases.
• The tenement is in good standing and there are no known
impediments.
Criteria JORC Code explanation Commentary
Exploration
done by
other parties
• Acknowledgment and appraisal of exploration by other
parties.
• A summary of previous EL32279 exploration and mining is
presented below:
• Oonagalabi was discovered in the 1930’s.
• In 1970, Russgar Minerals completed regional mag-rad
survey, VLF_EM survey, ground magnetic survey, single line
resistivity traverse and 14 drill holes.
• In 1971, Geopeko completed limited IP.
• 1979, Amoco completed photo-interpretation, rock chip
sampling and drilling (8 holes).
• 1981 D’Dor Mining NL completed limited dipole-dipole IP.
• Between 1990 – 1996 on EL 6940 Clarence River Finance
Group explored for garnet in the Florence and Maud Creeks,
collecting 15 samples that averaged 4.4% garnet
• Between 1997 – 2000 on EL 9420 Clarence River Finance
Group completed garnet exploration north of Oonagalabi
EL32279. In 2007, ML 22624 was applied for to cover the
centralOonagalabidepositandsurroundingproximalalluvial
systems (outside 2025 bulk sampling area). No work was
completed and the ML was relinquished in 2019.
• Silex 2009 completed pole-dipole IP 1 x diamond hole.
Criteria JORC Code explanation Commentary
Geology • Deposit type, geological setting and style of mineralisation. • The Oonagalabi-type mineralisation is considered to be
either skarn-related, sediment-hosted or carbonate
replacement with potential for high-grade remobilised
breccia zones similar to the Jervois deposit. EL32279 falls
within one of Geoscience Australia’s IOCG high potential
zones.
• The project lies within the Harts Range that represents a
package of multiply deformed and metamorphosed
sedimentary and igneous intrusive rock.
Drill hole
Information
• A summary of all information material to the understanding
of the exploration results including a tabulation of the
following information for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• Iftheexclusionofthisinformationisjustifiedonthebasisthat
the information is not Material and this exclusion does not
detract fromtheunderstandingof thereport,theCompetent
Person should clearly explain why this is the case.
• See Appendix 1 and Table 1 for sample location data.
• This announcement is referring to downhole
electromagnetic (DHEM) surveying and the assay results of
a previously reported rock chip sample, and new PGE assays
from pulps of the same sample.
Criteria JORC Code explanation Commentary
Data
aggregation
methods
• In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations
(e.g. cutting of high grades) and cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts incorporate short lengths of
high grade results and longer lengths of low grade results,
the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be
shown in detail.
• The assumptions used for any reporting of metal equivalent
values should be clearly stated.
• No data aggregation methods used.
Relationship
between
mineralisatio
n widths and
intercept
lengths
• These relationships are particularly important in the
reporting of Exploration Results.
• If the geometry of the mineralisation with respect to the drill
hole angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are
reported,thereshouldbeaclearstatementtothiseffect(e.g.
‘down hole length, true width not known’).
• No drilling intercept data is reported.
• This announcement is referring to downhole
electromagnetic (DHEM) surveyingandtheassayresults ofa
previously reported rock chip sample, and new PGE assays
from pulps of the same sample.
Diagrams • Appropriate maps and sections (with scales) and tabulations
of intercepts should be included for any significant discovery
being reported These should include, but not be limited to a
plan view of drill hole collar locations and appropriate
sectional views.
• See figures within the main body of the announcement.
Criteria JORC Code explanation Commentary
Balanced
reporting
• Where comprehensive reporting of all Exploration Results is
not practicable, representative reporting of both low and
high grades and/or widths should be practiced to avoid
misleading reporting of Exploration Results.
• All available relevant information is presented.
Other
substantive
exploration
data
• Otherexplorationdata,ifmeaningfulandmaterial,shouldbe
reported including (but not limited to): geological
observations;geophysicalsurveyresults;geochemical survey
results; bulk samples – size and method of treatment;
metallurgical test results; bulk density, groundwater,
geotechnical and rock characteristics; potential deleterious
or contaminating substances.
• See the main body of this report for all pertinent
observations and interpretations.
Further work • The nature and scale of planned further work (e.g. tests for
lateral extensions or depth extensions or large-scale step-out
drilling).
• Diagrams clearly highlighting the areas of possible
extensions,including themain geological interpretationsand
future drilling areas, provided this information is not
commercially sensitive.
Future planned exploration includes:
• Ground EM and IP at VT1, VT2 and Oonagalabi – Bomb
Diggity corridor
• Phase 3 RC drilling.
Share your feedback
Discover