Lithostructural expands potential for new mineralised zones
Released
Released
Announcement PDF
ASX Announcement | 28th August 2024
ENHANCED LITHOSTRUCTURAL UNDERSTANDING OF THE MOUNT DOREEN GEOLOGY
Highlights
• New lithostructural interpretation has confirmed a complex magmatic and structural history
of multiple mineralisation events, significantly expanding the potential for discovering new
mineralised zones.
• Granite contacts, particularly structural contacts, play a significant role in project-scale
hydrothermal fluid flow, allowing improved appreciation of potential mineralised zone
locations.
• PGN Geoscience has identified target areas, which are potential new mineralisation zones to
assist with further data and exploration activities such as VTEM & drilling.
Litchfield Minerals Limited (“Litchfield” or the “Company”) (ASX:LMS), a company with a
strategic emphasis on critical minerals, is pleased to announce the results of a lithostructural
interpretation completed on the Mt Doreen Project, West Arunta Northern Territory.
Managing Director and CEO, Matthew Pustahya, commented:
“The lithostructural interpretation of Mount Doreen has significantly expanded the potential for
discovering new mineralised zones within the tenement package. The team was excited by the
extent and complexity of structural activity throughout the project and are excited about what this
may lead to.
While the team is still awaiting additional data, particularly the VTEM & geochemistry to refine our
existing targets and develop further targets, the initial data is already proving valuable in identifying
potential trends and structures connecting the known mineralised outcrops. PGN’s insight is helping
us predict where further areas of mineralisation might be located and has generated some priority
areas to explore.
The upcoming VTEM survey, scheduled to begin this week, will significantly enhance our
understanding of this structural interpretation and advance our exploration efforts, with the
expectation of finding large, massive sulphide bodies.”
Lithostructural Interpretation
The new Lithostructural interpretation was completed using all available geophysical and
geological datasets and relied heavily on Litchfield’s new 100m line-spaced aeromagnetic data
acquired in March 2024. (Figure1)
Figure 1 – Stitched RTP 1VD magnetic image between Litchfield’s 2024 (norther EL block) & Rio Tinto’s 1997
aeromagnetic surveys (southern EL block)
The interpretation (Figure 2) has produced a detailed basement geological map of the Mt Doreen
Project that shows a complex magmatic and structural history with two distinct base
metal mineralisation events. Older Cu-Pb-Zn-Ag mineralisation at Silver King, Clark, and Mt Irene
is genetically related to the Yaloolgarrie Granite while younger Cu-W-Pb-Ag mineralisation at
Wolfram Hill is related to the Southward Granite. (Refer to section 6.2 in Independent
Geologists Report (IGR) by Ross et al, 2023). Additionally, the Luni Nb deposit across the
border in Western Australia is located at the contact between the older Carrington Granite and the
Lander Rock Formation and may represent a valid exploration target within the Mt Doreen
Project.
Structural interpretation indicates that most of the known base metal mineralisation is located at
the contact between coeval granites and the Lander Rock Formation or within the
granites themselves. This has highlighted several high-priority exploration target zones that have
not been assessed by previous explorers due to extensive, shallow (<10m) alluvial cover. (Figure3)
Litchfield’s VTEM survey commences around the 29th of August and will provide another valuable
geological dataset to be incorporated into PGN’s interpretation. The VTEM survey has been
designed specifically to identify semi-massive and massive base metal sulphide mineralisation and
will significantly enhance Litchfield’s ability to define specific drillhole targets.
Figure 2 - Lithostructural interpretation of the Mount Doreen tenement - EL31305
Figure 3 - Lithostructural interpretation of the Mount Doreen tenement, including target zones - EL31305
Upcoming News Flow
• Completion of flying the VTEM airborne survey in early September.
• Results from soil and rock chip sampling of REE-anomalous, uranium granites.
• Target definition and ranking from lithostructural and VTEM results (late September).
• Geochemistry results from soil campaign over Dumunzi.
Cautionary Statement
The lithostructural survey currently referenced reflects PGN Geoscience and our team's
interpretation based on new and historical data. These models, suggestions, and associated
inferences may evolve as additional information is gathered.
About Litchfield Minerals
Litchfield Minerals is a critical mineral explorer, primarily searching for base metals and uranium
out of the Northern Territory of Australia. Our mission is to be a pioneering copper exploration
company committed to delivering cost-effective, innovative, and sustainable exploration
solutions.
We aim to unlock the full potential of copper and other mineral resources while minimising
environmental impact, ensuring the longevity and affordability of this essential metal for future
generations. We are dedicated to involving cutting-edge technology, responsible practices, and
stakeholder collaboration, driving us to continuously redefine industry standards and deliver
value to our investors, communities, and the world.
The announcement has been approved by the Board of Directors.
Competent Person’s Statement
The informa�on in this Presenta�on that relates to Explora�on Results is based on, and fairly
represents, informa�on and suppor�ng documenta�on compiled by Mr Russell Dow (MSc, BScHons
Geology), a Competent Person who is a Member of the Australian Ins�tute of Mining and Metallurgy
(AUSIMM)andisafull-�meemployeeofLitchfieldMineralsLimited.MrDowhassufficientexperience
that is relevant to the style of mineralisa�on and types of deposits under considera�on and to the
ac�vity being undertaken to qualify as a Competent Person as defined in the 2012 Edi�on of the
“Australasian Code for Repor�ng of Explora�on Results, Mineral Resources and Ore Reserves” (JORC
Code). Mr Dow consents to the inclusion in the report of the maters based on his informa�on in the
form and context in which it appears. With regard to the Company’s ASX Announcements referenced
intheaboveAnnouncement,theCompanyisnotawareofanynewinforma�onordatathatmaterially
affects the informa�on included in the Announcements.
Forward-Looking Statements and Important Notice
Statements regarding plans with respect to Litchfield’s project are forward-looking statements. There
can be no assurance that the Company’s plans for the development of its projects will proceed as
currently expected. These forward-looking statements are based on the Company’s expecta�ons and
beliefs concerning future events. Forward-looking statements are necessarily subject to risks,
uncertain�es, and other factors, many of which are outside the control of the Company, which could
cause actual results to differ materially from such statements. Edition – Table1report
JORCCode,2012Edition– Table 1report
Section 1Sampling Techniques andData
(Criteria in this sec�on apply to all succeeding sec�ons.)
Criteria JORC Code explana�on Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
tothemineralsunderinvestigation,suchasdownholegammasondes,
or handheld XRF instruments, etc). These examples should not be
taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
• AspectsofthedeterminationofmineralisationthatareMaterialtothe
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required,such
as where there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (eg submarine nodules)
may warrant disclosure of detailed information.
• No drilling reported in this release.
• Airborne magne�c and radiometric data was used extensively
during the lithostructural interpreta�on process, relying mainly
on Lithcfield’s new 100m/50m line-spaced aeromagne�c survey
(March 2024).
• The airborne magne�c and radiometric survey was conducted
by MagSpec Airborne Surveys. MagSpec acquired the data with
a fixed-wing aircra� (Cessna 210).
• 100m survey line spacing and 30m flying height above ground
level (Mt Doreen North), 50m line spacing and 30m flying height
for Mt Irene and Silver King.
• Sample spacing 3.5m for magne�cs and 35m radiometrics.
• Magnetometers: G-823A cesium vapour magnetometer.
• Gamma Ray Spectrometer: RSI RS-500 gamma-ray spectrometer
with 1024 Channels, incorpora�ng 2x RSX-4 detector packs
(32L).
• GPS: Integrated Novatel OEM719 DGPS receiver, 555 Channel
with L1/L2 + GLONASS Mul� Frequency.
• Al�meter: Bendix/King KRA 405 radar al�meter and Renishaw
ILM-500R laser al�meter.
Criteria JORC Code explana�on Commentary
• DataAcquisi�onSystem:IntegratedNovatelOEMDGPSreceiver,
High precision cesium vapour magnetometer (sample rates
20Hz).
Drilling
techniques
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
• Not applicable as no drilling is reported
Drill sample
recovery
• Method of recording and assessing core and chip sample recoveries
and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whetherarelationshipexistsbetweensamplerecoveryandgradeand
whether sample bias may have occurred due to preferential loss/gain
of fine/coarse material.
• Not applicable as no drilling is reported
Logging • Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
• Not applicable as no drilling is reported
Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter, half or all core
taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
• Not applicable as no drilling is reported
Criteria JORC Code explana�on Commentary
• Measurestakento ensurethat thesampling isrepresentative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain sizeof the material
being sampled.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
• The survey quality control (QC) parameters and tolerances are
listed in below table:
• A dedicated PC-based notebook computer was used as a
worksta�on to process and image geophysical and naviga�on
data acquired during the survey, producing semi-final,
preliminary levelled grids and maps.
Criteria JORC Code explana�on Commentary
• Flight path plots were generated from the GPS data to verify the
completeness and accuracy of each day's flight(s).
• The Geoso� so�ware system permited preliminary maps to be
quickly and efficiently created for errors and coherency checks.
Verification of
sampling and
assaying
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Rawgeophysicaldatawascapturedelectronicallyinthefieldand
sent to MagSpec Airborne Surveys for internal valida�on. All
quality control was completed by MagSpec Airborne Surveys.
• Flight data quality and completeness were assured by both
sta�s�cal and graphical means on a daily basis (Digital Data
Verifica�on).
• Sampling and assay verifica�on not applicable for aeromagne�c
survey.
Location of
data points
• Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys),trenches,mineworkingsand other locations used
in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• The coordinates were confirmed as being WGS84 UTM zone
52S.
• On-board DGPS posi�oning of all data loca�ons.
• Traverse lines were surveyed at an average spacing of 100m.
• Control �e lines on block were surveyed at an average spacing
of 1000m.
The survey was planned at 30m above ground at one
dimensional �ght drape. The target accuracy for the aircra�
was± 10m from the planned eleva�on.
Data spacing
and
distribution
• Data spacing for reporting of Exploration Results.
• Whether thedata spacingand distribution issufficientto establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications
applied.
• Whether sample compositing has been applied.
• The pre-processed data sampling rates for the sub-systems are:
o Magne�c data (20Hz)
o Radiometric data (2Hz)
o Airborne GPS (20Hz)
• Base sta�on magnetometer (0.5Hz).
Orientation of
data in
• Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
• Magne�c survey lines were flown 090-270 degrees (E-W).
Criteria JORC Code explana�on Commentary
relation to
geological
structure
the deposit type.
• If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
• Drilling orienta�on not applicable for aeromagne�c survey.
Sample
security
• The measures taken to ensure sample security. • A report of daily ac�vity covering the total acquisi�on period
prepared. The report covers produc�on figures, flight dura�on
�mes and daily comments on data QA/QC.
• All data collected under strict security measures by contractor.
Audits or
reviews
• The results of any audits or reviews of sampling techniques and data. • All digital airborne magne�c and radiometric data was subject
to audi�ng by independent geophysical contractor, Xcalibur
Airborne Geophysics.
• No other audits or reviews were reported.
Sec�on 2 Repor�ng of Explora�on Results
(Criteria listed in the preceding sec�on also apply to this sec�on.)
Criteria JORC Code explana�on Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and ownership including
agreementsormaterialissueswiththirdpartiessuchasjointventures,
partnerships, overriding royalties, native title interests,historical sites,
wilderness or national park and environmental settings.
• The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
• RefertoSec�on4inIndependentGeologistsReport(IGR)byRoss
et al., 2023 for further detail. In summary, the Mount Doreen
project is secured by EL 31305 for total of approximately 388.35
square kilometres.
• All tenements within the Mt Doreen are 100% owned by
Litchfield Minerals Ltd.
• The Mt Doreen Project is located 325km northwest of Alice
Springs pastoral lease. The tenements are in good standing and
there are no known impediments.
Criteria JORC Code explana�on Commentary
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration by other parties. • Refer to Sec�on 6 and 7 in Independent Geologists Report (IGR)
by Ross et al,, 2023 for further detail. A summary of previous
explora�on and mining is presented below:
• 1930- 1956: Minor amounts of copper and tungsten extracted
from Silver King, Clark, Mount Irene and Wolfram Hill.
• 1969: NT Mines & Water Resources diamond drilling at Clark
workings.
• 1987 – 2006: White Industries/Mareeba Mining, Bruce and
Mules, MIM Explora�on/Roebuck Resources, Track Minerals,
Poseidon Gold/Yuendumu Mining, BHP, Homestake Gold, Rio
Tinto Explora�on and Tanami Gold completed geological
mapping, geochemical sampling, airborne and ground
geophysical surveys, and drilling programs.
Geology • Deposit type, geological setting and style of mineralisation. • RefertoSec�on5inIndependentGeologistsReport(IGR)byRoss
et al., 2023 for further detail. In summary:
• Mount Doreen is located in the southern por�on of the
Paleoproterozoic Aileron Province of the Arunta Region.
• TheoldestrocksatMountDoreenarethemul�plydeformedand
metamorphosed siliciclas�c sediments of the Lander Rock
Forma�on. The younger volcano sedimentary Patmungala Beds
lie in the south of the tenement, and both are intruded by the
Yarunganyi Granite. Numerous major faults strike close to east-
west and o�en contain veins or vein swarms of quartz, forming
ridges. Neoproterozoic to Palaeozoic sedimentary rocks of the
NgaliaBasinoverlietheAileronbasementinthesouthwestofthe
tenement and along the southern boundary.
Criteria JORC Code explana�on Commentary
• Mineralisa�on is considered to be epigene�c intrusion-related
breccia and vein mineralisa�on with polymetallic copper-lead-
zinc-silver-molybdenite and tungsten. Mineralisa�on is
interpreted to be from varied sources and associa�ons as
evidenced from mineralisa�on da�ng.
• The most prominent mineralisa�on is supergene copper at Silver
King with varying lead-zinc-silver in quartzveins and shear zones.
Drill hole
Information
• A summary of all information material to the understanding of the
exploration results including a tabulation of the following information
for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from
the understanding of the report, the Competent Person should clearly
explain why this is the case.
• No drilling or assaying is reported in this report.
Data
aggregation
methods
• In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths of high grade
results and longer lengths of low grade results, the procedure used for
such aggregation should be stated and some typical examples of such
aggregations should be shown in detail.
• The assumptions used for any reporting of metal equivalent values
should be clearly stated.
• No drilling or assaying is reported in this report.
Criteria JORC Code explana�on Commentary
Relationship
between
mineralisatio
n widths and
intercept
lengths
• These relationships are particularly important in the reporting of
Exploration Results.
• If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (eg ‘down hole length, true
width not known’).
• No drilling or assaying is reported in this report.
Diagrams • Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not belimited to a plan view of drill
hole collar locations and appropriate sectional views.
• Projectloca�on mapand plan mapofthedrill holeloca�onswith
respecttoeachotherandwithrespecttootheravailabledataare
included in the text.
• Drill hole loca�ons have been determined with hand-held GPS
drill hole collar loca�on (Garmin GPS 78s) +/- 5m in X/Y/Z
dimensions.
• Refer to Sec�on 6 and 7 of the Independent Geologists Report
(IGR) by Ross et al., 2023.
Balanced
reporting
• Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting of
Exploration Results.
• Individual gravity readings have not been reported, plans within
this report provide an adequate overview of the ground gravity
data.
Other
substantive
exploration
data
• Otherexplorationdata,ifmeaningfulandmaterial,shouldbereported
including (but not limited to): geological observations; geophysical
survey results; geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics; potential
deleterious or contaminating substances.
• See the main body of this report for all per�nent observa�ons
and interpreta�ons.
Further work • The nature and scale of planned further work (eg tests for lateral
extensions or depth extensions or large-scale step-out drilling).
• Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling areas,
Future planned explora�on includes:
• RAB/RC/DD drill tes�ng
• Geological mapping and geochemical sampling.
Criteria JORC Code explana�on Commentary
provided this information is not commercially sensitive.
Share your feedback
Discover