Litchfield Minerals (ASX: LMS) (“Litchfield” or “the Company”) is pleased to re-release the Gossanous
Copper Identified Above Priority Conductor ASX release from 1 September 2025 with addition
information of pXRF disclosed in Table 1 for the benefit of shareholders and investors. The information
included for the pXRF data is in accordance with AIG newsletter no. 115.
The announcement has been approved by the Board of Directors.
For further information please contact:
Matthew Pustahya
Matthew@litchfieldminerals.com.au
Follow us on:
www.litchfieldminerals.com.au
https://twitter.com/Litchfield_LMS
https://www.linkedin.com/company/litchfield-minerals-limited/
ASX Announcement 1st
September 2025
Gossanous Copper Identified Above Priority Conductor; Scale and
Confidence Build
Key Highlights
• VTEMConductor1:In-situgossanousmaterialidentified,returningupto8%Cu(XRF11
),directly
above the centre of the large VTEM conductor.
• VTEM Conductor 2: Field mapping shows presence of a distinctive plant species that to date
has only been observed in association with the Oonagalabi Formation and copper-zinc
mineralisation, strengthening confidence in a sulphide source below.
• Bomb Diggity Cluster: Ground truthing reveals new exposures of copper mineralisation within
outcropping Oonagalabi Formation, extending potential strike length by a further 1km.
• Final VTEM data received: Multiple new targets extend north and south of Oonagalabi,
indicating the mineralised system has the potential to be a lot larger and more laterally
extensive than previously recognised.
• Access has been de-risked: LMS expect to have ground preparation machinery into VTEM 1,
VTEM 2 and the Bomb Diggity cluster early September, enabling a multi-target RC program.
Litchfield Minerals Limited (ASX: LMS, “Litchfield” or “the Company”) is pleased to report highly
encouraging results from ground-truthing activities at its Oonagalabi Project, following the recently
announced VTEM survey2
, which defined 14 Priority 1 conductors (LMS ASX Announcement 21 August
2025).
General Commentary
The VTEM program, announced August 21st
, 2025, had materially expanded the prospective footprint
at Oonagalabi. The previously drilled outcrop sits within a mildly conductive corridor that remains
mineralised, while stronger conductors north and south offer multiple, higher-priority sulphide targets
(Figure 1).
Several high-priority anomalies display responses consistent with sulphides. Three of the four priority
conductors that were ground-truthed, display mineralisation indicators, including both physical copper
mineralisation and geobotanical (plant) indicators known in this area.
These new data points strengthen our working view that the previously drilled exposed Oonagalabi
outcrop may be the distal ‘smoke’ rather than the core of the system. Reconnaissance mapping during
1
Disclaimer: XRF results are indicative only and are not a substitute for laboratory assays. See
Cautionary Statement, Page 7.
2
ASX Announcement 21/08/2025 - VTEM Survey Uncovers Multiple High Priority Sulphide Targets
VTEM ground-truthing has extended the outcropping mineralised Oonagalabi Formation by a further
1km.
Stronger alteration above a weaker VTEM conductor at Bomb Diggity indicates that there is potentially
a mineral system which is larger than historically recognised and not constrained by earlier fault
interpretations. We are potentially moving towards the core with the Phase 2 RC drilling program.
Given the scale and complexity of Oonagalabi, a systematic drilling program is required to test the
potential of the full system. To test these targets properly, we’ll need strong Shareholder support for
the SPP as that will enable us to drill comprehensively and give this system the exploration attention it
deserves.
Figure 1. Oonagalabi VTEM BFz30 conductivity image showing the Priority 1 conductors, preliminary anomaly
picks, interpreted prospective horizon, historic drillholes and proposed Phase 2 RC holes.
Managing Director, Matt Pustahya, commented:
“Ground-truthing and finalVTEM data materially lift our conviction in Oonagalabi as apotentially large,
significantmineralisedsystem. We’venowconfirmedgossanouscopperdirectlyabove theVTEM1high-
priority conductor, mapped fresh exposures of the mineralised Oonagalabi Formation with stronger
alteration at the Bomb Diggity conductive cluster, and logged multiple Priority 1 conductors with clear
indicators that fit a sulphide model. The only way to prove this is to drill, and that’s exactly what we’re
preparing to do.
Thisisabig,complexsystemanditdeservesapropermethodicaltestacrossseveralhigh-prioritytargets.
Our Share Purchase Plan was deliberately structured as a ‘thank you’ to shareholders who’ve backed us
through the past 18 months; this support is crucial and will help to directly fund a more comprehensive
program than our current cash balance alone would allow. With successful execution of the plan we’ve
mapped out, the next quarter has the potential to be genuinely company-defining.”
Conductor VT1 – Gossanous Copper Directly Above VTEM Anomaly
At the 500m long, highly conductive VT1 target, gossanous copper occurs directly above the conductor
plate, with handheld XRF up to 8% Cu* (assays expected within 4 – 6 weeks). Gossan forms from the
oxidation of fresh sulphides and this strong surface expression is consistent with sulphides at depth.
Figure 2. Gossan outcrop (482389E, 7438704N) showing classic ex-sulphide boxwork texture identified at VT1
immediately along strike from outcropping Oonagalabi Formation marble with oxidised copper mineralisation
present. Disclaimer: pXRF results are indicative only and are not a substitute for laboratory assays. See Cautionary
Statement, Page 7, JORC Table Page 9.
Based on visual estimates, the gossan comprises massive iron oxide (90%), quartz (8%), disseminated
copper silicate (2% chrysocolla) and trace disseminated fresh chalcopyrite.
Mapping also identified marble, calc-silicate and massive garnet-amphibole-quartz typical of the
mineralised Oonagalabi Formation. This area located 8km beyond previous work along the prospective
horizon, points to a much larger system (Figure 2).
Conductor VT2 – Deep Sulphide Target Strengthened
VT2 comprises a large, high-conductance VTEM plate modelled at approximately 150m depth and
extending ~500m along strike. While no surface copper was observed, two independent vectors lift
confidence: (1) the “Zinc Bush” termed by Litchfield Minerals, a geobotanical indicator, seen by our
team onlyoverCu–Znmineralisationat theOonagalabiprospect, and (2) confirmation that thearea sits
within the mineralised horizon. The scale and conductance of the plate, together with these vectors,
elevate VT2 as a high-priority blind sulphide target.
Bomb Diggity Cluster – Scale Expansion
At the Bomb Diggity cluster of VTEM conductors, ground truthing has confirmed the presence of
exposed Oonagalabi Formation that has not been previously identified or mapped (Figure 3). This
observation has added a further 1km of strike to the Oonagalabi system. We estimate the outcropping
mineralisation comprises massive anthophyllite (98%), malachite and disseminated chalcopyrite (2%).
This points to a system much larger than historically recognised and not constrained by earlier fault
interpretations. Stronger alteration than the previously drilled main outcrop and surface copper
support this corridor as a potential major structural and mineralising control, coincident with high
magnetic and gravity features.
Figure 3. Outcropping anthophyllite – malachite mineralised Oonagalabi Formation found at one of the weaker
VTEM anomalies at the Bomb Diggity cluster (486646E, 7442849N). Disclaimer: pXRF results are indicative only
and are not a substitute for laboratory assays. See Cautionary Statement, Page 7, JORC Table Page 9.
VTEM Conductor 6
The VTEM Conductor VT6 appears to be a blind target. Importantly, we also noted the ‘Zinc Bush’ over
the conductor, however, this area is on top of the steepest, highest terrain in the area (1,130m RL), so
weareunlikelytodrilltestthissiteuntilwefirsthavesuccess lowerdownatthenewlyidentifiedtargets
mentioned above.
Access / Drill-readiness
Key to any drilling program is logistics and access tracks, which the recent field work focussed on dr-
risking. We now expect to get earth moving machinery into VTEM 1, VTEM 2 and the Bomb Diggity
cluster in early September, enabling a multi-target RC program, subject to funding.
Project Refresher- Lease EL32279
Oonagalabi is a large, mineralised outcrop (+3km) which has drilled significant copper, zinc intercepts,
and sits in a highly prospective structural setting, northeast of Alice Springs where deep crustal
architecture and continental-scale gravity lineaments intersect, features commonly associated with
Tier-1 systems (Figure 4).
Geoscience Australia’s IOCG prospectivity mapping classifies the broader Oonagalabi area as having
moderate IOCG potential, reflecting favourable metal sources, fluid pathways and depositional traps
near the Irindina–Aileron Province boundary (Cloutier et al 2025., Iron oxide copper–gold potential of
Australia using a hybrid data- and knowledge-driven approach and its implications for the formation of
IOCG mineral systems, Ore Geology Reviews Volume 185, October 2025, 106802). This combination of
architecture and position is a key reason we’re investing exploration dollars here.
Within this corridor, mineralisation at Oonagalabi is focused in the Oonagalabi Formation (marble, calc-
silicates, garnet–quartzite). Our recent geophysics and mapping highlight multiple
conductive/chargeable targets along this prospective horizon, consistent with a large, mineralised
footprint where high-grade lenses may be focused by structures and intrusive-related alteration.
Figure 4. Overlay of the CSIRO IOCG prospectivity map and Continental scale gravity lineaments, highlighting
Oonagalabi’s location in this structural framework
Bomb Diggity target Explained
Bomb Diggity is the nickname for a large +1km long and deep, ‘blind’, pipe-like magnetic body located
~900m northeast of the main Oonagalabi outcrop, positioned on the Irindina–Aileron tectonic contact
(Figure 5).
Ground gravity has defined three coincident density anomalies adjacent to this magnetic feature,
together indicating a potentially significant intrusive/alteration centre that could act as a
heat/metal/fluid source for Oonagalabi (or represent a younger, related event).
This thesis is supported by recent drilling at Oonagalabi of a modelled magnetic structure we interpret
as related to Bomb Diggity. This hole intersected magnetite–Bi–Au–Ag mineralisation consistent with a
proximal intrusive-related overprint, appearing different to other mineralisation drilled in the
Oonagalabi formation.
OGRC002 returned 15 m @ 0.45 g/t Au, 0.17% Bi, 1.09 g/t Ag, including 1 m @ 2.86 g/t Au, 0.84% Bi
and 1 m @ 1.62 g/t Au, 0.58% Bi, which we interpret as vectors toward the Bomb Diggity source.
The presence of VTEM conductors beside the Bomb Diggity magnetic body strengthens the
interpretation that this structure could host sulphide mineralisation; if confirmed by drilling, it would
indicate meaningful tonnage potential.
Figure5.Showsthe“BombDiggitymagneticanomaly”inredpolygons(+>0.022mesh),OGRC002highlightswhere
thecompanyinterceptedthegoldandbismuthinamagnetic finger,whichisinterpretedasbeingpartof,anddistal
to, the Bomb Diggity magnetic anomaly. The blue line indicates the interpreted fluid flow direction from Bomb
Diggity into Oonagalabi.
Next Steps
• Mobilisation of earthmoving equipment in early September to prepare drill pads and access
tracks.
• RCdrillingprogramtocommencemid-September,startingattheBombDiggity cluster,thenthe
selected Priority 1 conductors followed by testing of potential Au-Bi-Ag zones at Oonagalabi.
• Case all VTEM RC holes for down-hole EM to refine conductor geometry and vectors to
sulphides.
• Ongoing updates as results from drilling and assays become available.
Cautionary Statement
This announcement contains forward-looking statements that involve known and unknown risks,
uncertainties, and other factors that may cause actual results, performance, or achievements to differ
materially from those expressed or implied. Such statements include but are not limited to,
interpretations of geophysical data, planned exploration activities, and potential mineralisation
outcomes. VisualestimatesofmineralabundanceandpXRFresults shouldneverbeconsideredaproxy
or substitute for laboratory analyses where concentrations of grades are the factors of principal
economic interest. Visual estimates also potentially provide no information regarding impurities or
deleterious physical properties relevant to valuation. Forward-looking statements are based on
Litchfield Minerals Limited’s current expectations, beliefs, and assumptions, which are subject to
change in light of new information, future events, andmarket conditions. While the Company believes
that such expectations and assumptions are reasonable, they are inherently subject to business,
geological, regulatory, and operational risks. Further work, including drilling, is required to determine
the economic significance of any anomalies identified. Investors should not place undue reliance on
forward-looking statements. Litchfield Minerals Limited disclaims any obligation to update or revise
any forward-looking statements to reflect events or circumstances after the date of this
announcement, except as required by law.
About Litchfield Minerals
Litchfield Minerals is a critical mineral explorer, primarily searching for base metals and uranium out of
the Northern Territory of Australia. Our mission is to be a pioneering copper exploration company
committed to delivering cost-effective, innovative and sustainable exploration solutions. We aim to
unlockthefullpotentialofcopperandothermineralresourceswhileminimisingenvironmentalimpact,
ensuring the longevityandaffordabilityof thisessential metalfor future generations. We are dedicated
to involving cutting-edge technology, responsible practices and stakeholder collaboration drives us to
continuously redefine the industry standards and deliver value to our investors, communities and the
world.
The announcement has been approved by the Board of Directors.
For further information please contact:
Matthew Pustahya
Matthew@litchfieldminerals.com.au
Follow us on:
www.litchfieldminerals.com.au
https://twitter.com/Litchfield_LMS
https://www.linkedin.com/company/litchfield-minerals-limited/
Competent Person’s Statement
The information in this announcement relates to Exploration Results and is based on, and fairly
represents, information and supporting documentation compiled by Mr Russell Dow (MSc, BSc Hons
Geology), a Competent Person who is a Member of the Australian Institute of Mining and Metallurgy
(AUSIMM) and is a full-time employee of Litchfield Minerals Limited. Mr Dow has sufficient sampling
experience that is relevant to the style of mineralisation and types of deposits under consideration and
to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC
Code). MrDowconsentstothe inclusioninthePublic Report ofthemattersbasedon theirinformation
in the form and context in which it appears. With regard to the Company’s ASX Announcements
referenced in the aboveAnnouncement, the Companyis notaware of any new information or datathat
materially affects the information included in the Announcements.
JORC Code, 2012 Edition – Table 1 report
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard measurement
tools appropriate to the minerals under investigation, such
as down hole gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as limiting the
broad meaning of sampling.
• Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of mineralisation that are
Material to the Public Report.
• In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as where
The instruments and parameters used for the VTEM survey are as
follow:
• The VTEM survey was flown by UTS Geophysics Pty. Ltd.
• Heliborne electromagnetic data was acquired with VTEMTM
Max transmitter frequency of 25Hz, loop diameter 35m and
mean terrain clearance height of 35m.
• Line spacing was 200m across the full survey area with the
central 40% of the survey also flown at 100m.
• Three-dimensional plate modelling of VTEM preliminary
data was Kate Hine at Mitre Geophysics.
• VTEM anomalies were modelled with industry standard
Maxwell EM software – utilizing thin conductor plate
scenarios for various, most relevant EM channel windows.
VTEM final data was imported into Maxwell EM software
using Geosoft/oasis database files. Resultant model
scenarios for each of the five areas were exported to both
Criteria JORC Code explanation Commentary
there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of detailed
information.
3D DFX and GIS plan view formats to aid follow-up ground
EM optimization and consideration.
• Rockchipsampleswerecollectedbyselectingmultiplesmall
chips from each outcrop to produce a representative
sample.
pXRF Analysis / Sampling
• Portable XRF (pXRF) readings were collected using an
Olympus Vanta analyser in 3-beam, Geochem mode.
Measurements were taken on a flat bench-top on
unprepared rock chips (no cutting, grinding or pulverising).
A relatively flat face of each chip was placed under the
analyser nose cap to improve contact and repeatability.
• pXRF results were used for rapidgeochemical screening and
vectoring; they are indicative/qualitative and not a
substitute for laboratory assays.
• Multiple readings were collected on each sample unless
otherwise stated.
• Data collected for 45 seconds for each sample (15 seconds
per beam).
Drilling
techniques
• Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (e.g.
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc).
• No new drilling is reported.
Criteria JORC Code explanation Commentary
Drill sample
recovery
• Method of recording and assessing core and chip sample
recoveries and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
• No new drilling is reported.
Logging • Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
• Whether logging isqualitativeorquantitativeinnature.Core
(or costean, channel, etc) photography.
• The total length and percentage of the relevant intersections
logged.
• No new drilling is reported.
• Detailed field notes were collected for each rock chip
sample.
Sub-
sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter, half or all
core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc
and whether sampled wet or dry.
• Forall sample types,thenature,qualityandappropriateness
of the sample preparation technique.
• Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
• No new drilling is reported.
• No rock chip sub-sampling was conducted.
Criteria JORC Code explanation Commentary
• Measurestakentoensurethatthesamplingisrepresentative
of thein situ material collected, including for instance results
for field duplicate/second-half sampling.
• Whether samplesizes areappropriatetothegrainsizeof the
material being sampled.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.
• Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (i.e. lack of bias)
and precision have been established.
• Transmitter loop diameter: 35m
• Peak dipole moment – 700,000 NIA
• Transmitter Pulse Width – 7ms
• VTEM Max Receiver – Z, X coils (Y optional)
pXRF
• Primary analytical method: Olympus Vanta Vanta VMR
model 3 Beam GeoChem mode using manufacturer default
beam settings.
• Sample positioning & measurement approach: The analyser
nose cap was held in firm contact with the rock-chip surface
on a stable bench. Multiple readings were collected on each
sample unless otherwise stated.
• Measurement environment (temperature): All
measurements were conducted indoors on a benchtop
underambientconditions.Notemperaturediagnosticswere
monitored.
• Calibration/standardisation: The instrument operated on
factory calibration with no user-applied matrix corrections.
• QAQC: Prior to use, manufacturer-supplied silica blanks
wereanalysedtocheckfor contamination/carry-over andto
confirm instrument function. On an Olympus supplied
Criteria JORC Code explanation Commentary
standard, repeat spot analyses were taken to assess
repeatability. The instrument window and sample contact
area were checked/cleaned between readings as required.
• Data treatment (raw vs corrected): Reported pXRF values
are raw instrument outputs from Geochem mode; no post-
hoc corrections were applied.
• Moisture: Samples were analysed on the bench free of
obvious surface moisture; no drying or other preparation
was undertaken.
• Laboratory assays: pXRF results are preliminary and will be
confirmed by laboratory assays for any material exploration
results reported under the JORC Code.
Verification
of sampling
and assaying
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primarydata,data entryprocedures,data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Data detailed in this report has been reviewed and
processed by Mitre Geophysics.
• pXRF readings are intended as screening data only. No
independent verification of pXRF values has been
undertaken. Laboratory analyses (when completed) will be
used to verify and report significant results.
Location of
data points
• Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings and
other locations used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• The navigation system used was a UTS PC104 based
navigation system utilizing a NovAtel WAAS (Wide Area
Augmentation System) enabled GPS receiver, UTS navigate
software, a full screen display with controls in front of the
pilottodirecttheflightandaNovAtelGPSantennamounted
on the helicopter tail. As many as 11 GPS and two WAAS
satellites may be monitored at any one time. The positional
Criteria JORC Code explanation Commentary
accuracy or circular error probability (CEP) is 1.8m, with
WAAS active, it is 1.0m. The co-ordinates of the block were
set-up prior to the survey and the information was fed into
the airborne navigation system.
• AltitudecontrolusedtheFreeFlightSystemsTRA-3000radar
altimeter with altitude range (40 to 2500ft), altitude
accuracy(40to100 ft.±5ft.,100 to500 ft.±5%,500 to2500
ft. ±7%) and sample rate of 10Hz.
• Co-ordinates are in GDA94 datum, Zone 53.
• AhandheldGPSwasusedrockchipsamplelocations withan
accuracy of ±3m.
Data spacing
and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• The full EL 32279 was flown at 200m line-spacing with a
central 40% of the survey flown at 100m infill line-spacing.
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this
is known, considering the deposit type.
• If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
• Flight lines were orientated northwest - southeast to run
perpendicular to most of the structures and geology of the
area.
Criteria JORC Code explanation Commentary
haveintroducedasamplingbias,thisshouldbeassessedand
reported if material.
Sample
security
• The measures taken to ensure sample security. • All data was collected under strict security measure by UTS
Geophysics Pty Ltd.
Audits or
reviews
• The results of any audits or reviews of sampling techniques
and data.
• Data checks and processing reviews were undertaken daily
and at the completion of the program by the contractor.
• Review of the data was undertaken by an independent
consultant Mitre Geophysics.
JORC Code, 2012 Edition – Table 1 report
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral
tenement
and land
tenure status
• Type, reference name/number, location and ownership
including agreements or material issues with third parties
such as joint ventures, partnerships, overriding royalties,
native title interests, historical sites, wilderness or national
park and environmental settings.
• The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to
operate in the area.
• Tenement includes Oonagalabi (EL32279) for a total of
145.3km2 and 46 sub-blocks.
• EL32279 is owned by Kalk Exploration Pty. Ltd., a 100%
ownedentityofLitchfieldMinerals Limited. Thetenement is
located approximately 125km northeast of Alice Springs on
pastoral leases.
• The tenement is in good standing and there are no known
impediments.
Exploration
done by
other parties
• Acknowledgment and appraisal of exploration by other
parties.
• A summary of previous EL32279 exploration and mining is
presented below:
• Oonagalabi was discovered in the 1930’s.
• In 1970, Russgar Minerals completed regional mag-rad
survey, VLF_EM survey, ground magnetic survey, single line
resistivity traverse and 14 drillholes.
• In 1971, Geopeko completed limited IP.
Criteria JORC Code explanation Commentary
• 1979, Amoco completed photo-interpretation, rock chip
sampling and drilling (8 holes).
• 1981 D’Dor Mining NL completed limited dipole-dipole IP.
• Between 1990 – 1996 on EL 6940 Clarence River Finance
Group explored for garnet in the Florence and Maud Creeks,
collecting 15 samples that averaged 4.4% garnet
• Between 1997 – 2000 on EL 9420 Clarence River Finance
Group completed garnet exploration north of Oonagalabi
EL32279. In 2007, ML 22624 was applied for to cover the
centralOonagalabidepositandsurroundingproximalalluvial
systems (outside 2025 bulk sampling area). No work was
completed and the ML was relinquished in 2019.
• Silex 2009 completed pole-dipole IP 1 x diamond hole.
Geology • Deposit type, geological setting and style of mineralisation. • The Oonagalabi-type mineralisation is considered to be
either skarn-related, sediment-hosted or carbonate
replacement with potential for high-grade remobilised
breccia zones similar to the Jervois deposit. EL32279 falls
within one of Geoscience Australia’s IOCG high potential
zones.
Criteria JORC Code explanation Commentary
• The project lies within the Harts Range that represents a
package of multiply deformed and metamorphosed
sedimentary and igneous intrusive rock.
Drill hole
Information
• A summary of all information material to the understanding
of the exploration results including a tabulation of the
following information for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• Iftheexclusionofthisinformationisjustifiedonthebasisthat
the information is not Material and this exclusion does not
detract fromtheunderstandingof thereport,theCompetent
Person should clearly explain why this is the case.
• No new drilling reported.
Data
aggregation
methods
• In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations
(e.g. cutting of high grades) and cut-off grades are usually
Material and should be stated.
• No aggregation methods were used.
Criteria JORC Code explanation Commentary
• Where aggregate intercepts incorporate short lengths of
high grade results and lo