Litchfield Minerals Limited (ASX: LMS) (“Litchfield” or “the Company”) is pleased to report modelling results from
recently completed Ground EM surveys at the Oonagalabi Project, Northern Territory.
LMS.ASX
Highlights:
• Ground EM at VT1 has defined six conductor plates, two of which have very high conductance of 1,500S
and 3,000S.
• Mapping at VT1 has identified a 1km long Oonagalabi-type carbonate unit that is coincident with the five
strongest modelled ground EM plates.
• Ground EM at VT2 validates existing downhole EM Data & confirms a +400m long, moderate 80S
conductive zone.
• IP chargeability data at VT2 has defined a moderately chargeable IP anomaly 135m southeast of the
modelled plates and Cu-Zn mineralised intercepts.
• Structural mapping at VT1 indicates that mineralisation is localised at the intersection of ENE and WNW-
trendingstructures.
• VTEM conductors are all adjacent to, or coincident with, intrusive-related magnetic anomalies, opening
a new range of exploration targets, particularlyin the northeast of the project (Figure 1).
ASXANNOUNCEMENT– 12th January2026
Managing Director’s Comment
“These results continue to strengthen our conviction that Oonagalabi represents a large, well-preserved mineral
system, with the work completed to-date only scratching the surface. The close spatial relationship between
high-conductance EM plates, intrusive-related magnetic features and confirmed copper-zinc sulphide
mineralisation reinforces our view that we are sitting high in the system, with significant potential remaining at
depth.
What is particularly compelling is that multiple conductors across the project remain completely blind at surface,
often beneath rugged terrain with limited outcrop. The success of ground EM at both VT1 and VT2 has
demonstrated that we now have some of the geophysical tools required to see through this cover and directly
target sulphide accumulations, rather than relying on surface expression alone.
Importantly, the identification of very high-conductance plates at VT1, together with the newly mapped 1km
Oonagalabi style carbonate unit and the emergence of new chargeability anomalies adjacent to known
mineralisation at VT2, highlights the potential for thicker, more sulphide-rich zones at depth within these
intrusive units.
LMS.ASX
Looking ahead, 2026 will be focused on opening up this next level of the system. Our exploration strategy will
increasingly incorporate deeper-penetrating geophysical techniques and targeted drilling designed to test
beneath the known mineralisation and into areas that have historically been inaccessible due to terrain and cover.
At the same time, we will continue to advance drilling at the Oonagalabi Main Zone, VT1 & VT2 & Bomb Diggity
to expand the near-surface footprint. Induced Polarisation surveys will also be used to trace and test the
Oonagalabi carbonate unit to the southwest. This work is aimed at building on our current geological
understanding while delivering drilling results that enhance the scale and continuity of near-surface
mineralisation.
We believe this dual-track approach, growing the Main Zone footprint while aggressively testing for deeper
anomalies across the broader system, positions Litchfield to materially advance Oonagalabi and demonstrate the
full-scale potentialof the project.”
Figure1. TMI RTP magnetic image of EL32279 showing the main prospects and VTEM conductor targets.
LMS.ASX
VT1 Ground EM
Four Fixed Loop EM surveys (FLEM, 384 stations) were completed at the VT1 prospect to confirm the orientation
and conductivity of the original airborne EM conductors (Figure 2). The survey defined six conductors ranging in
strike length from 30m to 80m and with conductance of 200S to a very strong 3,000S. Modelling shows that
the disseminated sulphide mineralisation in OGRC012 is located 50m to the north of the three new modelled
plates (Figure 3).
Two of the modelled plates south of OGRC012 have very strong conductance of 1,500S and 3,000S and are
strong candidates for semi-massive and massive sulphide mineralisation. The two longer plates in the middle of
the prospect are more laterally-extensive and mapped gossan at surface immediately to the east indicates that
these lower conductance plates (200S) are also likely related to sulphide mineralisation. A small, 400S plate has
also been modelled in the middle of the prospect immediately northof the northern structural zone.
Figure2. VT1 fact mapping showing the location of modelled ground EM plates at the intersection of WNW-trending cross-structures and
an ENE-trending carbonate unit.
LMS.ASX
VT1 Geological Mapping
Geological mapping at VT1 (Figure 2) has identified a laterally continuous carbonate unit that is directly
comparable to the mineralised unit at the Oonagalabi Main Zone. This unit can be traced for almost one
kilometre across the prospect and is interpreted as equivalent to the Oonagalabi Formation, which hosts
disseminated sulphide mineralisation at the Oonagalabi Main Zone. This raises the potential for a second
Oonagalabi Style Main Zone to the south. A Pole-Dipole Induced Polarisation survey (PDIP) will be completed in
the first quarterto further refine drillhole targets.
The unit comprises a coarse-grained marble up to 3m thick that is locally gossanous immediately west of the
central modelled plates. Structural mapping indicates a strongly folded central zone (WNW fold axes) that is
bound by well-developed, east-northeast-trending structural zones to the north and south. The southern
structural zone is marked by a laterally continuous crackle breccia with calc-silicate altered breccia matrix
(Figure 3).
Drilling at VT1 will initially target the higher-conductance plates identified by ground EM, followed by testing
any IP chargeabilityanomalies within the prospect.
Figure 3. Schematic cross-section, associated with VT1, showing the OGRC012 disseminated mineralised intercept relative to the
outcropping carbonate unit and the modelled ground EM plates (looking south).
1ASX Announcement – 17 October 2025 - Disseminated to massive sulphides intersected at Oonagalabi
LMS.ASX
VT2GroundEM
A single fixed loop ground EM survey (FLEM, 120 stations) was completed at the VT2 prospect to improve
modelling confidence of the conductor and to assess potential for depth extensions beyond the DHEM models
(Figure 4). The EM data show a robust, laterally extensive conductive zone that is very similar in geometry and
conductance to the DHEM and VTEM models. Data resolved into four modelled plates: the main plate has a
strike length of approximately 400m and a conductance of 80S, a central high conductance plate approximately
200m long (800S) and two smaller central plates with 50m strikes and conductance of 5S0 to 500S. All modelled
plates plunge gently (<15°) to the southwest.
The results from the recent RC drilling1 has confirmed the presence of amphibolite-hosted phyrrhotite-
chalcopyrite-sphalerite sulphide mineralisation in OGRC011 and OGRC019 and confirms that EM is an excellent
geophysical tool to identify VT2-type sulphide mineralisation. The data also confirms that the VT2 target has a
maximum vertical extent of 100m, starting approximately 150m below surface (Figure5).
Figure 4. VT2 IP Chargeability 2D Inversion section 96925E showing the newly identified +15mV/V anomaly approximately 135m to the
southeast of the modelled ground EM plates and the two main sulphide intercepts in OGRC011 and OGRC019. Note laboratory assays
pending for OGRC019, Cu-Zn grade is currently only based on visual geological logging estimates.
LMS.ASX
All five of the strongest VTEM conductor at the project sit adjacent to, or are coincident with, magnetic
anomalies that have been shown through 3D inversion modelling to be vertically extensive and most likely related
to amphibolite intrusions. Drilling at VT2 has confirmed that Cu-Zn mineralisation is hosted within amphibolite
intrusions and is associated with strong magnetic anomalies caused by both magmatic magnetite and
hydrothermal pyrrhotite mineralisation. These observations open-up a wide range of potential new targets in the
northeast of the project (e.g., VT6, VT4, VT17, VT13, VT5 and others to the east, Figure 1) beyond the carbonate-
hosted sulphide mineralisation within the Oonagalabi Main Zone.
VTEM data is effective to depths of approximately 250m, with exploration results to date indicating that current
work is testing the upper levels of a large mineral system. Additional geophysical surveys are planned during
2026 around the margins of the magnetic intrusions to model the system at depth and further refine drill
targeting.
Figure 5. VT2 IP Chargeability 2D Inversion section 96925E showing the newly identified +15mV/V anomaly approximately 135m to the
southeast of the modelled ground EM plates and the two main sulphide intercepts in OGRC011 and OGRC019. Note laboratory assays
pending for OGRC019, Cu-Zn grade is currently only based on visual geological logging estimates.
LMS.ASX
ExplorationForwardPlan
2026 Exploration will be two-fold. First, we will continue to develop and expand the Oonagalabi Main Zone, with
drilling aimed at growing the near-surface footprint and improving our understanding of controls on grade and
continuity. Second, we will work to geologically “reverse engineer” the broader mineral system, testing the
hypothesis that mineralisation is intrusion-related by integrating the emerging EM–magnetic–structural
relationships, refining the 3D model and then validating those concepts with deeper drilling.
At VT1, we plan to prioritise additional drillholes to target the higher-conductance plates, which are prospective
for more sulphide-rich zones. We also intend to complete IP across VT1, extend coverage to the northeast of
Oonagalabi and to test coincident magnetic anomalies and VTEM conductor picks between VT2 and VT1.
At VT2, we are likely to undertake follow-up drilling to further test the system, including targeted drillholes into
the newly defined chargeability anomalies that we interpret as sulphide-related.
At the Oonagalabi Main Zone, drilling will continue to further define the extent of the thicker (>50m) mineralised
zones. In parallel, Induced Polarisation surveys will be extended to the southwest to define the limits of the
Oonagalabi Formation where it is likely concealed beneath surface cover.
At Bomb Diggity, the large magnetic anomaly will be drill-tested with a 750m diamond hole starting mid-January
as part of a co-funded NTGS Geophysics and Drilling Collaboration grant. DDH1 have been awarded this drill
contract and will arrive on site January 17th.
LMS.ASX
The announcement has been approved by the Board of Directors.
For further information please contact:
Matthew Pustahya
Managing Director
Matthew@litchfieldminerals.com.au
www.litchfieldminerals.com.au
https://twitter.com/Litchfield_LMS
https://www.linkedin.com/company/litchfield-minerals-limited/
Followus on:
CautionaryStatement
This announcement contains forward-looking statements that involve known and unknown risks, uncertainties, and other
factors that may cause actual results, performance, or achievements to differ materially from those expressed or implied.
Such statements include but are not limited to, interpretations of geophysical data, planned exploration activities, and
potential mineralisation outcomes. Visual estimates of mineral abundance and pXRF results should never be considered a
proxy or substitute for laboratory analyses where concentrations of grades are the factors of principal economic interest.
Visual estimates also potentially provide no information regarding impurities or deleterious physical properties relevant to
valuation. Forward-looking statements are based on Litchfield Minerals Limited’s current expectations, beliefs, and
assumptions, which are subject to change in light of new information, future events, and market conditions. While the
Company believes that such expectations and assumptions are reasonable, they are inherently subject to business,
geological, regulatory, and operational risks. Further work, including drilling, is required to determine the economic
significance of any anomalies identified. Investors should not place undue reliance on forward-looking statements.
Litchfield Minerals Limited disclaims any obligation to update or revise any forward-looking statements to reflect events or
circumstancesafter the date of this announcement, except as requiredby law.
AboutLitchfieldMinerals
Litchfield Minerals is a critical mineral explorer, primarily searching for base metals and uranium out of the Northern
Territory of Australia. Our mission is to be a pioneering copper exploration company committed to delivering cost-effective,
innovative and sustainable exploration solutions. We aim to unlock the full potential of copper and other mineral resources
while minimising environmental impact, ensuring the longevity and affordability of this essential metal for future
generations. We are dedicated to involving cutting-edge technology, responsible practices and stakeholder collaboration
drives us to continuously redefine the industry standards and deliver value to our investors, communitiesand the world.
CompetentPerson’sStatement
The information in this announcement relates to Exploration Results and is based on, and fairly represents, information and
supporting documentation compiled by Mr Russell Dow (MSc, BSc Hons Geology), a Competent Person who is a Member of
the Australian Institute of Mining and Metallurgy (AUSIMM) and is a full-time employee of Litchfield Minerals Limited. Mr
Dow has sufficient sampling experience that is relevant to the style of mineralisation and types of deposits under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code). Mr Dow
consents to the inclusion in the Public Report of the matters based on their information in the form and context in which it
appears. With regard to the Company’s ASX Announcements referenced in the above Announcement, the Company is not
aware of any new informationor data that materially affectsthe information included in the Announcements.
LMS.ASX
Appendix1. DrillholeCollarInformation
HoleID Prospect Hole_Type Depth Orig_Grid_ID East North RL Dip Azi_Mag Azi_TN
OGRC007 Oonagalabi RC 96 GDA94_53 485055 7441984 816 -60 142 148
OGRC008 Oonagalabi RC 186 GDA94_53 485066 7442174 812 -80 322 328
OGRC009 BombDiggity RC 278 GDA94_53 486450 7443058 833 -60 142 148
OGRC010 Oonagalabi RC 282 GDA94_53 485397 7442475 846 -60 215 221
OGRC011 VT2 RC 348 GDA94_53 487143 7442126 860 -50 142 148
OGRC012 VT1 RC 174 GDA94_53 482716 7438867 787 -80 174 180
OGRC013 BombDiggity RC 244 GDA94_53 486573 7443226 814 -60 142 148
OGRC014 Oonagalabi RC 288 GDA94_53 485541 7442524 845 -50 234 240
OGRC015 Oonagalabi RC 300 GDA94_53 485141 7442232 811 -50 38 44
OGRC016 Oonagalabi RC 300 GDA94_53 485239 7442293 816 -55 38 44
OGRC017 Oonagalabi RC 300 GDA94_53 485502 7442443 846 -70 288 294
OGRC018 BombDiggity RC 300 GDA94_53 486453 7443455 828 -55 322 328
OGRC019 VT2 RC 304 GDA94_53 487192 7442074 861 -57 149 155
LMS.ASX
JORCCode,2012Edition– Table1 report
Section 1 Sampling Techniques and Data
(Criteriain this section apply to all succeedingsections.)
Criteria JORC Code Explanation Commentary
Sampling techniques •Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the
broad meaning of sampling.
•Include reference to measures taken to ensure
sample representivity and the appropriate calibration
of any measurement tools or systems used.
•Aspects of the determination of mineralisation that
are Material to the Public Report.
•In cases where ‘industry standard’ work has been
done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more
explanation may be required, such as where there is
coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
Ground electromagnetic (EM) survey
•Ground EM data collected by GEM Geophysics and modelling was completed by Kate
Hine at Mitre Geophysics
•Transmitter-receiver geometry: fixed-loop/moving loop
•Transmitter: GeoResults DRTX
•Receiver: EMIT Smartem24
•Sensor: Fluxgate, 3-component (X, Y, Z) B-field
•Loop geometry: Loop 10 (250x250m), Loop 11 (550x300m), Loop 13 (300x200m),
Loop 14 (300x200) and Loop_VT02 (800x800m)
•Current: 70A (Loop 10, 14), 40A (Loop 11, 13), 48A (VT02)
•Turnoff: 1-1.1msec
•Frequency: 2.0833Hz (Loop 10, 14), 5Hz (Loop 11, 13, VT02)
•Channels: 33 channels
•Stacks:256-1024
•Five FLEM surveys were acquired, 4 at VT1 and 1 at VT2
IP Survey
•The IP survey was completed by Fender Geophysics using a GDD GRx8-32 IP receiver
and a GDD Tx4 5 kVA IP transmitter. Data modelling and 3D inversion completed by
Rob Angus at Mitre Geophysics.
•A static pole-dipole configuration was used with a fixed array of 16 x 75m receiver
dipoles along each line. The transmitter pole station spacing was also 75m, offset
37.5m along the survey line from the receiver electrodes. The configuration results in
reading both senses (C>P and C<P) of data. The transmitter coverage was extended by
four stations at the end of each receiver array to obtain additional depth of
investigation over the main area of interest.
•Four lines were completed at VT02 spaced 200m apart. Lines were oriented NW to
SE.
Drilling techniques Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc)
and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by
what method, etc).
•No new drilling reported
Drill sample recovery •Method of recording and assessing core and chip
sample recoveries and results assessed.
•Measures taken to maximise sample recovery and
ensure representative nature of the samples.
•Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
•No new drilling reported
LMS.ASX
Criteria JORC Code Explanation Commentary
•Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
•Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc) photography.
•The total length and percentage of the relevant
intersections logged.
•No new drilling reported
Sub-sampling
techniques and
sample preparation
•If core, whether cut or sawn and whether quarter,
half or all core taken.
•If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
•For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
•Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
•Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
•Whether sample sizes are appropriate to the grain
size of the material being sampled.
•No new drilling reported
Quality of assay data
and laboratory tests
•The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.
•For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining
the analysis including instrument make and model,
reading times, calibrations factors applied and their
derivation, etc.
•Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy (i.e.
lack of bias) and precision have been established.
•No new drilling reported
Verification of
sampling and
assaying
•The verification of significant intersections by either
independent or alternative company personnel.
•The use of twinned holes.
•Documentation of primary data, data entry
procedures, data verification, data storage (physical
and electronic) protocols.
•Discuss any adjustment to assay data.
•No new drilling reported
Location of data
points
•Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches, mine
workings and other locations used in Mineral
Resource estimation.
•Specification of the grid system used.
•Quality and adequacy of topographic control.
•The IP and Ground EM survey stations were located using handheld GPS collected in
GDA94 datum, Zone 53 coordinates ±3m).
•Topographic control has an accuracy of 2m based on detailed satellite imagery
derived DTM or on laser altimeter data collected from aeromagnetic surveys.
LMS.ASX
Criteria JORC Code Explanation Commentary
Data spacing and
distribution
•Data spacing for reporting of Exploration Results.
•Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
and classifications applied.
•Whether sample compositing has been applied.
Ground EM
•VT01_smalll: Survey line spacing was 20-40m with station spacing of 10-40m.
Orientation 335°. Lines were 250m long
•VT01_large: Survey line spacing was 50-100m with station spacing of 25m.
Orientation 335°. Lines were 500m long
•VT02: 7 lines. Survey line spacing was 100m with station spacing of 25-100m.
Orientation 328°. Lines were 700m long
IP Survey
•IP survey lines spaced at 200m at VT2
•Receiver dipoles were 75m long with 75m transmitter stations offset 37.5m along
the line. Orientation of data
in relation to
geological structure
•Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
•If the relationship between the drilling orientation
and the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
•Ground EM survey lines at VT1 were completed perpendicular to the dominant
stratigraphic and structural grain. At VT2, survey lines were completed perpendicular
to modelled VTEM and DHEM plates, however, VT2 is a structural target and so survey
lines are dominantly at an oblique angle to stratigraphy.
•IP Lines at VT2 have the same orientation as ground EM lines. IP chargeability data
indicate that the survey lines were completed perpendicular to the main chargeability
anomaly.
Sample security The measures taken to ensure sample security.
•No new sampling data reported
•All IP and Ground EM data collected and stored in protected databases
Audits or reviews The results of any audits or reviews of sampling
techniques and data.
•Continuous improvement internal reviews of sampling techniques and procedures
are ongoing. No external audits have been performed.
•Raw data was checked and supplied daily by Fender Geophysics and GEM
Geophysics
•Data was subsequently reviewed, processed, and modelled by independent
geophysical consultants Kate Hine and Rob Angus at Mitre Geophysics.
LMS.ASX
JORCCode,2012Edition– Table1 report
Section 2 Reporting of Exploration Results
(Criterialisted in the precedingsection also apply to this section.)
Criteria JORC Code Explanation Commentary
Mineral tenement
and land tenure
status
•Type, reference name/number, location and
ownership including agreements or material issues
with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national park
and environmental settings.
•The security of the tenure held at the time of
reporting along with any known impediments to
•Tenement includes Oonagalabi (EL32279) for a total of 145.3km2 and 46 sub-blocks.
•EL32279 is owned by Kalk Exploration Pty. Ltd., a 100% owned entity of Litchfield
Minerals Limited. The tenement is located approximately 125km northeast of Alice
Springs on pastoral leases.
•The tenement is in good standing and there are no known impediments.
Exploration done by
other parties
Acknowledgment and appraisal of exploration by
other parties.
A summary of previous EL32279 exploration and mining is presented below:
•Oonagalabi was discovered in the 1930’s.
•In 1970, Russgar Minerals completed regional mag-rad survey, VLF_EM survey,
ground magnetic survey, single line resistivity traverse and 14 drillholes.
•In 1971, Geopeko completed limited IP.
•1979, Amoco completed photo-interpretation, rock chip sampling and drilling (8
holes).
•1981 D’Dor Mining NL completed limited dipole-dipole IP.
•Between 1990 – 1996 on EL 6940 Clarence River Finance Group explored for garnet
in the Florence and Maud Creeks, collecting 15 samples that averaged 4.4% garnet
•Between 1997 – 2000 on EL 9420 Clarence River Finance Group completed garnet
exploration north of Oonagalabi EL32279. In 2007, ML 22624 was applied for to
cover the central Oonagalabi deposit and surrounding proximal alluvial systems
(outside 2025 bulk sampling area). No work was completed and the ML was
Geology Deposit type, geological setting and style of
mineralisation.
•The Oonagalabi-type mineralisation is considered to be either skarn-related,
sediment-hosted or carbonate replacement with potential for high-grade remobilised
breccia zones similar to the Jervois deposit. EL32279 falls within one of Geoscience
Australia’s IOCG high potential zones.
•The project lies within the Harts Range that represents a package of multiply
deformed and metamorphosed sedimentary and igneous intrusive rock.
Drill hole Information •A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all
Material drill holes:
•easting and northing of the drill hole collar
•elevation or RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar
•dip and azimuth of the hole
•down hole length and interception depth
•hole length.
•If the exclusion of this information is justified on the
basis that the information is not Material and this
exclusion does not detract from the understanding of
the report, the Competent Person should clearly
explain why this is the case.
•See Appendix 1 for collar and hole orientation data.
•See Figures 1-5 for spatial distribution of drillholes.
LMS.ASX
Criteria JORC Code Explanation Commentary
Data aggregation
methods
•In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade
truncations (e.g. cutting of high grades) and cut-off
grades are usually Material and should be stated.
•Where aggregate intercepts incorporate short
lengths of high grade results and longer lengths of
low grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown in
detail.
•The assumptions used for any reporting of metal
equivalent values should be clearly stated.
•No data aggregation methods used.
•Reported assay intervals used a minimum 0.1% Cu and 0.1% Zn cut-off with a
maximum of 4m of internal dilution below either 0.1% Cu or 0.1% Zn.
Relationship
between
mineralisation
widths and intercept
lengths
•These relationships are particularly important in the
reporting of Exploration Results.
•If the geometry of the mineralisation with respect to
the drill hole angle is known, its nature should be
reported.
•If it is not known and only the down hole lengths are
reported, there should be a clear statement to this
effect (e.g. ‘down hole length, true width not known’).
•Where possible and known the drilling is oriented perpendicular to the lithological
strike and the dominant structural fabric.
•OGRC012 was drilled perpendicular to the dominant stratigraphic and structural
trend at VT1.
•OGRC011 and OGRC019 at VT2 were both drilled perpendicular to the modelled
VTEM and DHEM plates that are interpreted as being parallel to the dominant
structural position. At VT2, the mineralised structure cross-cuts stratigraphy
indicating that the holes were drilled at an oblique angle to stratigraphy.
•No quantitative measurements of mineralised zones/structures exist, and all drill
intercepts are reported as down hole length in metres, true width unknown.
Diagrams •Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should
include, but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.
•See figures within the main body of the announcement.
Balanced reporting •Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting of
both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration
Results.
•All available relevant information is presented.
Other substantive
exploration data
•Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
•See the main body of this report for all pertinent observat