Oonagalabi drilling to Probe Tier-1 Scale Targets
Released
Released
Announcement PDF
ASX Announcement 16th
September 2025
Oonagalabi drilling to Probe Tier-1 Scale Targets with
Gravity, Magne�cs & VTEM Alignment
Key Highlights
• Drilling late September, with up to 14 RC holes / 3,750m across priority targets at
Oonagalabi.
• Bomb Diggity (007P, 008P, 020P) cluster targe�ng rare gravity + magne�cs + VTEM
alignment, near mapped mineralisa�on and strong conduc�vity/chargeability1,2.
• Oonagalabipresents scale & fer�lity,withourprevious drilling of 6,150m-spacedholes
hi�ng mineralisa�on in every hole3.
• Dual-system thesis of both a large SEDEX-style system with a Au-Bi intrusive overprint,
the kind of combina�on that can host mul�ple high-grade domains.
• Targe�ng the dualsystem model with 017P (TrainTrack Fault VTEM, malachite & strong
altera�on), 018P (conduc�ve VTEM core), 019P (southern high-mag trend) and
013P/014P/016P (Au–Bi overprint follow-ups) target mul�ple mineralised corridors.
07P/08P/020P targe�ng Bomb-Diggity and 09P/010P/011P/012P targe�ng large, highly
conduc�ve VTEM anomalies.
Litchfield Minerals Limited (“Litchfield” or “the Company”) is pleased to announce that
prepara�ons for the Phase 2 reverse circula�on (RC) drilling campaign at the Oonagalabi
Project, Northern Territory, are well advanced. The program is designed to test mul�ple high-
priority geophysical and geochemical targets across the Oonagalabi system, with drilling
scheduled to commence in late September 2025.
1
ASX Announcement – 20 May 20225 - Offset gravity anomalies identified at Oonagalabi
2
ASX Announcement – 21 August 2025 - VTEM Survey Uncovers Multiple High PrioritySulphide Targets
3
ASX Announcement – 12 April 2025 - Oonagalabi drilling confirms Broad Sulphide Mineralisation
Managing Director’s Comment
“Each campaign at Oonagalabi reinforces our view that we are dealing with a system of
genuine, poten�ally world-class scale. The key hallmarks are lining up, robust structural
architecture, pervasive altera�on and mineralisa�on, credible energy and fluid drivers, strong
metal tenor and con�nuity, and compelling geophysical signatures.
Scale is best appreciated on the ground, but to frame it: the central Oonagalabi to VT2 fold
corridor we’re tes�ng spans roughly ~4km of folded strike, think Newtown to Sydney CBD
(~4km), South Yarra to Melbourne CBD (~4km), Toowong to Brisbane CBD (~5km) or Subiaco
to Perth CBD (~4km).
In our last program we drilled six holes, each roughly spaced 150m apart, and every hole
intersectedmineralisa�on. Thisis ahighlynotableoutcomeandit’s uncommon foracompany
of our size to own an asset with the scale poten�al of this asset. It also underpins our
investment in VTEM, as systems of this scale and nature o�en host high-grade zones.
OurPhase2RCprogramisthemostcomprehensivetargettes�ngtodate:~80%ofearthworks
arecomplete,six new pads arebuilt andtenof fourteenholes arealreadypermited. Wehave
twelve holes planned across >4km of strike in the Oonagalabi to VT2 corridor and two at VT1,
which if mineralised, have the poten�al to extend the Oonagalabi system to over 10km.
The ‘Bomb Diggity’ cluster will interrogate a geologically rare coincidence of gravity, magne�c
and VTEMconductors atwhat Ibelieveistheheart ofthesystem,whilenorthernandsouthern
step-outs will target strong VTEM conduc�vity, IP chargeability responses, mapped
mineralisa�on, poten�al gold-bearing zones and broader system extensions that have already
been validated in the field.
Collec�vely, the data is poin�ng to a large SEDEX-style architecture poten�ally overprinted by
intrusive-related Au-Bi mineralisa�on, a dual fingerprint consistent with camps capable of
hos�ng mul�ple mineralised domains.
This is a capital-efficient, high-convic�on program designed to answer the big ques�ons
quickly. The drill bit remains the arbiter, should this campaign deliver as an�cipated, we
believe Oonagalabi has the poten�al to evolve into a world-class base-metals discovery. We
are prepared, resourced and ready to get the rig turning later this month.”
Program Summary
• Up to 14 RC drill holes, for a maximum of 3,750m star�ng late September (Figure 1).
• 6 new pads constructed in the past week, targe�ng high-priority anomalies.
• 4 holes to u�lise exis�ng pads from the previous campaign, focused on poten�ally Au-
Bi mineralised magne�c anomalies through the Oonagalabi Forma�on.
• Campaign designedtotest gravity, magne�c andVTEM conductor anomalies, as well as
areas of proven mineralisa�on.
Figure1. BFz30 VTEMconductivity imageshowing thekeyconductivitytargets inpurple,thestratigraphicposition
of the prospective Oonagalabi Formation (blue dashed line) and the location of the planned RC holes (blue collar
and trace).
Targe�ng Strategy & Geological Basis
The Bomb Diggity Cluster (007P, 008P, 020P)
• 008P: This drill hole is designed to penetrate the core of the main magne�c zone at
Bomb Diggity, closely associated with a high gravity response and si�ng at the heart of
the anomaly.
• 007P: Tes�ng a compelling coincident magne�c high, gravity high, and VTEM
conductor - a highly prospec�ve geological signature.
• 020P: Is targe�ng coincident geophysical signature (High Mag + Gravity + VTEM
conduc�vity) 200m south of 007P (Figure 2). The Oonagalabi Forma�on is expected to
be intersected in 20P ±7P and may explain the elevated conduc�vity and gravity in this
area.
Together, these three holes form the “Bomb Diggity cluster” and are considered one of the
most prospec�ve areas of the campaign.
Figure 2. BFz 30 conductivity image (looking northwest) showing magnetic (purple, +0.022 mesh) and gravity
(white, +2.77 SG) three-dimensional inversion models and the Oonagalabi two-dimensional IP chargeability
inversion sections. The Oonagalabi and Bomb Diggity zones are interpreted to sit within a northeast-trending
mineralised structural zone.
VT1 & VT2 Conductors — Targets 009P- 012P
The VT1 and VT2 anomalies are the most pronounced, poten�ally sulphide-bearing features in
the VTEM dataset. Independent review by VTEM specialist Kate Hine of Mitre Geophysics,
supports a high likelihood of a sulphide source. These conductors are both highly conduc�ve
and laterally extensive, with clear poten�al to host high-grade mineralisa�on along strike and
down-dip.
Given our approach to this program is to maintain momentum, all VTEM target holes will be
PVC-cased to enable downhole EM (DHEM) for further target refinement and vectoring.
• VT1 (009P & 010P): VT1 exhibits peak modelled conductance of ~700 S and presents
as a segmented cluster resolved across six plates. We interpret this as conductor
par��oning byfolding and/orfaul�ng. Holes 009Pand010P areposi�onedtointersect
the highest-conductance modelled plates where the Oonagalabi Forma�on is
interpreted to be.
• VT2 (011P & 012P): VT2 resolves cleanly into a single, laterally con�nuous plate with
̴500m of modelled strike and probable depth con�nua�on. Holes 011P and 012P are
designed to test the geometry in two orienta�ons to maximise the probability of
intersec�ng the core of the conductor in this first pass.
Northern Extension – 017P
• This drill hole is posi�oned on the Train Track Fault, originally thought to truncate the
Oonagalabi Forma�on.
• Recent fieldwork demonstrated that the forma�on con�nues on the other side of the
fault, significantly extending the mineralised system.
• 017P will test an elevated conduc�vity anomaly and the extension of the northeastern
IP +20mV/V chargeability anomaly; ground-truthing on 11th of September confirmed
intense altera�on (anthophyllite) and visible malachite (copper carbonate
mineralisa�on) at surface (Figure 3). Surface mineralisa�on and discrete geophysical
anomalies at depth make 17P a compelling drillhole target.
Figure 3. Malachite (copper carbonate) was observed immediately below the collar of hole 017P (485972E,
7442671N, 829RL), occurring as staining within anthophyllite alteration over a 2m section of outcrop, with an
estimated visual grade of ~2% Cu.
Note: Visual estimates of mineral abundance should never be considered a proxy or substitute
for laboratory analyses where concentrations of grades are the factors of principal economic
interest. Visual estimates also potentially provide no information regarding impurities or
deleterious physical properties relevant to valuation.
Magne�c Overprint (Gold) Zone – 013P, 014P, 016P
• With these holes, we are ensuring that our follow-up drilling provides data across a strong
magne�c anomaly where the Company previously intersected gold and bismuth
mineralisa�on overprin�ng Cu-Zn mineralisa�on (OGRC002, 15m @ 0.45 g/t Au, 0.17% Bi
from 55m).
• These holes are also designed to test for wider intercepts and con�nuity of this Au-Bi
mineralised zone (Figure 4).
Conduc�ve Oonagalabi Zone – 018P
• The drill hole targets higher conduc�vity zones within the Oonagalabi Forma�on
proximal to, but untested by historic drilling.
• This area exhibits strong altera�on, abundant mineralisa�on, and excellent geological
se�ng, shaping up as one of the strongest drill-ready holes in the program.
Figure4. Magnetic (purple, +0.022 mesh) and gravity (white, +2.77 SG) three-dimensional inversion models
overlayed with BFz 30 VTEM Conductivity with the Oonagalabi two-dimensional IP chargeability inversion
sections).
Southern High Magne�c Zone – 019P
• This hole will test a southern magne�c anomaly where surface mapping iden�fied
magne�te-rich rocks.
• Thesearesimilartothoseassociatedwithhigher-gradegoldandbismuthmineralisa�on
encountered in the last drilling campaign (OGRC002).
• The target area also shows strong surface copper mineralisa�on, altera�on, and
extensive Oonagalabi Forma�on outcrop.
Historic Copper Zone – 015P
• This hole is deliberately situated in an area that historically delivered the highest-grade
copper assays from both Litchfield’s and earlier drilling efforts.
• Strong coincident conduc�vity (resis�vity low) and IP chargeability anomaly, with
poten�al to deliver a significant mineralised intercept.
Geological Context
The Oonagalabi system sits on a major structural thrust linked to the Irindina Province,
providing the architecture for a large-scale mineral system. Recent mapping and drilling have
extended the Oonagalabi outcrop continuously to ~2.5km, including a newly recognised zone
north of the “train-track” fault within the Oonagalabi Formation and to potentially over 10km
if extended down to the VT1 target.
On current evidence, Oonagalabiis best interpretedas aSEDEX-stylesystemgivenits footprint
andstratigraphicposition,however,thenearby“BombDiggity”magneticanomalyleavesopen
the possibility of intrusion-related overprinting (Au-Bi mineralisation).
Our last campaign confirmed gold and bismuth overprints4
within the broader Cu-Zn system.
We interpret these as linked to the Bomb Diggity anomaly, a potential intrusive-related
hydrothermal driver capable of focusing mineralisation along the existing structural
framework. Thisdualsignature(SEDEXarchitecturewithintrusiveoverprint)isahallmarkseen
in several Tier-1 systems and forms a compelling thesis for Phase 2 drilling.
4
ASXAnnouncement–20 May 20225 - https://api.investi.com.au/api/announcements/lms/ad2d741a-8b2.pdf
Earthmoving and Site Works
• Earthmoving ac�vi�es are now ~80% complete, with six new pads constructed and
addi�onal historical pads re-opened (Figure 5).
• The Company expects earthworks to be fully complete ahead of drill rig mobilisa�on in
late September 2025.
Figure 5. Drill pad 19P (looking northwest, 485048E, 7442002N, 821RL) towards massive hills of outcropping
Oonagalabi formation in the foreground to the Harts Range in the background.
Permi�ng – VT1 and VT2 Approvals
• 10 of 14 drill holes are already fully permited, with the remaining 4 holes (9P, 10P, 11P,
12P), targe�ng the VT1 and VT2 conductor anomalies, required a new Environmental
Mining Licence (EML) permit as they fell outside of previously approved programs.
• The day these anomalies were iden�fied in preliminary data, Litchfield submited its
applica�on. The statutory 15-business-day exposure period has now concluded, with
the Department and Litchfield having reached agreement on bonding, water
management, and flora and fauna requirements.
• The applica�on is now awai�ng final sign-off from the Environmental Department,
which the Company an�cipates within the next 7 days.
Next Steps
• Mobilisa�on of RC rig to site in late September 2025.
• Drilling to commence at Bomb Diggity and northern extension targets.
• Ongoing environmental permi�ng for remaining holes (VT1 & VT2) expected
imminently.
• Prepare tracks and pads for the VT1 and VT2 conductor drillholes.
Cautionary Statement
This announcement contains forward-looking statements that involve known and unknown
risks, uncertainties, and other factors that may cause actual results, performance, or
achievements to differ materially from those expressed or implied. Such statements include
but are not limited to, interpretations of geophysical data, planned exploration activities, and
potential mineralisation outcomes. Visual es�mates of mineral abundance and pXRF results
should never be considered a proxy or subs�tute for laboratory analyses where concentra�ons
of grades are the factors of principal economic interest. Visual es�mates also poten�ally
provide no informa�on regarding impuri�es or deleterious physical proper�es relevant to
valua�on. Forward-looking statements are based on Litchfield Minerals Limited’s current
expectations, beliefs, and assumptions, which are subject to change in light of new
information, future events, and market conditions. While the Company believes that such
expectations and assumptions are reasonable, they are inherently subject to business,
geological, regulatory, and operational risks. Further work, including drilling, is required to
determine the economic significance of any anomalies identified. Investors should not place
undue reliance on forward-looking statements. Litchfield Minerals Limited disclaims any
obligation to update or revise any forward-looking statements to reflect events or
circumstances after the date of this announcement, except as required by law.
About Litchfield Minerals
LitchfieldMineralsisacri�calmineralexplorer,primarilysearchingforbasemetalsanduranium
out of theNorthernTerritoryof Australia. Our missionis tobeapioneering copperexplora�on
company commited to delivering cost-effec�ve, innova�ve and sustainable explora�on
solu�ons. We aim to unlock the full poten�al of copper and other mineral resources while
minimising environmental impact, ensuring the longevity and affordability of this essen�al
metal for future genera�ons. We are dedicated to involving cu�ng-edge technology,
responsible prac�ces and stakeholder collabora�on drives us to con�nuously redefine the
industry standards and deliver value to our investors, communi�es and the world.
The announcement has been approved by the Board of Directors.
For further informa�on please contact:
Mathew Pustahya
Mathew@litchfieldminerals.com.au
Follow us on:
www.litchfieldminerals.com.au
htps://twiter.com/Litchfield_LMS
htps://www.linkedin.com/company/litchfield-minerals-limited/
Competent Person’s Statement
The informa�on in this announcement relates to Explora�on Results and is based on, and fairly
represents, informa�on and suppor�ng documenta�on compiled by Mr Russell Dow (MSc, BSc
Hons Geology), aCompetent Personwho is a Member of the Australian Ins�tute of Mining and
Metallurgy (AUSIMM) and is a full-�me employee of Litchfield Minerals Limited. Mr Dow has
sufficient sampling experience that is relevant to the style of mineralisa�on and types of
deposits under considera�on and to the ac�vity being undertaken to qualify as a Competent
Person as defined in the 2012 Edi�on of the “Australasian Code for Repor�ng of Explora�on
Results, Mineral Resources and Ore Reserves” (JORC Code). Mr Dow consents to the inclusion
in the Public Report of the maters based ontheir informa�on in the form and context inwhich
it appears. With regard to the Company’s ASX Announcements referenced in the above
Announcement, the Company is not aware of any new informa�on or data that materially
affects the informa�on included in the Announcements.
JORC Code, 2012 Edi�on – Table 1 report
Sec�on 1 Sampling Techniques and Data
(Criteria in this sec�on apply to all succeeding sec�ons.)
Criteria JORC Code explana�on Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard measurement
tools appropriate to the minerals under investigation, such
as down hole gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as limiting the
broad meaning of sampling.
• Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of mineralisation that are
Material to the Public Report.
• In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as where
The instruments and parameters used for the VTEM survey are as
follow:
• The VTEM survey was flown by UTS Geophysics Pty. Ltd.
• Heliborne electromagne�c data was acquired with VTEMTM
Max transmiter frequency of 25Hz, loop diameter 35m and
mean terrain clearance height of 35m.
• Line spacing was 200m across the full survey area with the
central 40% of the survey also flown at 100m.
• Three-dimensional plate modelling of VTEM preliminary
data was Kate Hine at Mitre Geophysics.
• VTEM anomalies were modelled with industry standard
Maxwell EM so�ware – u�lising thin conductor plate
scenarios for various, most relevant EM channel windows.
VTEM final data was imported into Maxwell EM so�ware
using Geoso�/oasis database files. Resultant model
scenarios for each of the five areas were exported to both
Criteria JORC Code explana�on Commentary
there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of detailed
information.
3D DFX and GIS plan view formats to aid follow-up ground
EM op�miza�on and considera�on.
• Rockchipsampleswerecollectedbyselec�ngmul�plesmall
chips from each outcrop to produce a representa�ve
sample.
pXRF Analysis / Sampling
• Portable XRF (pXRF) readings were collected using an
Olympus Vanta analyser in 3-beam, Geochem mode.
Measurements were taken on a flat bench-top on
unprepared rock chips (no cutting, grinding or pulverising).
A relatively flat face of each chip was placed under the
analyser nose cap to improve contact and repeatability.
• pXRF results were used for rapid geochemical screening and
vectoring; they are indicative/qualitative and not a
substitute for laboratory assays.
• Multiple readings were collected on each sample unless
otherwise stated.
• Data collected for 45 seconds for each sample (15 seconds
per beam).
Drilling
techniques
• Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (e.g.
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc).
• No new drilling is reported.
Criteria JORC Code explana�on Commentary
Drill sample
recovery
• Method of recording and assessing core and chip sample
recoveries and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
• No new drilling is reported.
Logging • Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
• Whether logging isqualitativeorquantitativeinnature.Core
(or costean, channel, etc) photography.
• The total length and percentage of the relevant intersections
logged.
• No new drilling is reported.
• Detailed field notes were collected for each rock chip
sample.
Sub-
sampling
techniques
and sample
prepara�on
• If core, whether cut or sawn and whether quarter, half or all
core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc
and whether sampled wet or dry.
• Forallsampletypes,thenature,qualityandappropriateness
of the sample preparation technique.
• Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
• No new drilling is reported.
• No rock chip sub-sampling was conducted.
Criteria JORC Code explana�on Commentary
• Measurestakentoensurethatthesamplingisrepresentative
of thein situ material collected, including for instance results
for field duplicate/second-half sampling.
• Whether samplesizes areappropriatetothegrainsizeof the
material being sampled.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.
• Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (i.e. lack of bias)
and precision have been established.
• Transmiter loop diameter: 35m.
• Peak dipole moment – 700,000 NIA.
• Transmiter Pulse Width – 7ms.
• VTEM Max Receiver – Z, X coils (Y op�onal).
pXRF
• Primary analytical method: Olympus Vanta VMR model 3
Beam GeoChem mode using manufacturer default beam
settings.
• Sample positioning & measurement approach: The analyser
nose cap was held in firm contact with the rock-chip surface
onastablebench. Multiplereadingswerecollectedoneach
sample unless otherwise stated.
• Measurement environment (temperature): All
measurements were conducted indoors on a benchtop
under ambient conditions. No temperature diagnostics
were monitored.
• Calibration/standardisation: The instrument operated on
factory calibration with no user-applied matrix corrections.
• QAQC: Prior to use, manufacturer-supplied silica blanks
wereanalysedtocheckfor contamination/carry-over andto
confirm instrument function. On an Olympus supplied
Criteria JORC Code explana�on Commentary
standard, repeat spot analyses were taken to assess
repeatability. The instrument window and sample contact
area were checked/cleaned between readings as required.
• Data treatment (raw vs corrected): Reported pXRF values
are raw instrument outputs from Geochem mode; no post-
hoc corrections were applied.
• Moisture: Samples were analysed on the bench free of
obvious surface moisture; no drying or other preparation
was undertaken.
• Laboratory assays: pXRF results are preliminary and will be
confirmed by laboratory assays for any material exploration
results reported under the JORC Code.
Verifica�on
of sampling
and assaying
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primarydata,data entryprocedures,data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Data detailed in this report has been reviewed and
processed by Mitre Geophysics.
• pXRF readings are intended as screening data only. No
independent verification of pXRF values has been
undertaken. Laboratory analyses (when completed) will be
used to verify and report significant results.
Loca�on of
data points
• Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings and
other locations used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• The naviga�on system used was a UTS PC104 based
naviga�on system u�lising a NovAtel WAAS (Wide Area
Augmenta�on System) enabled GPS receiver, UTS navigate
so�ware, a full screen display with controls in front of the
pilottodirecttheflightandaNovAtelGPSantennamounted
on the helicopter tail. As many as 11 GPS and two WAAS
satellites may be monitored at any one �me. The posi�onal
Criteria JORC Code explana�on Commentary
accuracy or circular error probability (CEP) is 1.8m, with
WAAS ac�ve, it is 1.0m. The co-ordinates of the block were
set-up prior to the survey and the informa�on was fed into
the airborne naviga�on system.
• Al�tudecontrolusedtheFreeFlightSystemsTRA-3000radar
al�meter with al�tude range (40 to 2500�), al�tude
accuracy(40to100 �.±5�.,100 to500 �.±5%,500 to2500
�. ±7%) and sample rate of 10Hz.
• Co-ordinates are in GDA94 datum, Zone 53.
• AhandheldGPSwasusedrockchipsampleloca�ons withan
accuracy of ±3m.
Data spacing
and
distribu�on
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• The full EL 32279 was flown at 200m line-spacing with a
central 40% of the survey flown at 100m infill line-spacing.
Orienta�on
of data in
rela�on to
geological
structure
• Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this
is known, considering the deposit type.
• If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
• Flight lines were orientated northwest - southeast to run
perpendicular to most of the structures and geology of the
area.
Criteria JORC Code explana�on Commentary
haveintroducedasamplingbias,thisshouldbeassessedand
reported if material.
Sample
security
• The measures taken to ensure sample security. • All data was collected under strict security measure by UTS
Geophysics Pty Ltd.
Audits or
reviews
• The results of any audits or reviews of sampling techniques
and data.
• Data checks and processing reviews were undertaken daily
and at the comple�on of the program by the contractor.
• Review of the data was undertaken by an independent
consultant Mitre Geophysics.
JORC Code, 2012 Edi�on – Table 1 report
Sec�on 2 Repor�ng of Explora�on Results
(Criteria listed in the preceding sec�on also apply to this sec�on.)
Criteria JORC Code explana�on Commentary
Mineral
tenement
and land
tenurestatus
• Type, reference name/number, location and ownership
including agreements or material issues with third parties
such as joint ventures, partnerships, overriding royalties,
native title interests, historical sites, wilderness or national
park and environmental settings.
• The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to
operate in the area.
• Tenement includes Oonagalabi (EL32279) for a total of
145.3km2 and 46 sub-blocks.
• EL32279 is owned by Kalk Explora�on Pty. Ltd., a 100%
owneden�tyof LitchfieldMinerals Limited. Thetenement is
located approximately 125km northeast of Alice Springs on
pastoral leases.
• The tenement is in good standing and there are no known
impediments.
Explora�on
done by
other par�es
• Acknowledgment and appraisal of exploration by other
parties.
• A summary of previous EL32279 explora�on and mining is
presented below:
• Oonagalabi was discovered in the 1930’s.
• In 1970, Russgar Minerals completed regional mag-rad
survey, VLF_EM survey, ground magne�c survey, single line
resis�vity traverse and 14 drillholes.
• In 1971, Geopeko completed limited IP.
Criteria JORC Code explana�on Commentary
• 1979, Amoco completed photo-interpreta�on, rock chip
sampling and drilling (8 holes).
• 1981 D’Dor Mining NL completed limited dipole-dipole IP.
• Between 1990 – 1996 on EL 6940 Clarence River Finance
Group explored for garnet in the Florence and Maud Creeks,
collec�ng 15 samples that averaged 4.4% garnet.
• Between 1997 – 2000 on EL 9420 Clarence River Finance
Group completed garnet explora�on north of Oonagalabi
EL32279. In 2007, ML 22624 was applied for to cover the
centralOonagalabidepositandsurroundingproximalalluvial
systems (outside 2025 bulk sampling area). No work was
completed and the ML was relinquished in 2019.
• Silex 2009 completed pole-dipole IP 1 x diamond hole.
Geology • Deposit type, geological setting and style of mineralisation. • The Oonagalabi-type mineralisa�on is considered to be
either skarn-related, sediment-hosted or carbonate
replacement with poten�al for high-grade remobilised
breccia zones similar to the Jervois deposit. EL32279 falls
within one of Geoscience Australia’s IOCG high poten�al
zones.
• The project lies within the Harts Range that represents a
package of mul�ply deformed and metamorphosed
sedimentary and igneous intrusive rock.
Criteria JORC Code explana�on Commentary
Drill hole
Informa�on
• A summary of all information material to the understanding
of the exploration results including a tabulation of the
following information for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• Iftheexclusionofthisinformationisjustifiedonthebasisthat
the information is not Material and this exclusion does not
detract fromtheunderstandingof thereport,theCompetent
Person should clearly explain why this is the case.
• No new drilling reported.
Data
aggrega�on
methods
• In reporting Exploration Results, weighting averaging
techniques, maxi
Share your feedback
Discover