91m @ 0.9% Cu and 1.3% Zn Confirmed at Oonagalabi
Released
Released
Announcement PDF
ASX Announcement 17th
November 2025
91m @ 0.9% Cu and 1.3% Zn Confirmed at Oonagalabi,
Reinforcing Large-Scale Cu–Zn System
Highlights
• Drillhole OGRC010 intersected a total of 91m of robust combined copper-zinc mineralisation
@ 0.9% Cu and 1.3% Zn from 8m across four intercept ranges.
• Main Zone is emerging as a potential large, continuous copper–zinc system.
• New Magnetic Inversion data reveal a large interpreted intrusive body extending >900m deep
on the crustal-scale terrane boundary.
• VTEM conductors are coincident with magnetics and sit directly on structural corridors.
• Northern corridor shaping up as the primary growth engine for proximal system discovery.
• Drillinghasrestarted, nextholestestareasof MainZone,BombDiggityandthe VT2conductor.
• Company advancing towards deeper geophysics and diamond drilling in 2026 to better
understand the growth potential.
Litchfield Minerals Limited (ASX: LMS) is pleased to report certified laboratory assays from RC
holeOGRC010 (“Hole 10”), drilled into the Oonagalabi Main Zone, confirming four thick copper–zinc
intervals from near-surface.
Table 1. OGRC010 drillhole collar details.
Oonagalabi Main Zone
OGRC010 intersected a combined copper-zinc over four mineralised zones, totalling 91m @ 0.9% Cu,
1.3% Zn, 0.1% Pb, 7g/t Ag, 0.1g/t Au from 8m depth, including:
• 37m @0.9%Cu,1.8%Zn,0.1%Pb, 9g/tAg, 0.1g/tAu from7m, including15m @1.3% Cu,1.5%
Zn, 0.2% Pb, 11g/t Ag, 0.1g/t Au from 8m;
• 27m @ 0.5% Cu, 0.9% Zn, 0.1% Pb, 6g/t Ag, 0.1g/t Au from 99m;
• 22m @ 1.3% Cu, 0.9% Zn, 0.0% Pb, 7g/t Ag, 0.1g/t Au from 143m; and
• 5m @ 0.9% Cu, 1.1% Zn, 0.1% Pb, 4g/t Ag, 0.1g/t Au from 174m.
This mineralised zone, from near surface, provides compelling evidence for the scale, continuity and
economic potential of the Oonagalabi Main Zone. All mineralisation is hosted within calc-silicate
HoleID Hole_Type Depth Grid_ID East North RL Dip Azi_Mag TN_Azi
OGRC010 RC 286 GDA94_53 485384 7442461 851 -60 215 221
alteration and marble of the Oonagalabi Formation, comprising of semi-massive to massive olivine-
amphibole-pyroxene-phlogopite alteration and disseminated chalcopyrite, sphalerite and pyrrhotite.
The four reported intervals represent mineralised zones of the Oonagalabi Formation that has been
complexly folded within the Oonagalabi Main Zone to produce a wide and deep zone of Cu-Zn
mineralisation (Figures 1 and 2).
The Main Zone forms part of a carbonate-replacement system that outcrops continuously for 1.5km
overtheMainZoneandcanbetraceddiscontinuouslyforapproximately3kmalongstrike. Weinterpret
the Oonagalabi Main Zone as a potential distal alteration and mineralisation position to a larger
intrusive-driven system, with blind VTEM and magnetic targets to the north and south considered
potential proximal positions.
Key points:
• Extensive skarn/carbonate-replacement system with strong sulphide development.
• Interpreted as distal leakage from a much larger intrusive hydrothermal system.
• Provides a reliable base-case mineralised envelope upon which further higher-grade
mineralisation is presenting itself.
• VTEM + magnetics now interpret potential proximal intrusions beyond the outcropping zone.
Figure 1. 200m IP chargeability depth slice and Google Satellite imagery of the Oonagalabi Main Zone showing
the location of the completed Phase 2 RC drillholes relative to Phase 1 RC collars and historical drillholes. The
outcropping Oonagalabi Main Zone is spatially related to the western chargeability anomaly while the eastern
zone is mostly blind with limited surface exposure.
Figure 2. Drillhole cross section showing the four main mineralised zones within OGRC010 with a combined length
of 91m (looking southeast, 20m section window).
New Magnetic Inversions define further interpreted intrusions
Newly processed 3D magnetic inversions from the VTEM survey (200m line spacing) define a coherent
corridor of large magnetic anomalies stepping from the Aileron–Irindina terrane boundary into the
Oonagalabi domain (Figure 3). This province-scale contact is a prime structural pathway, and the
interpreted intrusions have clearly exploited this zone of crustal weakness.
The anomalies are interpreted as mafic amphibolite, which host semi-massive to massive sulphides at
VT2 (OGRC011) and disseminated sulphides in the upper sections of Bomb-Diggity holes OGRC009 and
OGRC013. Priority VTEM conductors sit directly on, or immediately adjacent to, the magnetic highs.,
these magnetic highs, demonstrating that the mafic amphibolite intrusions are a central part of the
mineralising engine at Oonagalabi.
Collectively,thisexpandsthefocuswellbeyondthecarbonate-hostedMainZoneanddeliversapipeline
of high-priority targets for 2026, establishing a compelling case for system-scale copper–zinc sulphide
development with material discovery potential.
Key points:
• A large, high susceptibility interpreted intrusive zone has exploited a major zone of crustal
weakness across the structural pathway from the province-scale contact.
• Priority VTEM conductors sit directly on or along the margins of these interpreted intrusions.
• Magnetic body persists beyond 900m depth, far below VTEM’s ~250m reliable imaging depth.
• Evidence mounts for a magmatic-hydrothermal contribution as the potential engine to the
broader Oonagalabi system.
• There is a strong spatial correlation across magnetics, VTEM, IP and drilling.
• These newdatasets provide strong supportfor a large,vertically extensive mineralised system.
• Northern sector of Oonagalabi seen as a primary growth corridor for locating additional
sulphide mineralisation.
• Oonagalabi is emerging as a multi-event, intrusive-driven system with substantial lateral
continuity and significant vertical extent which is needed for large scale systems.
Figure 3. New TMI-RTP magnetic data from the VTEM survey (200m line spacing) highlights a strong correlation
between VTEM conductor targets which have been circled and magnetic anomalies.
Exploration Update
Drilling recommenced on Friday 14th November, targeting an additional five to six holes. The program
aims to refine some interpretation within the Main Zone, test the northern Bomb Diggity zone and to
directly test the VT2 massive sulphide conductor, recently refined by DHEM.
Induced Polarisation (IP) is underway across VT2 and Bomb-Diggity and is scheduled to conclude on
20thNovember2025. Dataprocessingwillruninparallel. Thesurveyisdesignedtomapresistivityand
chargeability responses beneath surface to vector additional sulphide mineralisation and refine key
structural controls, directly informing follow-up targeting at both positions.
Ground EM is scheduled to commence in late November, beginning at VT1 before progressing to VT2
and then into the Bomb-Diggity and surrounding cluster area. The program is designed to refine the
geometry of conductive bodies across these positions and improve our definition of sulphide targets
within each corridor.
Program priorities:
• Refining stratigraphic and structural controls within the Main Zone.
• First direct test of the refined VT2 conductor plate.
• Induced Polarisation and Ground EM to further target Bomb-Diggity, VT1 & VT2.
• Improving geological confidence for 2026 diamond drilling program.
• Increasing definition and resolution across the northern intrusive corridor.
Managing Director’s Comments
“Hole 10 is a standout result for Litchfield. Close to a hundred metres of copper–zinc mineralisation
from near-surface is the kind of intercept that demonstrates real scale and strengthens the case for
Oonagalabi as a significant system. Litchfield views the Main Oonagalabi Zone as the Company’s
valuation foundation and we look forward to refining our exploration across the entirety of the
projected system.
We’ve now confirmed the Main Zone as a large, laterally continuous foundation for value. The new
magnetic inversion is starting to tie everything together, an interpreted major intrusive zone sitting on
major crustal architecture potentially acting as the fluid, heat and metal source for the entire system.
More evidence shows most of the VTEM priority conductors are sitting right on or adjacent to these
magnetic structures and all of these magnetic structures extend far deeper than VTEM can see.
From here, we build upwards, deeper-looking geophysics, diamond drilling, and systematic testing of
the northern corridor. The potential scale is growing and Hole 10 is an important step in revealing it.
Addressing the obvious comparison, the Hole 10 assay results are slightly lower than the previously
released pXRF readings. The earlier pXRF data were collected on the larger green sample bags, while
the laboratory assays are based on the smaller Sample A splits, and variability between these subsets
is expected.
Our pXRF remains a valuable real-time geological tool at the rig, however, it is not designed to replace
certified laboratory assays. On that basis, the Board and management have confirmed that future
marketdisclosuresofgradewillbebasedsolelyonlaboratoryassays,withanypXRFdatausedinternally
to guide logging, interpretations and exploration.”
Cautionary Statement
This announcement contains forward-looking statements that involve known and unknown risks,
uncertainties, and other factors that may cause actual results, performance, or achievements to differ
materially from those expressed or implied. Such statements include but are not limited to,
interpretations of geophysical data, planned exploration activities, and potential mineralisation
outcomes. Visualestimatesofmineralabundance andpXRFresultsshouldneverbe consideredaproxy
or substitute for laboratory analyses where concentrations of grades are the factors of principal
economic interest. Visual estimates also potentially provide no information regarding impurities or
deleterious physical properties relevant to valuation. Forward-looking statements are based on
Litchfield Minerals Limited’s current expectations, beliefs, and assumptions, which are subject to
change in light of new information, future events, andmarket conditions. While the Company believes
that such expectations and assumptions are reasonable, they are inherently subject to business,
geological, regulatory, and operational risks. Further work, including drilling, is required to determine
the economic significance of any anomalies identified. Investors should not place undue reliance on
forward-looking statements. Litchfield Minerals Limited disclaims any obligation to update or revise
any forward-looking statements to reflect events or circumstances after the date of this
announcement, except as required by law.
About Litchfield Minerals
Litchfield Minerals is a critical mineral explorer, primarily searching for base metals and uranium out of
the Northern Territory of Australia. Our mission is to be a pioneering copper exploration company
committed to delivering cost-effective, innovative and sustainable exploration solutions. We aim to
unlockthefullpotentialofcopperandothermineralresourceswhileminimisingenvironmentalimpact,
ensuringthelongevityandaffordabilityofthisessentialmetalforfuturegenerations. Wearededicated
to involving cutting-edge technology, responsible practices and stakeholder collaboration drives us to
continuously redefine the industry standards and deliver value to our investors, communities and the
world.
The announcement has been approved by the Board of Directors.
For further information please contact:
Matthew Pustahya
Matthew@litchfieldminerals.com.au
Follow us on:
www.litchfieldminerals.com.au
https://twitter.com/Litchfield_LMS
https://www.linkedin.com/company/litchfield-minerals-limited/
Competent Person’s Statement
The information in this announcement relates to Exploration Results and is based on, and fairly
represents, information and supporting documentation compiled by Mr Russell Dow (MSc, BSc Hons
Geology), a Competent Person who is a Member of the Australian Institute of Mining and Metallurgy
(AUSIMM) and is a full-time employee of Litchfield Minerals Limited. Mr Dow has sufficient sampling
experience that is relevant to the style of mineralisation and types of deposits under consideration and
to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC
Code). MrDowconsentstothe inclusioninthePublic Report ofthemattersbasedon theirinformation
in the form and context in which it appears. With regard to the Company’s ASX Announcements
referenced in the aboveAnnouncement, the Companyis notaware of any new information or datathat
materially affects the information included in the Announcements.
Appendix 1. OGRC010 1m laboratory assays. Intercepts were calculated using either 0.1% Cu or 0.1% Zn cut-off
withamaximumoffourconsecutivemetresofinternaldilutionbelow0.1%Cu/Zn. Reportedintervalshighlighted
in green.
Hole_ID From To Sample_ID Cu Zn Pb Ag Au Hole_ID From To Sample_ID Cu Zn Pb Ag Au
OGRC010 0 1 A1701 212 624 67 0.4 2 OGRC010 98 99 A1799 5630 5060 404 4.6 32
OGRC010 1 2 A1702 294 1010 59 <0.2 4 OGRC010 99 100 A1800 17800 8390 204 9.4 120
OGRC010 2 3 A1703 238 802 37 0.4 6 OGRC010 100 101 A1801 5460 9310 839 6.6 49
OGRC010 3 4 A1704 486 1450 39 <0.2 3 OGRC010 101 102 A1802 4980 11700 690 5.2 46
OGRC010 4 5 A1705 354 1130 38 0.4 <1 OGRC010 102 103 A1803 2550 3620 2600 11.2 67
OGRC010 5 6 A1706 100 434 27 <0.2 <1 OGRC010 103 104 A1804 3420 4100 3370 12.8 66
OGRC010 6 7 A1707 1310 2640 84 0.4 45 OGRC010 104 105 A1805 2230 3100 1830 5.8 24
OGRC010 7 8 A1708 7120 5240 737 2.4 62 OGRC010 105 106 A1806 5720 7800 2410 10.6 85
OGRC010 8 9 A1709 10800 7790 601 4.4 64 OGRC010 106 107 A1807 3940 12900 1940 7.2 46
OGRC010 9 10 A1710 17600 21400 652 6.6 100 OGRC010 107 108 A1808 4820 6430 3670 9.6 44
OGRC010 10 11 A1711 16400 14900 576 18.4 78 OGRC010 108 109 A1809 4210 3580 1330 5.4 43
OGRC010 11 12 A1712 13400 10900 136 4.2 52 OGRC010 109 110 A1810 2690 5910 970 4.2 29
OGRC010 12 13 A1713 10200 11000 1340 6.4 77 OGRC010 110 111 A1811 2570 4990 820 4.6 39
OGRC010 13 14 A1714 9440 14700 2090 11 86 OGRC010 111 112 A1812 9060 10100 287 6.2 64
OGRC010 14 15 A1715 10500 17200 1410 9.6 74 OGRC010 112 113 A1813 3320 14100 1000 5.6 49
OGRC010 15 16 A1716 11300 14000 1610 7.4 90 OGRC010 113 114 A1814 2700 16100 923 4 28
OGRC010 16 17 A1717 11100 18800 565 5.2 54 OGRC010 114 115 A1815 2420 5060 1450 5.8 42
OGRC010 17 18 A1718 12900 13200 4250 26.8 135 OGRC010 115 116 A1816 3840 7730 887 5.8 48
OGRC010 18 19 A1719 15400 16700 2290 14.8 117 OGRC010 116 117 A1817 3720 25600 1020 6.6 49
OGRC010 19 20 A1720 10800 23700 1790 11.4 83 OGRC010 117 118 A1818 6350 18700 175 4.6 49
OGRC010 20 21 A1721 16500 12900 2380 21.4 112 OGRC010 118 119 A1819 4680 16400 595 5.6 56
OGRC010 21 22 A1722 12800 17200 1590 11 74 OGRC010 119 120 A1820 2750 4980 934 5 32
OGRC010 22 23 A1723 13800 15000 1030 8.6 70 OGRC010 120 121 A1821 3910 8310 628 4.8 34
OGRC010 23 24 A1724 7240 28100 1250 6.8 51 OGRC010 121 122 A1822 3000 8200 778 5.2 40
OGRC010 24 25 A1725 6060 21100 764 5 39 OGRC010 122 123 A1823 5670 15700 410 5 38
OGRC010 25 26 A1726 5150 19800 804 5 30 OGRC010 123 124 A1824 4130 8150 414 3.8 28
OGRC010 26 27 A1727 5540 39900 559 4.6 29 OGRC010 124 125 A1825 6180 9790 435 5.2 40
OGRC010 27 28 A1728 2160 7140 1470 5.6 42 OGRC010 125 126 A1826 2990 4550 454 2.8 20
OGRC010 28 29 A1729 1950 2150 1220 2.8 19 OGRC010 126 127 A1827 890 614 89 <0.2 <1
OGRC010 29 30 A1730 2360 8440 1890 5.8 33 OGRC010 127 128 A1828 128 296 42 <0.2 <1
OGRC010 30 31 A1731 3350 15400 1000 4 24 OGRC010 128 129 A1829 30 78 17 <0.2 <1
OGRC010 31 32 A1732 1120 30200 438 2 9 OGRC010 129 130 A1830 52 112 11 <0.2 <1
OGRC010 32 33 A1733 4540 22900 221 2.8 18 OGRC010 130 131 A1831 38 94 9 <0.2 <1
OGRC010 33 34 A1734 5880 14100 1800 7.4 50 OGRC010 131 132 A1832 22 72 8 <0.2 <1
OGRC010 34 35 A1735 6050 18900 1520 7.2 50 OGRC010 132 133 A1833 44 142 14 <0.2 <1
OGRC010 35 36 A1736 5430 21200 2020 8 67 OGRC010 133 134 A1834 54 116 8 <0.2 <1
OGRC010 36 37 A1737 6110 17400 3250 11.6 86 OGRC010 134 135 A1835 40 86 10 <0.2 <1
OGRC010 37 38 A1738 3880 8440 5280 13.6 81 OGRC010 135 136 A1836 36 72 15 <0.2 <1
OGRC010 38 39 A1739 6730 9280 3670 15.8 88 OGRC010 136 137 A1837 62 204 51 <0.2 2
OGRC010 39 40 A1740 6480 4400 359 4.6 95 OGRC010 137 138 A1838 68 158 30 <0.2 <1
OGRC010 40 41 A1741 15000 35600 1150 11.6 89 OGRC010 138 139 A1839 124 224 43 <0.2 <1
OGRC010 41 42 A1742 9770 18300 725 6.2 52 OGRC010 139 140 A1840 92 178 23 <0.2 <1
OGRC010 42 43 A1743 10400 34800 604 6.4 58 OGRC010 140 141 A1841 104 164 24 <0.2 <1
OGRC010 43 44 A1744 12600 61500 172 7.2 45 OGRC010 141 142 A1842 62 184 39 <0.2 <1
OGRC010 44 45 A1745 9530 14300 482 5.8 49 OGRC010 142 143 A1843 132 280 86 <0.2 <1
OGRC010 45 46 A1746 962 2060 271 0.4 <1 OGRC010 143 144 A1844 2450 2580 494 1.6 9
OGRC010 46 47 A1747 238 1180 220 <0.2 <1 OGRC010 144 145 A1845 6990 3200 431 4.4 46
OGRC010 47 48 A1748 82 470 151 <0.2 2 OGRC010 145 146 A1846 9350 5700 1550 11.4 91
OGRC010 48 49 A1749 36 194 70 <0.2 <1 OGRC010 146 147 A1847 11800 34500 456 6.4 78
OGRC010 49 50 A1750 70 280 104 <0.2 <1 OGRC010 147 148 A1848 18600 27600 157 8.2 113
OGRC010 50 51 A1751 72 324 66 <0.2 <1 OGRC010 148 149 A1849 12600 14700 288 5.8 75
OGRC010 51 52 A1752 94 298 61 <0.2 <1 OGRC010 149 150 A1850 17700 14000 176 9 111
OGRC010 52 53 A1753 78 154 38 <0.2 <1 OGRC010 150 151 A1851 20500 9240 183 11.2 112
OGRC010 92 93 A1793 94 154 39 <0.2 <1 OGRC010 151 152 A1852 9410 7390 68 4.8 52
OGRC010 93 94 A1794 78 182 39 <0.2 <1 OGRC010 152 153 A1853 20300 10900 74 9.2 122
OGRC010 94 95 A1795 14 244 62 <0.2 <1 OGRC010 153 154 A1854 13300 5470 248 7.2 92
OGRC010 95 96 A1796 60 218 75 <0.2 <1 OGRC010 154 155 A1855 15000 4100 67 6.2 121
OGRC010 96 97 A1797 74 712 41 <0.2 <1 OGRC010 155 156 A1856 21500 5780 74 10.6 128
OGRC010 97 98 A1798 374 276 173 <0.2 <1 OGRC010 156 157 A1857 8550 3950 103 3.4 49
Hole_ID From To Sample_ID Cu Zn Pb Ag Au
OGRC010 157 158 A1858 9020 2990 67 3.8 90
OGRC010 158 159 A1859 18200 6390 201 7.8 135
OGRC010 159 160 A1860 13200 4930 346 5.8 142
OGRC010 160 161 A1861 18100 6130 152 6.6 153
OGRC010 161 162 A1862 16800 6140 456 8 183
OGRC010 162 163 A1863 14100 5720 234 7 129
OGRC010 163 164 A1864 13000 5710 124 5 114
OGRC010 164 165 A1865 5020 2230 89 2 43
OGRC010 165 166 A1866 324 182 45 <0.2 2
OGRC010 166 167 A1867 220 178 39 <0.2 <1
OGRC010 167 168 A1868 338 230 63 <0.2 2
OGRC010 168 169 A1869 216 312 98 <0.2 <1
OGRC010 169 170 A1870 130 154 58 <0.2 <1
OGRC010 170 171 A1871 88 226 81 <0.2 <1
OGRC010 171 172 A1872 160 322 72 <0.2 <1
OGRC010 172 173 A1873 144 238 61 <0.2 <1
OGRC010 173 174 A1874 342 354 106 <0.2 <1
OGRC010 174 175 A1875 4830 8620 1200 3.6 72
OGRC010 175 176 A1876 18200 29000 346 5 155
OGRC010 176 177 A1877 14800 11600 587 5.2 237
OGRC010 177 178 A1878 2660 1230 656 2.6 65
OGRC010 178 179 A1879 3960 2340 313 1.6 62
OGRC010 179 180 A1880 508 524 223 0.6 17
OGRC010 180 181 A1881 1330 16100 3310 5 33
OGRC010 181 182 A1882 748 14300 2230 2.8 27
OGRC010 182 183 A1883 1100 13700 946 1.6 20
OGRC010 183 184 A1884 4230 6630 1550 3 28
OGRC010 184 185 A1885 3890 3230 116 0.8 11
OGRC010 185 186 A1886 2630 2890 317 1 16
OGRC010 186 187 A1887 958 2800 13 <0.2 3
OGRC010 187 188 A1888 200 1070 13 <0.2 2
OGRC010 188 189 A1889 410 1320 16 <0.2 33
OGRC010 189 190 A1890 326 4450 12 <0.2 7
OGRC010 190 191 A1891 1990 3990 37 0.4 60
OGRC010 191 192 A1892 530 2460 564 0.4 3
OGRC010 192 193 A1893 32 302 93 <0.2 <1
OGRC010 193 194 A1894 56 196 25 <0.2 <1
OGRC010 194 195 A1895 8 72 18 <0.2 <1
OGRC010 195 196 A1896 58 352 25 <0.2 <1
OGRC010 196 197 A1897 44 162 23 <0.2 <1
OGRC010 197 198 A1898 40 194 31 <0.2 <1
OGRC010 198 199 A1899 70 212 32 <0.2 <1
OGRC010 199 200 A1900 20 104 21 <0.2 <1
JORC Code, 2012 Edition – Table 1 report
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard measurement
tools appropriate to the minerals under investigation, such
as down hole gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as limiting the
broad meaning of sampling.
• Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of mineralisation that are
Material to the Public Report.
• In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as where
RC Drilling
• Reverse Circulation (RC) was used to obtain samples
collected in a large green bag (for a bulk sample) and a
smaller calico 1m split sample for each metre drilled.
• Chip samples were collected using a sieve for each metre
drilled and retained in a plastic chip tray that were used to
complete geological logging and mineralisation visual
estimates.
• A portable XRF instrument (Olympus Vanta) was used to
assess Cu and Zn levels in green bags for each metre drilled.
• Reported intercepts calculated using a 0.1% Cu cut-off with
maximum 4m internal dilution.
• All samples that exceeded either 0.1% Cu or 0.1% Zn were
selected for individual 1m samples.
• 4m composite samples were collected for all intervals that
did not exceed 0.1% Cu or 0.1% Zn.
Criteria JORC Code explanation Commentary
there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of detailed
information.
• Spear sampling was used to collect 4m composite samples.
• QAQC standards (blank, reference and duplicate) were
included routinely, alternating every 25 samples.
• All samples have been dispatched to Bureau Veritas in
Adelaide for conventional multi-element and fire assay
analysis (see Quality of Assay Data section below for further
details).
VTEM
The instruments and parameters used for the VTEM survey are
as follow:
• The VTEM survey was flown by UTS Geophysics Pty. Ltd.
• Heliborneelectromagnetic datawasacquiredwithVTEMTM
Max transmitter frequency of 25Hz, loop diameter 35m and
mean terrain clearance height of 35m.
• Line spacing was 200m across the full survey area.
Drilling
techniques
• Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (e.g.
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc).
• All holes were completed using the RC drilling technique by
GeoDrill and Stark Drilling using a 5.5’’ face sampling bit.
• All holes were surveyed during drilling using a GyroMaster
north-seeking gyro tool.
Drill sample
recovery
• Method of recording and assessing core and chip sample
recoveries and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• RCsamplerecoverieswerevisuallyestimatedforeachmetre
with poor or wet samples recorded in drill and sample log
sheets. Thesamplecyclonewasroutinelycleanedattheend
of each 6m rod and when deemed necessary.
Criteria JORC Code explanation Commentary
• Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
• No relationship has been determined between sample
recoveries and grade and there is insufficient data to
determine if there is a sample bias.
Logging • Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
• Whether logging isqualitativeorquantitativeinnature.Core
(or costean, channel, etc) photography.
• The total length and percentage of the relevant intersections
logged.
• GeologicalloggingofRCdrillholeswasdoneonavisualbasis
with logging including lithology, alteration, mineralisation,
structure,weathering,oxidation,magneticsusceptibilityetc.
• Logging of RC drill samples is qualitative and based on the
presentation of representative drill chips retained for all 1m
sample intervals in the chip trays.
• All drillholes were geologically logged in their entirety.
• A portable XRF instrument (Olympus Vanta) was used to
facilitate identification of mineralized intervals where visual
mineralisation was difficult to identify.
Sub-
sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter, half or all
core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc
and whether sampled wet or dry.
• Forall sample types,thenature,qualityandappropriateness
of the sample preparation technique.
• Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
• 1m cone split samples were collected for all metres at the
time of drilling from the drill rig mounted cone splitter.
• The sample size is considered appropriate for the
mineralisation style, application and analytical techniques
used.
Criteria JORC Code explanation Commentary
• Measurestakentoensurethatthesamplingisrepresentative
of thein situ material collected, including for instance results
for field duplicate/second-half sampling.
• Whether samplesizes areappropriatetothegrainsizeof the
material being sampled.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.
• Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (i.e. lack of bias)
and precision have been established.
Sampling:
• RCChipsampleswereanalysedforamulti-elementsuite(59
elements)byacombinationofICP-OES(Al,Ba,Ca,Cr,Cu,Fe,
K, Li, Mg, Mn, Na, Ni, P, S, Sc, Ti, V, Zn & Zr) and ICP_MS (Ag,
As, Be, Bi,Cd,Ce, Co,Cs,Dy, Er, Eu, Ga,Gd, Hf,Ho, In, La, Lu,
Mo, Nb, Nd, Pb, Pr, Rb, Re, Sb, Se, Sm, Sn, Sr, Ta, Tb, Te, Th,
Tl, Tm, U, W, Y & Yb) following a multi-acid digest. Assays
for Au were completed by 40g Fire Assay with an AAS finish.
The assay methods used are considered appropriate.
• QAQC standards, blanks and duplicates were routinely
included at a rate of 1 per 25 samples.
• Further internal laboratory QAQC procedures included
internal batch standards and blanks.
VTEM
• Transmitter loop diameter: 35m
• Peak dipole moment – 700,000 NIA
• Transmitter Pulse Width – 7ms
• VTEM Max Receiver – Z,X, coils (Y optional)
Criteria JORC Code explanation Commentary
Verification
of sampling
and assaying
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primarydata,data entryprocedures,data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
RC Sampling
• QAQC duplicate samples were inserted every 75 samples as
part of the routine QAQC sampling procedure.
VTEM
• Data detailed in this report has been reviewed and
processed by Mitre Geophysics.
Location of
data points
• Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings and
other locations used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
RC Drilling
• Drill hole collars are surveyed with a handheld GPS with an
accuracy of +/- 3m which is considered sufficient for drill
hole location accuracy.
• Co-ordinates are in GDA94 datum, Zone 53.
• Downhole depths are in metres measured downhole from
the collar location on surface.
• Topographic control has an accuracy of 2m based on
detailed satellite imagery derived DTM or on laser altimeter
data collected from aeromagnetic surveys.
VTEM
• The navigation system used was a UTS PC104 based
navigation system utilising a NovAtel WAAS (Wide Area
Augmentation System) enabled GPS receiver, UTS navigate
software, a full screen display with controls in front of the
Criteria JORC Code explanation Commentary
pilottodirecttheflightandaNovAtelGPSantennamounted
on the helicopter tail. As many as 11 GPS and two WAAS
satellites may be monitored at any one time. The positional
accuracy or circular error probability(CEP) is 1.8m, with
WAAS active, it is 1.0m. The co-ordinates of the block were
set-up prior to the survey and the information was fed into
the airborne navigation system.
• AltitudecontrolusedtheFreeFlightSystemsTRA-3000radar
altimeter with altitude range (40 to 2500ft), altitude
accuracy(40to100 ft.±5ft.,100 to500 ft.±5%,500 to2500
ft. ±7%) and sample rate of 10Hz.
Data spacing
and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
• Whether sample compositing has been applied.
RC Drilling
• No specific drillhole spacing was used for the Phase 2
program. Individual hole locations were selected based on
specific geological and geophysical targets.
• It is too early to establish if drillhole spacing is sufficient to
establish geological continuity.
• 4m composite samples were completed onintervals that did
not exceed 0.1% Cu or 0.1% Zn in pXRF analysis.
V
Share your feedback
Discover