Litchfield Set for Year-End Drilling Campaign on VTEM, IP & Gravity
Targets
Highlights
• 3D geophysical plate modelling of Priority 1 targets identified by VTEM has been
completed.
• Priority bedrock conductors were modelled on the Silver King, Patmungula Copper &
Lead, Clark and the Anomaly 4 target areas.
• Modelling has given Litchfield the confidence to move forward with Ground EM
surveys to refine drill targets in preparation for drilling in November 2024.
• Topdrill has been contracted to drill up to 2,000m across the Patmungula VTEM
targets the, Mount Irene IP, and Dumunzi Gravity targets, pending the results from
ground surveys.
• Priority has been on modelling data to progress fieldwork and drilling, the modelling
for the remaining priority 2, 3, and 4 conductors is yet to be completed.
Litchfield Minerals Limited (“Litchfield” or the “Company”) (ASX:LMS), a company with a
strategic emphasis on critical minerals, is pleased to announce the completion of VTEM
modelling at the Mt Doreen project.
Managing Director and CEO, Matthew Pustahya, commented:
"We are pleased with the completion of the 3D geophysical plate modelling of the Priority 1
targetsidentifiedintheVTEM surveyatMtDoreen. Thisimportant stephasprovideduswith
the confidence to proceed with ground EM surveys over the Patmungula area to refine drill
targets for our upcoming drilling campaign. Our team remains committed to
efficiently progressing our high-potential targets identified through VTEM, IP & Gravity,
with drilling scheduled to commence in mid-November 2024."
1
Next Steps
Litchfield Minerals is advancing towards a significant exploration phase, with
modelling confirming that the strongest VTEM conductors are located at the Silver
King and two Patmungula anomalies. While previously identified Anomaly 4 and the Clark
Mine conductors are now considered lower priorities, our end of year focus will be
exclusively on these higher-impact targets.
At Silver King, the conductor plates align perfectly with the magnetic body tested during
our initial drill campaign, eliminating the need for further drilling in this area. Instead, all
efforts will be concentrated on the Patmungula anomalies, where Litchfield has engaged
Planetary Geophysics to carry out moving loop ground EM surveys over 10-line
kilometres, which has already commenced.
In addition, Planetary Geophysics will leverage its IP equipment to further refine
the Patmungula Lead target, where negative late-time responses suggest an IP effect. At
Mount Irene, additional pole-dipole IP lines will define the boundaries of a strong
35mV/V chargeability anomaly.
To accelerate our exploration campaigns, Topdrill has been contracted for up to 2,000
metres of RC drilling, set to begin in mid-November 2024. The specific drilling areas
will be determined by the results of the ground MLEM and IP surveys. If everything
proceeds as expected. We aim to complete drilling at the two Patmungula targets, Mount
Irene and the Dumunzi areas this year.
2
Priority 1 VTEM results
Geophysical plate modelling of the five high priority VTEM conductors at the Mt Doreen
project has been completed by Russell Mortimer at Southern Geoscience Consultants.
Detailed modelling identified bedrock conductors at the Silver King, Patmungala Lead and
Patmungala Copper prospects (Figure 1).
Figure 1. Mt Doreen project RTP_SunN_Lin magnetic image showing the location of five high-priority VTEM targets.
Silver King (Anomaly 1)
ModellingindicatesthattheSilver Kinganomalyistheonlytargetthatpersiststhroughtothe
latest time channels (Figure 2). A discrete anomaly is evident on two lines but most
prominent on line L1861. Strong anomalism isdetected in the Z and X component with a less
strong, but detectable, Y component. The anomaly is coincident with the previously
identified
3
Silver Kingmineralisation1. The modellingshowsconsistent resultsfrom channels17 through
to 40and definesa 75mx75m plate witha depthto top of 60 – 100m. Theconductor islikely
discordant, trending almost north-south and steeply dipping (likely to the east), sitting
between VTEM lines L1850 and L1861. The modelled plate is coincident with IP chargeability
and airborne magnetic anomalies and has been adequately tested with drilling (Figure 3).
Figure 2. Silver King VTEM modelled conductive plates in plan and three dimensions.
Mt Doreen VTEM Anomaly 1 (Silver King)
Plan view with Channel 25 Z Component Image
Figure 3. Silver King modelled IP chargeability and magnetic data showing coincidence with modelled conductor plates and
2024 drilling.
4
Patmungala Lead (Anomaly 2)
A short wavelength anomaly superimposed on background decay that turns negative
after channel 29 (Figure 4). Strong anomalism is seen in the Z, X and Y components on
multiple lines including L4930 and L4940. The anomalies appear to be more related to
stratigraphy here, with larger low conductance plates fitting the data best, but not well
in preliminary efforts. Modelling suggests the possibility of a syncline feature or weakly
conductive sub-parallel folded stratigraphy. Negative late times indicates an IP effect. The
Patmungala Lead target is located 400m south of this modelled conductor (Figure 1),
indicating potentially a broader mineral system. The IP effect potentially indicates that this
targetmaycomprisebothsemi-massive/massive and disseminated sulphides.
Figure 4. Patmungala Lead target modelled conductive plates in plan and three dimensions.
Mt Doreen VTEM Anomaly 2
Plan Vview with Channel 25 Z Component Image
5
Patmungala Copper (Anomaly 3)
A short wavelength late-time anomaly superimposed on broad negative late-times (Figure
5). The anomaly is visible in the Z component on VTEM lines L4760 and L4770 from channel
32-38. A weak X component response is detectable in channels 32-36, however, there
is no discernible response in the Y component. Modelling is quite difficult with the
complex background in the Z component and lack of X and Y anomalism. Modelling
suggests a possible small conductor between VTEM lines L4760 and L4770. The model
position moves as the input channel window increases, largely due to the complexity of
the response.
Mt Doreen VTEM Anomaly 3
Plan view with Channel 36 Z Component Image
Figure 5. Patmungala Copper target modelled conductive plates in plan and three dimensions.
6
Anomaly 4
A short wavelength Z component response from channels 20-27, becoming dipolar from
28-35 and negative from 36-38 (Figure 6). No real discernible response was identified in
the X and Y components. A small conductor of ~50m x 50m in size is striking perpendicular
to the flight line and dipping to the south at a depth of 20m below surface with low
conductance of ~18S, hence provides some sort of fit to the Z component but the fit is
poor. Modelling had down-graded this conductor and no further work is anticipated.
Mt Doreen VTEM Anomaly 4
Plan view with Channel 26 Z Component Image
Figure 6. Anomaly 4 modelled conductive plates in plan and three dimensions.
7
Clark Mine (Anomaly 5) A very short wavelength Z component anomaly on VTEM line L1250
from channels 22-30 characterised by noisy decay and no discernible X and Y
component response (Figure 7). Modelling is challenging, with a best fit obtained using a
very small 20m x 20m plate at a depth of ~35m below surface. The model suggests a
conductor, if present, lies between lines L1250 and L1260, but close to 1250.
Figure 7. Clark Mine anomaly modelled conductive plates in plan and three dimensions.
Mt Doreen VTEM Anomaly 5
Plan view with Channel 26 Z Component Image
8
Cautionary Statement
Conductive VTEM targets presented in this announcement have been interpreted to
represent basement conductors relating to semi-massive or massive sulphides, however, it is
unclear if base metal sulphides are present. Ground EM is required to confirm the basement
source and conductor geometry ahead of RC drilling.
Forward looking statement
This announcement may include forward-looking statements, which are subject to risks and
uncertainties. Actual results could differ significantly due to factors beyond LMS’s control,
includingmarketconditionsandindustry-specificrisks.Theseforward-lookingstatementsare
based on the Company’s expectations and beliefs concerning future events No warranty is
given regarding the completeness of the information provided. Please avoid placing undue
reliance on forward-looking statements, as they reflect views only as of the announcement
date.
L Litchfield Minerals is a critical mineral explorer, primarily searching for base metals and
uranium out of the Northern Territory of Australia. Our mission is to be a pioneering copper
exploration company committed to delivering cost-effective, innovative and sustainable
exploration solutions. We aim to unlock the full potential of copper and other mineral
resources while minimising environmental impact, ensuring the longevity and affordability
of this essential metal for future generations. We are dedicated to involving cutting-edge
technology, responsible practices and stakeholder collaboration drives us to continuously
redefine the industry standards and deliver value to our investors, communities and the
world.
The announcement has been approved by the Board of Directors.
9
For further informa�on please contact:
Mathew Pustahya
Mathew@litchfieldminerals.com.au
Follow us on:
www.litchfieldminerals.com.au www.litchfieldminerals.com.au
htps://twiter.com/Litchfield_LMS https://x.com/Litchfield_LMS
htps://www.linkedin.com/company/litchfield-minerals-limited/
Competent Person’s Statement
The informa�on in this Presenta�on that relates to Explora�on Results is based on, and fairly
represents, informa�on and suppor�ng documenta�on compiled by Mr Russell Dow (MSc,
BScHonsGeology),aCompetentPersonwhoisaMemberoftheAustralian Ins�tuteofMining
and Metallurgy (AUSIMM) and is a full-�me employee of Litchfield Minerals Limited. Mr Dow
has sufficient experience that is relevant to the style of mineralisa�on and types of deposits
under considera�on and to the ac�vity beingundertaken to qualify as a Competent Person as
defined in the 2012 Edi�on of the “Australasian Code for Repor�ng of Explora�on Results,
Mineral Resources and Ore Reserves” (JORC Code). Mr Dow consents to the inclusion in the
report of the maters based on his informa�on in the form and context in which it appears.
With regard to the Company’s ASX Announcements referenced in the above Announcement,
the Company is not aware of any new informa�on or data that materially affects the
informa�on included in the Announcements.
Edi�on – Table 1 report
10
JORC Code, 2012 Edi�on – Table 1 report
Sec�on 1 Sampling Techniques and Data
(Criteria in this sec�on apply to all succeeding sec�ons.)
Criteria JORC Code explana�on Commentary
Sampling
techniques
• Nature andquality of sampling(e.g.cutchannels,randomchips,
or specific specialised industry standard measurement tools
appropriate to the minerals under investigation, such as down
hole gamma sondes, or handheld XRF instruments, etc). These
examples should not be taken as limiting the broad meaning of
sampling.
• Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determinationof mineralisation thatare Material
to the Public Report.
• In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other cases more
explanation may be required, such as where there is coarse gold
that has inherent sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules) may warrant
disclosure of detailed information.
The instruments and parameters used for the VTEM survey are as
follow:
• The VTEM survey was flown by UTS Geophysics Pty. Ltd.
• Heliborne electromagne�c data was acquired with
VTEMTM Max transmiter frequency of 25Hz, loop
diameter 35m and mean terrain clearance height of 35m.
• Line spacing was 200m across the full survey area.
• Three-dimensional plate modelling of VTEM data was
completed by Russell Mor�mer at Southern Geoscience
Consultants.
• VTEM primary / High Priority anomalies were modelled with
industry standard Maxwell EM software – utilizing thin
conductor plate scenarios for various, most relevant EM channel
windows. VTEM final data was imported into Maxwell EM
software using Geosoft/oasis database files. Resultant model
scenarios for each of the five areas were exported to both 3D
DFX and GIS plan view formats to aid follow-up ground EM
optimization and consideration.
11
Criteria JORC Code explana�on Commentary
Drilling
techniques
• Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is oriented and if so, by
what method, etc).
• Not applicable as no drilling is reported.
Drill sample
recovery
• Method of recording and assessing core and chip sample
recoveries and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
• Not applicable as no drilling is reported.
Logging • Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
• Whetherloggingis qualitative orquantitative innature.Core (or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections
logged.
• Not applicable as no drilling is reported.
Sub-
sampling
techniques
and sample
preparation
• Ifcore,whethercutorsawnandwhetherquarter,halforallcore
taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of
• Not applicable as no drilling is reported.
12
Criteria JORC Code explana�on Commentary
the sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages
to maximise representivity of samples.
• Measures taken to ensure that the sampling is representative of
the in situ material collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the
material being sampled.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
• Forgeophysicaltools,spectrometers,handheldXRFinstruments,
etc, the parameters used in determining the analysis including
instrument make and model, reading times, calibrations factors
applied and their derivation, etc.
• Nature of quality control procedures adopted (e.g. standards,
blanks, duplicates, external laboratory checks) and whether
acceptablelevelsofaccuracy(i.e.lackofbias)andprecisionhave
been established.
Geophysical details
• Transmiter loop diameter: 35m
• Peak dipole moment – 700,000 NIA
• Transmiter Pulse Width – 7ms
• VTEM Max Receiver – Z, X coils (Y op�onal)
Verification
of sampling
and
assaying
• Theverificationofsignificantintersectionsbyeitherindependent
or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Data detailed in this report has been reviewed and
processed by Mitre Geophysics.
13
Criteria JORC Code explana�on Commentary
Location of
data points
• Accuracy and quality of surveys used to locate drill holes (collar
and down-hole surveys), trenches, mine workings and other
locations used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• The naviga�on system used was a UTS PC104 based
naviga�on system u�lizing a NovAtel WAAS (Wide Area
Augmenta�on System) enabled GPS receiver, UTS navigate
so�ware, a full screen display with controls in front of the
pilot to direct the flight and a NovAtel GPS antenna
mountedon thehelicopter tail. Asmanyas11 GPS and two
WAAS satellites may be monitored at any one �me. The
posi�onal accuracy or circular error probability (CEP) is
1.8m, with WAAS ac�ve, it is 1.0m. The co-ordinates of the
block were set-up prior to the survey and the informa�on
was fed into the airborne naviga�on system.
• Al�tude control used the FreeFlight Systems TRA-3000
radar al�meter with al�tude range (40 to 2500�), al�tude
accuracy(40to100�.±5�.,100to500�.±5%,500to2500
�. ±7%) and sample rate of 10Hz.
Data
spacing and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• The full VTEM survey was flown at 200m line-spacing.
14
Criteria JORC Code explana�on Commentary
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introducedasamplingbias,thisshouldbeassessedandreported
if material.
• Flight lines were orientated north-south to run
perpendicular to most of the structures and geology of the
area.
Sample
security
• The measures taken to ensure sample security. • AlldatawascollectedunderstrictsecuritymeasuresbyUTS
Geophysics Pty Ltd.
Audits or
reviews
• The results of any audits or reviews of sampling techniques and
data.
• Data checks and processing reviews were undertaken daily
and at the comple�on of the program by the contractor.
• Review of the data was undertaken by an independent
consultant Mitre Geophysics.
Sec�on 2 Repor�ng of Explora�on Results
(Criteria listed in the preceding sec�on also apply to this sec�on.)
Criteria JORC Code explana�on Commentary
Mineral
tenement
and land
tenure
status
• Type,referencename/number,locationandownershipincluding
agreements or material issues with third parties such as joint
ventures,partnerships,overridingroyalties,nativetitleinterests,
historical sites, wilderness or national park and environmental
settings.
• The security of the tenure held at the time of reporting along
• Refer to Sec�on 4 in Independent Geologists Report (IGR)
by Ross et al., 2023 for further detail. In summary, the
Mount Doreen project is secured by EL 31305 for total of
approximately 388.35 square kilometres.
15
Criteria JORC Code explana�on Commentary
with any known impediments to obtaining a licence to operate
in the area.
• All tenements within the Mt Doreen are 100% owned by
Litchfield Minerals Ltd.
• The Mt Doreen Project is located 325km northwest of Alice
Springs pastoral lease. The tenements are in good standing
and there are no known impediments.
Exploration
done by
other
parties
• Acknowledgment and appraisal of exploration by other parties. • Refer to Sec�on 6 and 7 in Independent Geologists Report
(IGR) by Ross et al,, 2023 for further detail. A summary of
previous explora�on and mining is presented below:
• 1930- 1956: Minor amounts of copper and tungsten
extracted from Silver King, Clark, Mount Irene and Wolfram
Hill.
• 1969: NT Mines & Water Resources diamond drilling at
Clark workings.
• 1987 – 2006: White Industries/Mareeba Mining, Bruce and
Mules, MIM Explora�on/Roebuck Resources, Track
Minerals, Poseidon Gold/Yuendumu Mining, BHP,
Homestake Gold, Rio Tinto Explora�on and Tanami Gold
completed geological mapping, geochemical sampling,
airborne and ground geophysical surveys, and drilling
programs.
16
Criteria JORC Code explana�on Commentary
Geology • Deposit type, geological setting and style of mineralisation. • Refer to Sec�on 5 in Independent Geologists Report (IGR)
by Ross et al., 2023 for further detail. In summary:
• Mount Doreen is located in the southern por�on of the
Paleoproterozoic Aileron Province of the Arunta Region.
• The oldest rocks at Mount Doreen are the mul�ply
deformedandmetamorphosedsiliciclas�csedimentsofthe
Lander Rock Forma�on. The younger volcano sedimentary
Patmungala Bedslie inthe south of the tenement,andboth
are intruded by the Yarunganyi Granite. Numerous major
faults strike close to east-west and o�en contain veins or
vein swarms of quartz, forming ridges. Neoproterozoic to
PalaeozoicsedimentaryrocksoftheNgaliaBasinoverliethe
Aileron basement in the southwest of the tenement and
along the southern boundary.
• Mineralisa�on is considered to be epigene�c intrusion-
related breccia and vein mineralisa�on with polymetallic
copper-lead-zinc-silver-molybdenite and tungsten.
Mineralisa�on is interpreted to be from varied sources and
associa�ons as evidenced from mineralisa�on da�ng.
• The most prominent mineralisa�on is supergene copper at
Silver King with varying lead-zinc-silver in quartz veins and
shear zones.
17
Criteria JORC Code explana�on Commentary
Drill hole
Information
• A summary of all information material to the understanding of
the exploration results including a tabulation of the following
information for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that
the information is not Material and this exclusion does not
detract from the understanding of the report, the Competent
Person should clearly explain why this is the case.
• No drilling or assaying is reported in this report.
Data
aggregation
methods
• In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations (e.g.
cutting of high grades) and cut-off grades are usually Material
and should be stated.
• Where aggregate intercepts incorporate short lengths of high
grade results and longer lengths of low grade results, the
procedure used for such aggregation should be stated and some
typical examples of suchaggregations shouldbe shownindetail.
• The assumptions used for any reporting of metal equivalent
values should be clearly stated.
• No drilling or assaying is reported in this report.
Relationship
between
• These relationships are particularly important in the reporting of
Exploration Results.
• No drilling or assaying is reported in this report.
18
Criteria JORC Code explana�on Commentary
mineralisati
on widths
and
intercept
lengths
• Ifthegeometryofthemineralisationwithrespecttothedrillhole
angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are reported,
there should be a clear statement to this effect (e.g. ‘down hole
length, true width not known’).
Diagrams • Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view
of drill hole collar locations and appropriate sectional views.
• Projectloca�onmapandplanmapofthedrillholeloca�ons
with respect to each other and with respect to other
available data are included in the text.
• Drill hole loca�ons have been determined with hand-held
GPS drill hole collar loca�on (Garmin GPS 78s) +/- 5m in
X/Y/Z dimensions.
• Refer to Sec�on 6 and 7 of the Independent Geologists
Report (IGR) by Ross et al., 2023.
Balanced
reporting
• Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high
grades and/or widths should be practiced to avoid misleading
reporting of Exploration Results.
• Individual gravity readings have not been reported, plans
within this report provide an adequate overview of the
ground gravity data.
Other
substantive
exploration
data
• Other exploration data, if meaningful and material, should be
reported including (but not limited to): geological observations;
geophysical survey results; geochemical survey results; bulk
samples – size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
• See the main body of this report for all per�nent
observa�ons and interpreta�ons.
19
Criteria JORC Code explana�on Commentary
substances.
Further
work
• The nature and scale of planned further work (e.g. tests for
lateral extensions or depth extensions or large-scale step-out
drilling).
• Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling
areas, provided this information is not commercially sensitive.
Future planned explora�on includes:
• Final fully processed VTEM and interpreta�on
• Ground-based moving loop EM (“MLEM”)
• Geological mapping and geochemical surveys/ sampling
• RAB/RC/DD drill tes�ng.
20
Share your feedback