VTEM Survey Uncovers Multiple High Priority Sulphide Targets
Released
Released
Announcement PDF
ASX Announcement 21st
August 2025
Oonagalabi VTEM Survey Uncovers Multiple High Priority Sulphide
Targets – Drilling September
Key highlights
• Preliminary VTEM survey data defines five conductor clusters at the Oonagalabi project.
• Fourteen Priority 1 targets interpreted with possible sulphide source.
• Conductor clusters 1, 2 and 3 are broadly located at the same stratigraphic horizon that hosts
Oonagalabi mineralisation, folded within the Oonagalabi Anticline.
• Conductor cluster 3 flanks the southern Bomb Diggity magnetic anomaly within a prominent
structural position less than 500m from outcropping mineralised Oonagalabi Formation.
• Drill pad / track earthworks in early September; drilling to begin mid-September, starting at
“Bomb Diggity”, then stepping into potential gold-rich zones at Oonagalabi and select VTEM
conductors (subject to clearances and station coordination).
Litchfield Identifies 14 Priority 1 Conductors at Oonagalabi – Strong Sulphide Potential Emerging
Litchfield Minerals (ASX: LMS) (“Litchfield” or “the Company”) is pleased to reporta highly encouraging
set of preliminary conductor anomaly picks from the recently completed VTEM survey at its flagship
Oonagalabi Project, located 125km northeast of Alice Springs. The survey was co-funded by the
Northern Territory Government’s Geophysics and Drilling Collaborations (GDC) Grant, demonstrating
growing regional support for LMS exploration efforts.
The initial interpretation based on preliminary data, completed by renowned geophysicist Kate Hine of
Mitre Geophysics, has highlighted fourteen (14) Priority 1 conductors with strong indications of a
sulphide source (Figure 1). This is a significant development and reinforces our belief that Oonagalabi
has the potential to be a major mineralised system.
Importantly:
• Five conductive clusters have been delineated across the project area.
• Three of these clusters sit directly within the interpreted mineralised horizon that hosts the
existing Oonagalabi copper-zinc system.
• A fourth cluster is located deeper within the nose of the Oonagalabi Anticline, potentially
representing new, structurally-controlled mineralisation.
• A fifth cluster, located in the foothills of the Harts Range within the Irindina Province, opens up
an exciting regional discovery opportunity.
Additionally, weaker conductors coinciding with zonesof strong IP chargeability were identified directly
at the known Oonagalabi prospect, providing a potential link between near-surface disseminated
mineralisation and deeper sulphide-rich zones.
Managing Director Matt Pustahya said:
“These VTEM results have significantly advanced our understanding of the scale and potential of the
Oonagalabisystem.Identifyingfivedistinctclustersofconductors —includingseveralwithclearsulphide
signatures in the same horizon as known mineralisation — is a major leap forward.
The emergence of the Bomb Diggity structural corridor as a potential heat and metal source, combined
with a suite of high-priority targets along strike from historical intercepts, gives us a strong runway
heading into drilling.
WithfieldvalidationunderwaynextweekanddrillpadsbeingpreparedinearlySeptember,we’removing
rapidly toward a high-impact drill campaign targeting both copper-zinc and gold systems. We believe
this could be a transformative quarter for Litchfield and our shareholders.”
Figure 1. Google satellite image of the Oonagalabi project showing the preliminary VTEM conductive
anomaly picks, the five main conductor clusters and the folded prospective horizon within the broader
Oonagalabi Anticline.
Conductive Cluster 1
This linear cluster of strong, late-time conductors is a likely candidate for a semi-massive to massive
sulphide source (Figure 1). Modelling suggests a conductor of 400m strike withmoderate conductance
(100S) and around 150m depth (Figure 2). The conductors are located on the inner eastern limb of the
Oonagalabi Anticline and are interpreted to be located within a similar stratigraphic horizon as
mineralisation at Oonagalabi and Silverado. Oonagalabi mineralisation is potentially of sedimentary
exhalative origin (SEDEX) and so it is particularly encouraging to see such a strong conductive response
at this position.
Conductive Cluster 2
This cluster of late-time anomalies is located 6km along strike to the southwest from Cluster 1 and is
interpreted to be hosted within the same prospective horizon as Oonagalabi. Modelling indicates a
strike estimate of 600m,shallow depth (50 –100m) with highconductance(200S)and of likelysulphide
source (Figure 3). Suspected parallax complicated modelling into separate sulphide sources but will be
corrected upon receipt of final data and will most likely resolve into one or two discrete conductors.
The anomaly is located 1.2km east of a zone mapped by the NTGS as serpentinite1
(metamorphosed
ultramafic), however, field inspections in early August identified rocks remarkably similar to some calc-
silicates observed within the mineralised Oonagalabi Formation. Further field mapping is required to
determine if this outcrop zone is related to the conductive cluster 1.2km to the west. The ultramafic
association will be investigated further given the potential for magmatic Nickel-Sulphide systems within
the broader Irindina Province.
Conductive Cluster 3
Thisseriesofmoderateconductorsislocatedimmediatelynorthofaprominenteast-trendingstructure
in the south of the Bomb Diggity prospect where the prospective Oonagalabi Formation is interpreted
to be located at depth below mafic granulite and felsic gneiss mapped at surface. The conductor is
immediatelyadjacenttotheupperpartsoftheBombDiggitymagneticanomaly. Thismagneticanomaly
is most likely a magmatic intrusion that may have contributed heat and/or metal-bearing fluids directly
into the broader Oonagalabi system.
Conductive Clusters 4 and 5
Modelling of Conductive cluster 4 shows a clear single peak, early to late-time response that is
coincident with a magnetic anomaly. The anomaly is small (100 x 50m), shallow (50m depth), with a
highly conductive source (300S), most likely from sulphides. The area is located stratigraphically above
the Oonagalabi formation, deeper into the nose of the Oonagalabi Anticline. Conductive cluster 5 is
located within the Mt Riddock Amphibolite in the foot hills of the Harts Range in the Irindina Province.
It is a weak, narrow, single peak response extended from early to late time. Modelling suggests that
this source is small (55 x 15m) and highly conductive (300S) plate and is most likely related to Virginia-
type structurally-controlled copper mineralisation.
1
Shaw etal.,1984.Arltunga - HartsRange Region,NorthernTerritory :100,000 explanatory notes
Figure 2. Conductive Cluster 1 VTEM plate model Also shown is VTEM data for lines L1460 and its
modelled response (orange profiles), showing a good fit to the data in the Z and X components (Y
polarity reversed).
Figure 3. Conductive Cluster 2 VTEM models Strike length of at least 600m, depth << 100m
Along mag feature In a complex geological setting data.
Planned drilling – mid-September start
The Company plans to commence drilling in mid-September. Earthmoving contractors are scheduled
for 5–6 September to prepare a small number of pads and short spur access as required. The program
will:
• Kick off at “Bomb Diggity” (intrusion-related target);
• Test selected Priority 1 VTEM conductors; and
• Additional explorationholes totest interpreted gold-rich targetsat Oonagalabi, includingBomb
Diggity.
Next steps
1. Ground-truthing conductors from the 25th
of August, access checks and collar planning across
the priority conductors.
2. Finalise drill plan on receipt of final VTEM products.
3. Mobilise earthmoving (5–6 Sept) and commence targeted drilling campaign mid-September.
4. Ongoing market updates as targets are cleared and drilled.
Cautionary Statement
This announcement contains forward-looking statements that involve known and unknown risks,
uncertainties, and other factors that may cause actual results, performance, or achievements to differ
materially from those expressed or implied. Such statements include but are not limited to,
interpretations of geophysical data, planned exploration activities, and potential mineralisation
outcomes. Forward-looking statements are based on Litchfield Minerals Limited’s current
expectations, beliefs, and assumptions, which are subject to change in light of new information, future
events, and market conditions. While the Company believes that such expectations and assumptions
are reasonable, they are inherently subject to business, geological, regulatory, and operational risks.
Further work, including drilling, is required to determine the economic significance of any anomalies
identified. Investors should not place undue reliance on forward-looking statements. Litchfield
MineralsLimited disclaims any obligation to update orrevise anyforward-lookingstatements toreflect
events or circumstances after the date of this announcement, except as required by law.
About Litchfield Minerals
Litchfield Minerals is a critical mineral explorer, primarily searching for base metals and uranium out of
the Northern Territory of Australia. Our mission is to be a pioneering copper exploration company
committed to delivering cost-effective, innovative and sustainable exploration solutions. We aim to
unlockthefullpotentialofcopperandothermineralresourceswhileminimisingenvironmentalimpact,
ensuring the longevityandaffordabilityof thisessential metalfor future generations. We are dedicated
to involving cutting-edge technology, responsible practices and stakeholder collaboration drives us to
continuously redefine the industry standards and deliver value to our investors, communities and the
world.
The announcement has been approved by the Board of Directors.
For further information please contact:
Matthew Pustahya
Matthew@litchfieldminerals.com.au
Follow us on:
www.litchfieldminerals.com.au
https://twitter.com/Litchfield_LMS
https://www.linkedin.com/company/litchfield-minerals-limited/
Competent Person’s Statement
The information in this announcement relates to Exploration Results and is based on, and fairly
represents, information and supporting documentation compiled by Mr Russell Dow (MSc, BSc Hons
Geology), a Competent Person who is a Member of the Australian Institute of Mining and Metallurgy
(AUSIMM) and is a full-time employee of Litchfield Minerals Limited. Mr Dow has sufficient sampling
experience that is relevant to the style of mineralisation and types of deposits under consideration and
to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC
Code). MrDowconsentstothe inclusioninthePublic Report ofthemattersbasedon theirinformation
in the form and context in which it appears. With regard to the Company’s ASX Announcements
referenced in the aboveAnnouncement, the Companyis notaware of any new information or datathat
materially affects the information included in the Announcements.
JORC Code, 2012 Edition – Table 1 report
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard measurement
tools appropriate to the minerals under investigation, such
as down hole gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as limiting the
broad meaning of sampling.
• Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of mineralisation that are
Material to the Public Report.
• In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as where
The instruments and parameters used for the VTEM survey are as
follow:
• The VTEM survey was flown by UTS Geophysics Pty. Ltd.
• Heliborne electromagnetic data was acquired with VTEMTM
Max transmitter frequency of 25Hz, loop diameter 35m and
mean terrain clearance height of 35m.
• Line spacing was 200m across the full survey area with the
central 40% of the survey also flown at 100m.
• Three-dimensional plate modelling of VTEM preliminary
data was Kate Hine at Mitre Geophysics.
• VTEM anomalies were modelled with industry standard
Maxwell EM software – utilizing thin conductor plate
scenarios for various, most relevant EM channel windows.
VTEM final data was imported into Maxwell EM software
using Geosoft/oasis database files. Resultant model
scenarios for each of the five areas were exported to both
Criteria JORC Code explanation Commentary
there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of detailed
information.
3D DFX and GIS plan view formats to aid follow-up ground
EM optimization and consideration.
Drilling
techniques
• Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (e.g.
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc).
• No new drilling is reported
Drill sample
recovery
• Method of recording and assessing core and chip sample
recoveries and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
• No new drilling is reported
Logging • Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
• No new drilling is reported
Criteria JORC Code explanation Commentary
• Whether logging isqualitativeorquantitativeinnature.Core
(or costean, channel, etc) photography.
• The total length and percentage of the relevant intersections
logged.
Sub-
sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter, half or all
core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc
and whether sampled wet or dry.
• Forall sample types,thenature,qualityandappropriateness
of the sample preparation technique.
• Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
• Measurestakentoensurethatthesamplingisrepresentative
of thein situ material collected, including for instance results
for field duplicate/second-half sampling.
• Whether samplesizes areappropriatetothegrainsizeof the
material being sampled.
• No new drilling is reported
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
• Transmitter loop diameter: 35m
• Peak dipole moment – 700,000 NIA
• Transmitter Pulse Width – 7ms
• VTEM Max Receiver – Z, X coils (Y optional)
Criteria JORC Code explanation Commentary
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.
• Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (i.e. lack of bias)
and precision have been established.
Verification
of sampling
and assaying
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primarydata,data entryprocedures,data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Data detailed in this report has been reviewed and
processed by Mitre Geophysics.
Location of
data points
• Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings and
other locations used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• The navigation system used was a UTS PC104 based
navigation system utilizing a NovAtel WAAS (Wide Area
Augmentation System) enabled GPS receiver, UTS navigate
software, a full screen display with controls in front of the
pilot to direct the flight and a NovAtel GPS antenna
mounted on the helicopter tail. As many as 11 GPS and
two WAAS satellites may be monitored at any one time.
The positional accuracy or circular error probability (CEP) is
1.8m, with WAAS active, it is 1.0m. The co-ordinates of the
Criteria JORC Code explanation Commentary
block were set-up prior to the survey and the information
was fed into the airborne navigation system.
• AltitudecontrolusedtheFreeFlightSystemsTRA-3000radar
altimeter with altitude range (40 to 2500ft), altitude
accuracy(40to100 ft.±5ft.,100 to500 ft.±5%,500 to2500
ft. ±7%) and sample rate of 10Hz.
• Co-ordinates are in GDA94 datum, Zone 53.
Data spacing
and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• The full EL 32279 was flown at 200m line-spacing with a
central 40% of the survey flown at 100m infill line-spacing.
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this
is known, considering the deposit type.
• If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
haveintroducedasamplingbias,thisshouldbeassessedand
reported if material.
• Flight lines were orientated northwest - southeast to run
perpendicular to most of the structures and geology of the
area.
Criteria JORC Code explanation Commentary
Sample
security
• The measures taken to ensure sample security. • All data was collected under strict security measure by UTS
Geophysics Pty Ltd.
Audits or
reviews
• The results of any audits or reviews of sampling techniques
and data.
• Data checks and processing reviews were undertaken daily
and at the completion of the program by the contractor.
• Review of the data was undertaken by an independent
consultant Mitre Geophysics.
JORC Code, 2012 Edition – Table 1 report
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral
tenement
and land
tenure status
• Type, reference name/number, location and ownership
including agreements or material issues with third parties
such as joint ventures, partnerships, overriding royalties,
native title interests, historical sites, wilderness or national
park and environmental settings.
• The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to
operate in the area.
• Tenement includes Oonagalabi (EL32279) for a total of
145.3km2 and 46 sub-blocks.
• EL32279 is owned by Kalk Exploration Pty. Ltd., a 100%
ownedentityofLitchfieldMinerals Limited. Thetenement is
located approximately 125km northeast of Alice Springs on
pastoral leases.
• The tenement is in good standing and there are no known
impediments.
Exploration
done by
other parties
• Acknowledgment and appraisal of exploration by other
parties.
• A summary of previous EL32279 exploration and mining is
presented below:
• Oonagalabi was discovered in the 1930’s.
• In 1970, Russgar Minerals completed regional mag-rad
survey, VLF_EM survey, ground magnetic survey, single line
resistivity traverse and 14 drillholes.
• In 1971, Geopeko completed limited IP.
Criteria JORC Code explanation Commentary
• 1979, Amoco completed photo-interpretation, rock chip
sampling and drilling (8 holes).
• 1981 D’Dor Mining NL completed limited dipole-dipole IP.
• Between 1990 – 1996 on EL 6940 Clarence River Finance
Group explored for garnet in the Florence and Maud Creeks,
collecting 15 samples that averaged 4.4% garnet
• Between 1997 – 2000 on EL 9420 Clarence River Finance
Group completed garnet exploration north of Oonagalabi
EL32279. In 2007, ML 22624 was applied for to cover the
centralOonagalabidepositandsurroundingproximalalluvial
systems (outside 2025 bulk sampling area). No work was
completed and the ML was relinquished in 2019.
• Silex 2009 completed pole-dipole IP 1 x diamond hole.
Geology • Deposit type, geological setting and style of mineralisation. • The Oonagalabi-type mineralisation is considered to be
either skarn-related, sediment-hosted or carbonate
replacement with potential for high-grade remobilised
breccia zones similar to the Jervois deposit. EL32279 falls
within one of Geoscience Australia’s IOCG high potential
zones.
Criteria JORC Code explanation Commentary
• The project lies within the Harts Range that represents a
package of multiply deformed and metamorphosed
sedimentary and igneous intrusive rock.
Drill hole
Information
• A summary of all information material to the understanding
of the exploration results including a tabulation of the
following information for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• Iftheexclusionofthisinformationisjustifiedonthebasisthat
the information is not Material and this exclusion does not
detract fromtheunderstandingof thereport,theCompetent
Person should clearly explain why this is the case.
• No new drilling reported
Data
aggregation
methods
• In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations
• No aggregation methods were used during bulk sampling
Criteria JORC Code explanation Commentary
(e.g. cutting of high grades) and cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts incorporate short lengths of
high grade results and longer lengths of low grade results,
the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be
shown in detail.
• The assumptions used for any reporting of metal equivalent
values should be clearly stated.
Relationship
between
mineralisatio
n widths and
intercept
lengths
• These relationships are particularly important in the
reporting of Exploration Results.
• If the geometry of the mineralisation with respect to the drill
hole angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are
reported,thereshouldbeaclearstatementtothiseffect(e.g.
‘down hole length, true width not known’).
• Nodrillingresultsreported. Thebulksampleswerecollected
parallel to the flow direction of the Clarence River.
Diagrams • Appropriate maps and sections (with scales) and tabulations
of intercepts should be included for any significant discovery
being reported These should include, but not be limited to a
plan view of drill hole collar locations and appropriate
sectional views.
• See figures within the main body of the announcement.
Criteria JORC Code explanation Commentary
Balanced
reporting
• Where comprehensive reporting of all Exploration Results is
not practicable, representative reporting of both low and
high grades and/or widths should be practiced to avoid
misleading reporting of Exploration Results.
• All available relevant information is presented.
Other
substantive
exploration
data
• Otherexplorationdata,ifmeaningfulandmaterial,shouldbe
reported including (but not limited to): geological
observations;geophysicalsurveyresults;geochemical survey
results; bulk samples – size and method of treatment;
metallurgical test results; bulk density, groundwater,
geotechnical and rock characteristics; potential deleterious
or contaminating substances.
• See the main body of this report for all pertinent
observations and interpretations.
Further work • The nature and scale of planned further work (e.g. tests for
lateral extensions or depth extensions or large-scale step-out
drilling).
• Diagrams clearly highlighting the areas of possible
extensions,including themain geological interpretationsand
future drilling areas, provided this information is not
commercially sensitive.
Future planned exploration includes:
• Field validation of Priority 1 conductors
• Earthworks for drillhole pads and tracks
• RC drilling of priority conductors, gold targets and the Bomb
Diggity magnetic anomaly.
Share your feedback
Discover