Weather events defer drilling, focus turns to Oonaglabi
Released
Released
Announcement PDF
ASX Announcement | 26th November, 2024
Weather events defer Mount Doreen drilling so focus turns to
Oonaglabi.
Highlights
• A new weather system passed through central Australia over the weekend, bringing
heavy, intermittent rain over Mount Doreen with more forecast over the coming
weeks. Whilst typical during this time of year, the rain impacts safe access and
operational conditions across the project sites, so we are enacting our planned back-
up programme.
• Planned activities, including track preparation and drilling, will resume as soon as
conditions stabilise, which is currently anticipated to be early 2025.
• Despite having to re-programme the Mount Doreen drilling campaign, the recent
geophysical surveys at Patmungula and Mount Irene have reinforced the strong
potentialofourtargetsandweremaincommittedtounlockingknowledgeabouttheir
potential mineral wealth.
• The end-of-year focus has quickly pivoted to the Oonagalabi Project, where we plan
to conduct a high-resolution Drone Magnetic Survey, develop a 3D Induced
Polarisation (IP) model and extend soil geochemistry sampling further north of the
known dataset to explore untested zones.
Litchfield Minerals Limited (“Litchfield” or the “Company”) (ASX:LMS), a company with a
strategic emphasis on critical minerals, is announcing the need to enact back-up plans to
ensure the safetyof ourpersonnel and contractors due to recent weather systems across the
Mount Doreen areas, which will delay our plans for end-of-year drilling, however, enables
earlier-than-expected work on the Oonagalabi project.
Managing Director and CEO, Matthew Pustahya, commented:
Managing Director’s Comment
“I am currently on site with the team, and we have had to make the difficult decision to enact
our back-up plan for our drilling program. As mineral explorers, we are always at the mercy
of the elements, and while this delay to our Mount Doreen drilling campaign is disappointing,
the safety of our team and consultants must always take precedence. However, this pause
presents an immediate opportunity to refine our exploration strategy further. The targets
identifiedat Mount Doreenareexceptionally promisingandwe remainconfident that drilling,
now rescheduled for February 2025, will deliver exciting results.
To make the most of this time, we are using this time to focus on the highly prospective
Oonagalabi Project. Our plans for December include a drone magnetic survey, 3D inversion
modelling of the high quality 2008 IP dataset, and extending soil sampling further north.
These initiatives aim to progress Oonagalabi to having drill-ready targets earlier than initially
planned. Importantly, this approach enables us to potentially transition seamlessly from
drilling at Mount Doreen to Oonagalabi early next year, paving the way for a robust pipeline
of exploration activity and the potential for multiple successes.
I want to thank our shareholders for their continued support and I wish to demonstrate to
them that we remain nimble and working diligently with their investments. This strategic
approach not only reinforces our commitment to safety and operational excellence but also
ensureswemanageshareholderfundsprudentlywhilemaintainingthemomentumacrossour
portfolio."
Safety, Financial Responsibility and Prudent Re-scheduling at Mount Doreen
RecentforecastspredictacontinuationofsignificantweathersystemsinthecentralNorthern
Territory area, bringing substantial early rainfall across the Mount Doreen region. This
development has impacted our ability to commence the planned drilling program for the
year-end. While this delay is unfortunate for all of us, the safety of our team and consultants
is paramount. As we learnt during our first drilling campaign, proceeding under such
conditions would not only compromise safety but also lead to significantly higher costs due
to logistical challenges.
Asaresult,drillingatMountDoreenisnowscheduledtocommenceearly2025,onceweather
conditions are more favourable. This decision allows us to ensure the safety of operations
and minimise standby costs which manages cash flow prudently, thereby aligning with our
commitment to maximising shareholder value.
Positive Outlook on Mount Doreen Targets
The results of our recent MLEM and IP surveys at Dumunzi, Patmungula, and Mount Irene
haveidentifiedrobustanomalies,highlightingthesignificantpotentialofthesetargets. While
the deferment of drilling is disappointing, these findings reinforce a bullish outlook for the
overall program. We remain eager to commence drilling next year under optimal conditions,
confident in the high-impact nature of these targets.
Strategic Focus end of year focus on Oonagalabi
To capitalise on the remaining month of this year, Litchfield will intensify exploration efforts
at the OonagalabiProject inthe HartsRange.Thispolymetalliccopper-zincprojecthasshown
considerable promise, and additional work will help refine our understanding of its potential.
Planned activities include:
• Drone Magnetic Survey: A high-resolution drone survey (100m line-spacing) will be
completedtoimprovethequalityofthemagneticdataandimproveourstructuraland
geological understanding of the Oonagalabi prospect. The existing magnetic dataset
(400m line-spacing,variable flightheight)istoo low resolutionto definethe prospect-
scale structures that host high-grade mineralization or the subtle magnetic anomalies
associated with the magnetite-bearing alteration assemblages.
• Induced Polarisation (IP) 3D Modelling: Inversion modelling of the high-quality 2008
IP dataset will be completed to produce a 3D model of chargeability and resistivity.
Remarkably, only two historic holes have been drilled within the Oonagalabi IP
chargeability zones and the data is considered untested (PDH-G = 33.6m and PDH-H =
18m). It is anticipated that 3D IP modelling will define extensions to known
mineralization and refine deeper target zones that will be assessed with Phase 1
drilling in early 2025.
• Soil Sampling Campaign: The existing soil grid will be extended to the northeast to
target interpreted extensions of the mineralized system in an area with a significant
chargeability anomaly.
The aim of these efforts is to position Oonagalabi as a seamless follow-up target after Mount
Doreen. If we are successful in obtaining enough data, we anticipate mobilising the drill rig
directly from Mount Doreen to Oonagalabi, creating an excellent runway for multiple
exploration successes in early 2025.
Cautionary Statement
Conductive VTEM targets presented in this announcement have been interpreted to
represent basement conductors relating to semi-massive or massive sulphides, however, it is
unclear if base metal sulphides are present. Ground EM is required to confirm the basement
source and conductor geometry ahead of RC drilling.
Forward looking statement
This announcement may include forward-looking statements, which are subject to risks and
uncertainties. Actual results could differ significantly due to factors beyond LMS’s control,
including market conditions and industry-specific risks. These forward-looking statements
are based on the Company’s expectations and beliefs concerningfuture events. No warranty
is given regardingthe completeness of the information provided. Pleaseavoid placing undue
reliance on forward-looking statements, as they reflect views only as of the announcement
date.
About Litchfield Minerals
Litchfield Minerals is a critical mineral explorer, primarily searching for base metals and
uranium out of the Northern Territory of Australia. Our mission is to be a pioneering copper
exploration company committed to delivering cost-effective, innovative and sustainable
exploration solutions. We aim to unlock the full potential of copper and other mineral
resources while minimising environmental impact, ensuring the longevity and affordability of
this essential metal for future generations. We are dedicated to involving cutting-edge
technology, responsible practices and stakeholder collaboration drives us to continuously
redefinetheindustrystandardsanddelivervaluetoourinvestors,communitiesandtheworld.
The announcement has been approved by the Board of Directors.
For further information please contact:
Matthew Pustahya
Matthew@litchfieldminerals.com.au
Follow us on:
www.litchfieldminerals.com.au
https://twitter.com/Litchfield_LMS
https://www.linkedin.com/company/litchfield-minerals-limited/
Competent Person’s Statement
The information in this Presentation that relates to Exploration Results is based on, and fairly
represents, information and supporting documentation compiled by Mr Russell Dow (MSc,
BScHonsGeology),aCompetentPersonwhoisaMemberoftheAustralian InstituteofMining
and Metallurgy (AUSIMM) and is a full-time employee of Litchfield Minerals Limited. Mr Dow
has sufficient experience that is relevant to the style of mineralisation and types of deposits
under consideration and to the activity beingundertaken to qualify as a Competent Person as
defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves” (JORC Code). Mr Dow consents to the inclusion in the
report of the matters based on his information in the form and context in which it appears.
With regard to the Company’s ASX Announcements referenced in the above Announcement,
the Company is not aware of any new information or data that materially affects the
information included in the Announcements.
Edition – Table 1 report
Share your feedback
Discover